Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An experimental and numerical study of two-way splits and junctions in mine airwaysBy R. K. Jade
Although several studies in combining and bifurcating flows in two-way junctions and splits are reported, deviations persist in the estimated shock loss coefficients (SLCs). Due to their complex natur
Jan 1, 2009
-
An Integration Of Long-Term Mine Planning, Tailings And Reclamation PlansOil sands processing generates huge volumes of slurry, known as tailings, that is being stored in tailings ponds. The volume of produced tailings is a very important factor in oil sands surface mine p
Feb 27, 2013
-
AMC Hill of Value®: Strategic Mine Optimization and Real Options Analysis at Industrial Scal - SME Annual Meeting 2026By Derek du Preez, Andrew Hall, Timothy M. Pelech
Net Present Value (NPV) derived from Discounted Cash Flow (DCF) analysis remains the dominant metric for evaluating mining projects despite its well-documented inability to capture managerial flexibil
Feb 22, 2026
-
Improving Productivity in Thin-Seam Continuous Mining at TanomaBy Scott G. Britton
Thin-seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges can be further amplified depending on such factors as la
Jan 1, 1991
-
Micro Tunneling 1.2-Mile, 72-In RCP With Crossings Of NJ Turnpike And CSX RailroadsBy Zhenqi Cai
The ongoing Overpeck Valley Parallel Sewer Project of Bergen County Utilities Authority (BCUA), New Jersey, is a US $65 million CSO improvement program to meet a State DEP consent order by 2010. One m
-
Laboratory Evaluation Of Shield Dust Entrainment In High Velocity Airstreams (913d8715-0740-44d1-b301-b965be654afd)In conjunction with steady increases in production levels, longwall operators have applied greater quantities of ventilating air and spray water in an effort to control respirable dust and/or methane.
Jan 1, 2001
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
The SARMa Project: enhancing sustainable aggregates resource management and supply in Southeast EuropeBy S. Šolar
The countries of Southeast Europe are rich in aggregates, but neither management nor supply are coordinated within or across this area. There are open issues in SEE on the local scale as well as on re
Jan 1, 2011
-
RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case HistoriesBy K. Y. Haramy, K. Hanna
Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min
Jan 1, 1999
-
Incorporation Of Silicate Buffering In Predicting Acid Rock Drainage From Mine Wastes: A Mechanistic ApproachBy A. D. Nicholson
This paper presents an approach to quantitatively calculate the neutralization of acid by silicate minerals, based on the chemical kinetics of acid reacting with silicates. This approach incorporates
Jan 1, 2002
-
Air Pollution Control Through Wet Dust Suppression1. Theory of Wet Dust Suppression Techniques Wet dust suppression is the utilization of a liquid for the control, reduction or elimination of airborne dust, or the suppression of such dust at its sou
Jan 1, 1972
-
Rockmass Permeability Induced by Longwall Mining Under Deep Cover: Potential Gas Inflow from a Sheared Gas WellBy Steven J. Schatzel, Kayode M. Ajayi, Bo H. Kim, Zoheir Khademian, Gabriel S. Esterhuizen
The stability of shale gas wells drilled through current and future coal reserves can be compromised by ground deformations due to nearby longwall mining. Depending on the longwall-induced rockmass pe
Jun 19, 2022
-
Assessment of equipment operator?s noise exposure in western underground gold and silver minesBy Ellsworth R. Spencer
An assessment of U.S. western hardrock miners? noise exposures was conducted as part of a multi-year National Institute for Occupational Safety and Health (NIOSH) survey of noise exposures in each sec
Jan 3, 2010
-
Design Of Impoundment And Evaporation Ponds And Embankments For Cyanide And Other Toxic EffluentsBy George C. Toland
Most existing impoundment ponds and dams leak effluent into the soil or rock upon which they are constructed. However, proposed environmental legislation will require very stringent control on the rel
Jan 1, 1975
-
The Exploration And Development Of Nickel LateritesBy Randall J. Weege
Nickel laterites throughout the world are similar in their gross aspects, but vary significantly in detail. The deposits occur in two separate and distinct geologic settings --those formed over ultram
Jan 1, 1978
-
Development of a new method for quality control in the quarry industry for practicing sustainabilityBy H. Tudeshki, A. Tayebi
"The large extent of global production and consumption of aggregates from quarries, grabs one´s attention and makes its substantial and essential standpoint in the world today pretty clear. A great am
Jan 1, 2011
-
Foam Property Tests to Evaluate the Potential for Longwall Shield Dust ControlBy W. R. Reed, S. Klima, J. Driscoll, T. W. Beck
"Tests were conducted to determine properties of four foam agents for their potential use in longwall mining dust control. Foam has been tried in underground mining in the past for dust control and is
Jan 1, 2018
-
Using Meaningful Reconciliation Information To Evaluate Predictive Models (f422be80-ebd4-4e59-9f97-b10db17502b0)By M. E. Rossi
Reconciliation of production information is critical to evaluating the effectiveness of the predictive models, and to allow for optimization of mining operations. Whether mining open pit or undergroun
Jan 1, 1999
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Pouring N2 Into Goaf To Prevent The Fire And Gas Problems In Fully Mechanized Sublevel Caving Coal FaceBy Jin Anshi, Wang Dai, Wang Zingshen
Both fire and gas problems in Fully Mechanized Sublevel Caving Coat Face are quite different from those in common fully mechanized coal face. Pouring N2into the goaf would be the best method to preven
Jan 1, 1991