Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Evaluation of the Relative Safety of U.S. Mining Explosion-Protected Equipment Approval Requirements versus Those of International StandardsBy J. F. Burr, D. Snyder, W. Calder
"INTRODUCTION “Explosion protection” refers to techniques used to minimize the potential for electrical and electronic equipment to create an ignition while operating in a hazardous location (HAZLOC).
Jan 1, 2017
-
Drug screening : One company’s obstacle-filled road to a successful programBy Jim Wilcox
Introduction In 1979, rumors of a developing drug problem within IMC Fertilizer's Carlsbad, NM workforce began to surface. For the next two years, a management team contacted local, state, and f
Jan 11, 1987
-
Modified Tail Section Reduces Noise On A Continuous Mining MachineBy J. J. Zimmerman
Over-exposure to noise remains a widespread, serious health hazard in the U.S. mining industries. Most other categories of illnesses and injuries associated with mining have improved, with the excepti
Jan 1, 2010
-
Effect Of Leaching On Permeability Of Copper OresBy N. R. Sainath
This paper discusses the results of a laboratory investigation carried out to study the microscale flow characteristics of copper ores and the variation in flow behavior resulting from flow of leach s
Jan 1, 1991
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (1998)The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1998
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (1999)By K. H. McDaniel
The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1999
-
Lac Tio Ilmenite Deposit ? IntroductionBy E. O. Dearden
In the ten years since its discovery the Lac Tio ilmenite-hematite deposit has become one of the world's largest sources of titanium ore. The deposit lies 25 miles north Havre St, Pierre, a fi
Jan 1, 1958
-
Asset Maintenance Readiness By Metso Outotec - SME Annual Meeting 2022By E. Gutierrez, P. Gillies
Asset Maintenance Readiness (AMR) provides a tailored reliability and maintenance strategy specific to operational needs. AMR delivers reliability and maintenance foundations for the plant and equipme
Mar 2, 2022
-
Critical comparison of numerical stress analysis tools for deep coal longwall panels under strong strata - SME Transactions 2009By M. K. Larson, J. K. Whyatt
Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element
Jan 1, 2009
-
Site-specific blasting model for mine-to-mill optimization - SME Transactions 2011By J. Kemeny, K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
Baffled-Column Flotation Of A Coal Plant Fine-Waste Stream (c115aacc-9fc7-435d-b4fa-d86803716a49)By S. K. Kawatra
It is common in coal-cleaning operations to produce a fine waste stream which contains a considerable amount of coal, but which is not economical to recover both because it is mixed with large amounts
Jan 1, 1994
-
Development Of Low Temperature Pressure Oxidation At Lone Tree (PRIPRINT 93-86 )By G. L. Simmons
Aqueous pressure oxidation at low temperature, although desirable from a process engineering and operations point of view, presents unique problems when temperatures approach 160°C (320°F). In develop
Jan 1, 1993
-
Utility Scrub/Switch Decisions For Phase I Acid Rain ComplianceBy Eugene M. Trisko
Presentation Overview State-Of-The-Art Scrub/Switch Analyses > Allegheny Power System > PSI Energy UMWA Phase I Coal Interests > 16 Phase I Scrub Plant Coal Profiles > Coal Price/Emissi
Jan 1, 1993
-
Moving Forward on New York’s Second Avenue SubwayBy David Caiden, Geoffrey Fosbrook, Jaidev Sankar, Donald Phillips, Jon Hurt, Anil Parikh
This paper will cover the progress being made on Phase 1 of New York’s Second Avenue Subway line. It will include a description of construction progress on the first contract to be let, which consists
Jan 1, 2007
-
Finite Element Analysis of the Effect of Circumferential Ground Modification on Shaft PerformanceBy D. Kruse, M. Sanaei
"3D finite element models of the Segmentally Lined Shaft (SLS) structure are simulated as means of numerical analyses of the system’s structural behavior. Top-down constructed rings, comprised of prec
Jan 1, 2016
-
Reflections on ilmenite roasting and magnetic separationBy N. R. Allen, J. D. Steenkamp
Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of
Jan 1, 2005
-
Elm Road Generating Station Water Intake TunnelBy Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
Coal Division - Elements In Coal And Potential Environmental Concerns Arising From These ElementsThe Environmental Session will consist of five papers dealing with various aspects of trace elements associated with coal. Analytical procedures to determine the amounts of trace elements will be disc
Jan 1, 1979
-
ISO 14040-42 (LCA) Standard Implementation to Stone Wool’s Production for Environmental Indicators’ Development - Interaction with ISO 14031 StandardBy E. Giama, A. Macridis, A. M. Papadopoulos
ISO 14031 is an international standard that describes a process for measuring environmental performance evaluation by setting quantitative indicators and providing a structured approach for organizati
Jan 1, 2005
-
Record Attendance Turns Out For 2008 Fox ConferenceThe state of the tunneling and underground construction industry and the advancements of the industry?s biggest machines were the main topics at the 2008 edition of the UCA of SME?s annual George A. F
Jan 1, 2008