Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Coal Resources For The Future: Summary Results Of The Us Geological Survey National Coal Resource AssessmentBy B. S. Pierce
The National Coal Resource Assessment – 2000 project was a multi-year effort by the U.S. Geological Survey to identify, characterize, and assess the coal resources that will supply a major part of the
Jan 1, 2001
-
Ilmenite And Associated Heavy Mineral Processing At The P,W. Gillibrand Company's Soledad Canyon MineBy J. C. Heter
The P.W. Gillibrand Company has been processing and stockpiling a suite of heavy minerals at its Soledad Canyon Mine as co-products with construction aggregates since 1984. The heavy minerals are comp
Jan 1, 1992
-
The Agemera - Agile Exploration And Geo-modelling For European Critical Raw Materials Project: An Initiation To Secure The Supply Chain - SME Annual Meeting 2023By E. -R. Niinikoski, M. A. Islam, H. Mischo, G. Barakos, J. Joutsenvaara, G. Meissner
European Union's transition to a low-carbon and digital economy highly depends on securing the strategic autonomy of the Critical Raw Materials (CRMs) supply chain. This paper introduces a European Co
Feb 1, 2023
-
Evaluation Of Potential AMD Generation From A Deposit Of Copper Ore Using Static Tests (84c851af-cd9c-468a-8ed5-2a96d65342a8)By E. M. R. Santos
Acid mine drainage (AMD) is a serious environmental problem in mining activities. Prediction is the first step for evaluate the potential of acid generation and there are some possible methods to es
Jan 1, 1999
-
The Maximum Economy Smidth/Parsons PreheaterBy Henning R. Norbom
Lime has been produced for many centuries. The simple pot kiln was one of the first devices used in this process. It was constructed of stone often on the side of a hill to reduce construction efforts
Jan 1, 1978
-
Finite Elements And Strip Mining Equipment - IntroductionBy O. E. Wheeler
The term "finite element analysis" is heard and seen in print a great deal these days; a few words on what precisely it is are in order. In the broadest sense, finite element analysis is an applicatio
Jan 1, 1974
-
The Development Of The Fosfago Phosphate Rock Concentrator, BrazilBy M. F. Dibble
The Fosfago phosphate rock concentrator is located in the state of Goias, Brazil, 300 km south of Brasilia. The ore is from an enriched carbonatite, which was discovered in 1971 during exploration for
Jan 1, 1980
-
Risk Management – Correlation and Dependencies for Planning, Design, and ConstructionBy A. Moergeli, Philip Sander, John Reilly
"SUMMARY While the basic elements of risk management, including probability, consequences, risk registers, mitigation measures, etc., are now well understood, the process to include correlation, depen
Jan 1, 2016
-
Radio Remote Control Continuous Miner Operator PositioningBy Robert F. Randolph, Arnold C. Love
This study describes the positioning strategies used by operators of radio controlled underground mining machines. The observations have implications for task design to insure adequate visibility and
Jan 1, 1992
-
Some Interesting Aspects Of Canadian Industrial Minerals ? IntroductionBy R. A. Wyman
What unusual features are there about finding, winning, and using the industrial minerals of Canada which may be of interest and yet not widely known. Have you, for example, ever wondered where the ra
Jan 1, 1970
-
Design Of Stillwater Mining Company's East Boulder MineBy B. Strickland
The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished
Jan 1, 1999
-
Regression Models: Facts And FallaciesBy H. T. McAdams
The logic of regression analysis as an operations research tool is critically examined, and a formal basis for its application to mining problems is developed. The traditional view of regression a
Jan 1, 1966
-
Profitable copper production from low-grade waste oresBy P. I. James, M. R. Baker
This paper examines new copper production from waste-grade ore using Blue Planet Strategies’ DEMET™ (Dynamic Electrode Mining Effluent Treatment) technology, which aims to bridge the practical weak pr
Jan 1, 2014
-
Modeling The Rapid Flotation Of CoalBy F. J. Susko
The Bureau of Mines applied a flotation model to the hydrodynamics of the Bureau-developed rapid flotation system. Rapid flotation is a process which separates the bubble-particle attachment and froth
Jan 1, 1993
-
Rock Fragmentation Size Distribution Prediction and Blasting Parameter Optimization Based on the Muck-Pile Model "Mining, Metallurgy & Exploration (2021)"By YUSONG MIAO, DI WU, XIANRONG YAN, YIPING ZHANG, JIE LIN, KEBIN LI
Rock fragmentation size distribution is often used as an important index to account for the blasting effect because it directly affects the subsequent loading, transportation, and secondary crushing.
Jan 22, 2021
-
Silica Collection Concerns When Using Flooded-Bed ScrubbersLaboratory tests were conducted to evaluate the silica collection efficiency of flooded-bed scrubbers with six different filter panel designs and at two operating velocities. Test results indicated th
Jan 1, 1998
-
Large Wheel Loaders Vs. Cable Shovels (9acf0b92-7e1f-40c8-af51-115dbf7716d0)By M. J. Hrebar
A study was conducted to evaluate the applicability of large wheel loaders (Cat 994 class) as primary loading equipment in open pit iron ore operations. Field visits were made to taconite and gold min
Jan 1, 1996
-
Optimization of Through-The-Earth Radio Communications via Mine Overburden Conductivity EstimationBy M. Ralchenko, C. Samson, M. Svilans, C. Walsh
"Through-the-Earth (TTE) radio has been proposed as a means of emergency communications in mines. The propagation of a TTE radio signal depends chiefly on the subsurface conductivity distribution. Rob
Jan 7, 2018
-
Treatment Of Mine Drainage Using A Passive Biological System: Design Of And Preliminary Results From A Full-Scale SystemBy K. Whiting
In October 1993, the first two of a series of full scale passive biological treatment cells were constructed to treat mine drainage from the Burleigh Mine (located approximately 48 km west of Denver,
Jan 1, 1994
-
The Selection Of Control Equipment For Mineral Processing PlantsBy D. A. Lee
The selection of control system equipment for a mineral plant is based on several criteria, including opera tor interface, supervisory capabilities, ease of maintenance, ease of programming and config
Jan 1, 1988