Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Heavy Metal Removal From Wastewaters Using Low-Cost Materials

    By R. Markovic

    The objective of this research study was the investigation of heavy metal removal from wastewaters of the "SARAKA" stream by using low-cost materials. These wastewaters flow into Krivelj River and thr

    Jan 1, 2006

  • SME
    AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge

    By J. W. Jamieson, J. Escartin, A. Steinführer

    Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C

    Sep 1, 2014

  • SME
    Geology And Mineralization Of The Santa Rosa Gold Deposits, Panama (db14143c-3c9a-4e78-82ee-0b3a79359f96)

    By Don C. White

    Santa Rosa is a mid-Tertiary, volcanic-hosted, bulk-mineable, open-pitable, heap-leachable, gold-silver deposit. It is the product of hydrothermal mineralization along an arcuate segment of a caldera

    Jan 1, 1993

  • SME
    How Public Law 89-577, "The Federal Metal And Nonmetallic Mine Safety Act" Affects The Minerals Processing Industry

    By Arthur P. Nelson

    In opening, I want to thank the program committee and members of the Society of Mining Engineers of AIME for the opportunity to speak to you. Various chapters of AIME this past year have expressed

    Jan 1, 1973

  • SME
    Dust Mitigation through a Program-Based Approach

    By S. R. Clark

    "INTRODUCTION Of all the natural resources being taxed by the needs of the modern world, perhaps the most important is the continually expanding demand for water resources. As water becomes scarcer, a

    Jan 1, 2018

  • SME
    Leaching Of Selenides And Tellurides - Anodic Slimes From Electrolytic Copper Refining

    By Fathi Habashi

    SELENIUM AND tellurium are by-products of electrolytic copper refining. Copper anodes contain 0.01-0.2 % Se and up to 0.04 % Te; during electrolysis these deposit as a slime at the bottom of the cell.

    Jan 1, 1970

  • SME
    The Exploitation Of Sulphur From Salt Dome Deposits

    By R. R. Young

    Prior to 1903, the world's supply of sulphur was primarily from surface deposits in Sicily. The discovery of the first salt dome sulphur deposit in 1867 and successful development of the Frasch p

    Jan 1, 1979

  • SME
    Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

    By Verya Nasri, Mehdi Bakhshi

    The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five

    Dec 1, 2022

  • SME
    Reclamation Of Exxon's Uranium Tailings Basin In Wyoming

    By D. M. Range

    Exxon is reclaiming an 80 hectare (200 acre) Wyoming uranium tailings basin (10 Mt) in accordance with U.S. Nuclear Regulatory Commission requirements. The reclamation plan is designed to control the

    Jan 1, 1989

  • SME
    An AFM Study Of Collectors' Adsorption On Minerals In Copper/Molybdenum Flotation

    An atomic force microscopy (AFM) has been applied to study the adsorption of collectors on mineral surfaces in a copper/molybdenum flotation system. AFM images show that collectors absorb on chalcopyr

    Jan 1, 2012

  • SME
    Platinum-Group Element Ore Forming Process In Mafic Layered Intrusions: Geochemical Evidence From The Stillwater Complex, Montana

    By David D. Lambert

    REE analyses of cumulate plagioclase from the PGE ore zone of the Stillwater Complex indicate that pressure fluctuations in the magma chamber acting on a single magma can- not be responsible for featu

    Jan 1, 1981

  • SME
    Development Of A New Process To Control Scale In The Strip Circuit At The Homestake McLaughlin Mine

    By L. M. Cenegy

    Introduction The formation of scale is common in gold ore processing plants. A working definition of such scale is: "A hard, tightly adhering deposit formed in place by the precipitation of calc

    Jan 1, 1992

  • SME
    Correcting and clarifying the basic locomotive skidding equation

    By L. Adler

    Determining whether a railroad locomotive will skid under varying conditions is a fairly routine, pervasive problem. However, some of the equations provided are wrong, others are at best murky. All re

    Jan 1, 1991

  • SME
    Mineral Hill Mine – A Case Study in Corporate Environmentalism

    By J. W. Danni

    Today's mining industry faces many challenges. Perhaps none is more important than the challenge of improving our industry's public image. Opinion polls document public concern for a clean a

    Jan 1, 1992

  • SME
    Improved Flotation Kinetics By Intense In-Line Agitation

    By G. D. Hood

    The U.S. Bureau of Mines investigated rapid froth flotation through the use of more efficient bubble-particle collisions that improved the overall flotation kinetics. An in-line static mixer efficient

    Jan 1, 1991

  • SME
    Iodine In Northwestern Oklahoma

    By Howard M. Cotton

    Early in 1977, Amoco Production Company and Houston Chemicals, a subsidiary of Pittsburg Plate Glass (PPG) Industries, started producing iodine commercially in northwestern Oklahoma. This is significa

    Jan 1, 1978

  • SME
    Mineral recovery performance in marine mining

    By R. H. T. Garnett

    Recovery performance may be measured in absolute terms or in relative ones that relate the actual mining outcome to what was expected. Consideration is possible in terms of the control exercised by th

    Jan 1, 1999

  • SME
    Houston Pipe Jacking - Large And Small

    By George H. Klein, B. Kent Merritt, Anthony Crisci

    During the past decade, over 114-km (71-mi) of 0.25-m (10-in) to 3.7-m (144-in) finished diameter tunnels have been driven below Metropolitan Houston as part of a major program of water and wastewater

    Jan 1, 1991

  • SME
    Rapid Construction Of The Syar Tunnel Central Utah Project

    By P. R. Busmann, D. J. Rogers

    The Bureau of Reclamation's Syar Tunnel project included excavation of a 9.2 kilometer (5.7 mile) long, 3.6 meter (11.8 ft) diameter tunnel through gently dipping sedimentary rocks consisting of

    Jan 1, 1991

  • SME
    Gold And Base Metal Recovery From A Massive Sulfide Ore

    By W. W. Simpson, S. A. N. Sheya

    A procedure was developed by the U.S. Bureau of Mines for recovering gold, silver, cobalt, copper, and zinc from a massive sulfide ore by a hydro-metallurgical process. The procedure consists of (1) o

    Jan 1, 1990