Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Experimental and Numerical Modeling of Jet Fans for Auxiliary Ventilation in MinesBy E. Topuz, M. J. McPherson, I. M. Konduri
This paper describes experiments conducted to evaluate the effectiveness of jet fans for ventilating blind headings in under- ground mines. A laboratory model of a mine heading was built by using dyna
Jan 1, 1997
-
An Engineered Grouting System Developed for the Inter-Island Tunnel, Boston, MassachusettsBy David R. Klug, Chris Gause, Troy L. Page
The Inter-Island Tunnel is one of two undersea tunnels which are part of the Boston Harbor Clean-Up Program. The tunnel is 7.7 km (25,160 ft) long, bored to a 4.3 m (14 ft) diameter in the Cambridge A
Jan 1, 1999
-
Comparison Of Methods For Determination Of Booster Fan Locations In Underground MinesBy E. Topuz, Xing Wu
INTRODUCTION The air flow in the mine ventilation network can be categorized in three ways: natural splitting, controlled splitting, and semi-controlled splitting. In natural splitting, the air fl
Jan 1, 1989
-
A New Process for Gold Electrowinning from the Eluate of Loaded CarbonBy Liu Hongkang, M. J. Virnig, Yang Xianwan, Zhu Yun
A new technology for recovery of gold from loaded carbon developed by Kunming Institute of Technology is introduced. The principle, production practice and results are described.
Jan 1, 1993
-
Prelimary Evaluation of a Computer Vision Sensor for Analysis of Phosphate TailingsBy K. C. Kane, D. L. Meredith, B. E. Davis, D. A. Stanley, O&apos
Computer control of the minerals beneficiation process is limited by a lack of adequate sensors to provide information on the current state of the process. Recent reduction in the cost of image acquis
Jan 1, 1990
-
Bradshaw Section 5A Interceptor, Sacramento, CaliforniaBy Patrick Doig, Ross Webb
The Bradshaw Section 5A Interceptor involves the construction of two miles of 108-inch, finished diameter tunnel in dry soils. Excavation is generally by Lovat TBM with ribs and lagging support. The t
Jan 1, 1999
-
Computer-Aided Simulation of the Pressure Oxidation Process for Refractory Gold RecoveryBy V. G. Papangelakis, G. P. Demopoulos
The high temperature (180-200 OC ) pressure oxidation (02 - HzSO4) process for the recovery of gold from refractory concentrates (FeS2/FeA8S) is simulated with the aid of a computer model. The model c
Jan 1, 1990
-
New Flowsheet For The Treatment Of Complex Sulfide Ores Using Synthetic CollectorsBy A. M. Marabini, V. Alesse, Belardi. G.
An alternative flowsheet was designed for the flotation treatment of a complex sulfide ore from the Sotiel Mine in Spain. The ore contains 0.71% Cu, 2.24% Pb and 5.63% Zn. Two specially developed syn
Jan 1, 1996
-
Developing Computational Groundwater Monitoring And Management System For Estonian Oil Shale DepositBy H. Lind
Mining in Estonian oil shale deposit mainly takes place in the Ordovician, Keila-Kukruse aquifer. The aquifer is affected by mining and is fully dried out around the working mine areas (Perens and Sav
Jan 1, 2008
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en
Jan 1, 2004
-
Experiences From Construction of a New Ventilation System for LKABs Kiruna MineBy Lennart Mukka
This paper describes the experiences from construction of a new ventilation system in LKABs Kiruna Mine in Sweden as well as the choice of the method for air flow regulation with concern of life cycle
Jan 1, 1997
-
Application of Object Oriented Programming for Design of Underground Mine Environmental SystemsBy D. C. Panigrahi
The paper presents the application of Object Oriented Programming approach for the development of a network simulation model based on nodal pressure method using linearised flow equations. The converg
Jan 1, 1996
-
Determining Radon Attenuation Of Cover Materials Using Field ExperimentationBy K. E. Robinson, G. Re, L. Skoski
Introduction A new technology is evolving as a result of growing industry and government concerns over the potential impacts of possible airborne emissions from uranium tailings piles. A major comp
Jan 1, 1980
-
Optimization Models For Scheduling Ore And Waste Production In Open Pit MinesBy Sizhe Tan
An open pit mining operation can be considered as a production system with at least two products: ore and overburden (waste). A primary mine planning task is to schedule the production of ore and wast
Jan 1, 1992
-
Resin-in-leach: An Effective Option For Gold Recovery From Carbonaceous OresBy Gregory Owen Lewis, Wendy Bouwer
Various processing strategies have been implemented in an effort to limit the loss of gold, during leaching, to the naturally-occurring carbonaceous 'preg-robbing' constituents present within certain
Jan 1, 2000
-
Changing Potential For The Electrical Beneficiation Of Minerals By Chemical Pre-TreatmentBy H. R. Manouchehri
The responses of calcite, feldspar, and quartz minerals In a laboratory free fall electrostatic separator, before and after tribocharging with stainless steel, PVC, and copper plates, have been invest
Jan 1, 1998
-
Concepts and Applications for Using Strain Gauges to Monitor Ore Pass LevelsBy C. Rutter, S. Nelson
"Climax Molybdenum Company’s Henderson Mine, owned by Freeport McMoRan Inc., is a panel caving molybdenum mine located 69 km west of Denver, Colorado. The mine utilizes long interconnected ore passes
Jan 1, 2018
-
Subsidence Monitoring Plan Of Longwall Panels - A Case Study Kitt Mine No. 1By James E. Kolesar
An essential prerequisite to expanding the application of longwall mining techniques in the United States is the development of a better understanding of the mechanics of rock mass deformation near th
Jan 1, 1982
-
Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks
The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip
Jun 13, 2021
-
A Practical Procedure For Underground Development And Production Scheduling, Using A MicrocomputerBy D. Farahmand
This paper focuses on formulating a practical procedure for forming long-range production and development schedules in underground mining. A computer program developed to be run on a microcomputer is
Jan 1, 1986