Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design and construction outlined of the Cannon mine tailings impoundment

    By Ian Hutchison, Ted Sluder, Jack Caldwell, Don Moore

    Introduction The Cannon mine at Wenatchee, WA has recently been brought into operation to recover gold from the sandstones of the Swauk formation. The mine is a joint venture between Asamera Minerals

    Jan 8, 1986

  • SME
    The Geologic Relationships Of Industrial Mineral Deposits And Asbestos In The Western United States - Preprint 09-061

    By B. S. Van Gosen

    In recent years, U.S. regulatory agencies have placed emphasis on identifying and regulating asbestos dust exposures in the mining environment, with a particular focus upon industrial mineral deposits

    Jan 1, 2009

  • SME
    Studies On Effect Of Cu(Ii) On Growth Of Thiobacillus Ferrooxidans Using Series Piezoelectric Quartz Crystal

    By M. Okido, W. Wei, L. Chai

    The kinetics on the growth of Thiobacillus ferrooxidans was studied by use of series piezoelectric quartz crystal ( SPQC ). Arsenic ioninhibits the growth of Thiobacillus ferrooxidans, which is consis

    Jan 1, 2000

  • SME
    The Green Mining Technique in Chinese Collieries

    By Minggao Qian, Jialin Xu, Wenqi Lai, Weibin Zhu

    This article advances an innovative concept explaining the connotation and technical system of "green" mining. The important theoretical foundations of "green" mining are the distribution and developm

    Jan 1, 2005

  • SME
    Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern Pennsylvania

    By A. Iannacchione

    Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where

    Feb 27, 2013

  • SME
    Urban Tunnelling Experiences on the UK’s Channel Tunnel Rail Link

    By Keith Bowers, Frank Mimnagh, Eddie Woods

    The CTRL London Tunnels The Channel Tunnel Rail Link (CTRL) London Tunnels comprise 36km of internal diameter bores that were driven by Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs).

    Jan 1, 2005

  • SME
    Siemens Controllers Aid Processing at the Madero Project

    By Rolando Gonzalez

    Mexico’s role in the world economic community continues to grow. And it is important that the country makes use of its natural wealth, including its large underground deposits of minerals and metals.

    Jan 1, 2003

  • SME
    Annual Review 2003 - Mining Review

    By P. A. Plunkert, D. E. Morse, L. McCartan, S. F. Sibley

    The average annual growth rate of real gross domes-tic product (GDP) from the third quarter of 2001through the second quarter of 2003 in the United States was about 2.6 percent. GDP growth rates in th

    Jan 1, 2004

  • SME
    Looking Back at the Metal Mines of Cornwall

    By Thomas A. Simpson

    Traveling through the moors and valleys of Cornwall, England, one is reminded of the extensive mining activities of the past. Abandoned shafts, remains of granite block wheel houses and engine houses,

    Jan 9, 1981

  • SME
    Gold Mineralization In The Coffee Creek Area; White Gold District (Dawson Range), West-Central Yukon ? Introduction

    By A. J. Wainwright

    The Coffee Creek lode gold discoveries are located in the White Gold district (Dawson Range), west-central Yukon, 130 km south of Dawson City and 30 km south of the Golden Saddle gold deposit (Figure

    Jan 1, 2012

  • SME
    Hydraulic Lifters Aid in Dragline Maintenance

    Draglines are one of the largest land-based equipment moving across the earth. They typically ranging in size from2.5 to 6.5 kt (2,750 to 7,100 st). Their size, though, makes them difficult to mainta

    Jan 1, 2004

  • SME
    Liebherr Celebrates 50th Anniversary, Introduces 300-ton Mining Truck

    By William R. Yernberg

    In October 1999, Liebherr-America, Liebherr Construction and Liebherr Mining Equipment held anopen house at its Newport News, VA, plant. The open house was held to celebrate the company’s50th anni

    Jan 1, 2000

  • SME
    Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer Simulation

    By J. A. Delgadillo

    Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c

    Jan 1, 2008

  • SME
    Technology News - More P&H Shovels Operate in Canadian Oil Sands

    P&H MinePro Services Canada is supplying Syncrude Canada three more of its model4100BOSS electric mining shovels. The shovels will be delivered during 2003. Syncrude’s oil sands operations already u

    Jan 1, 2003

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME
    Industrial Minerals 2002

    Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committees

    Jan 1, 2003

  • SME
    Tunneling Through Cobbles in Sacramento, California

    By Joel Nonnweiler, Rafael Castro, Ross Webb

    The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n

    Jan 1, 2001

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w