Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021

    By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry

    Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel

    Jun 13, 2021

  • SME
    Recent Improvements In The MFIRE Mine Ventilation And Fire Simulator

    By L. W. Laage

    MFIRE is a mine ventilation and fire interaction computer simulation program. It allows transient state ventilation simulation and features mass based flow rates, natural ventilation, air recirculatio

    Jan 1, 1993

  • SME
    Controlled Frequency -The Brushless Electric Steam Engine

    By R. A. Matuszak

    Throughout the history of power excavating machines, engineers have continuously tried to shape the main drive speed-torque characteristics to provide an optimum performance from each main motion. Sel

    Jan 1, 1977

  • SME
    Role Of Fine Coal Classification Efficiency On Coal Preparation Plant Performance (b060385e-4c36-4104-94d7-6f662e3f61e3)

    By B. A. Firth

    The presence of misplaced ultra-fine particles has been shown to decrease the separation efficiency of unit operations used in coal preparation. Although the classification of fine coal was considered

    Jan 1, 1996

  • SME
    A New High-Performance Approach to Block Model Governance and Data Democratization

    By Cesar Carrasco, Heath Arvidson, Mark Forster

    Block models built to represent the geology and rock characteristics of mineral deposits represent huge complex data sets, which form the basis of strategic and business planning, and public reporting

    Jun 25, 2023

  • SME
    Crushing & Grinding - Autogenous Mill Curved Pulp Dischargers - Experience At Pickands Mather Operations, Primary Milling Iron Ore

    By A. M. McKim

    6, 7.3 meter diameter autogenous mills at Wabush Mines are undergoing conversion from a radial configuration of pulp discharger to a curved design. Improved discharging efficiency has effectively lowe

    Jan 1, 1982

  • SME
    Comparing the implementation of two dust control technologies from a sociotechnical systems perspective

    By Andrew B. Cecala, Emily J. Haas, Jay F. Colinet

    Researchers from the U.S. National Institute for Occupational Health and Safety (NIOSH) studied the impact of an unregulated dust control technology (the Helmet-CAM) and a regulated dust control techn

  • SME
    Extrusion Agglomeration Of Fine Coal

    By G. E. Wasson

    Consolidation Coal Co. tested the agglomeration of fine coal using a laboratory pellet mill. The principal operating variables examined were feed coal moisture, coal size distribution, and additives t

    Jan 1, 1991

  • SME
    Techno-Economic Assessment Of Tailings Retreatment

    By D. Malhotra

    Metallurgists are continuously striving to improve recovery. But optimization of profits and/or revenue dictates that recovery can be sacrificed at the expense of throughput. However, recently there h

    Jan 1, 1994

  • SME
    Polyelectrolytic Bridge Flocculation Application To Dewatering And Processing Of Clay Slurries

    By S. E. Valji

    Clay slurries are normally dewatered using flocculents like sulfuric acid or aluminum sulfate. This type of flocculation is based on the electrolytic mechanism. For certain clay dewatering application

    Jan 1, 1965

  • SME
    Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023

    By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere

    Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho

    Jun 13, 2023

  • SME
    Improvement Of Longwall Bit Design (2515ab35-820d-4a22-94cf-dcc1d9c5ed44)

    By Yi Luo

    In a shearer longwall mining operation, the longwall bits are responsible for breaking into and chip-ping the broken coal blocks away from the coal face. However, underground observations have found t

    Jan 1, 1996

  • SME
    Modern Methods Of Geomonitoring In Post-mining Processes - SME Annual Meeting 2022

    By T. Rudolph, M. Pawlik, J. Benndorf, X. Yin, J. F. Brune, P. Goerke-Mallet

    The long and often undefined period in the post-mining phase challenges geo-monitoring with its various responsibilities, like the detection of environmental changes, ground movements and water manage

    Mar 2, 2022

  • SME
    Evaluation Of Shield Support Performance By Numerical Analysis

    By S. S. Peng

    Since the introduction of shield supports in 1975, safety and production in U.S. longwall faces have improved considerably. Many faces had a daily production of up to 8,000-10,000 tons and productivit

    Jan 1, 1988

  • SME
    Mine Ventilation Pathway Simulation on a Hypothetical Shale Gas Well Breach Utilizing the Longwall Instrumented Aerodynamic Model (LIAM) - SME Annual Meeting 2024

    By Steven J. Schatzel, Mark M. Mazzella, Robert A. Kimutis, VASU GANGRADE, James D. Addis, Marcia L. Harris, Mayley Guitard

    Researchers from the National Institute for Occupational Safety and Health (NIOSH) evaluated the impact of potential shale gas well breaches and subsequent gas inflow on selected mine ventilation syst

    Feb 1, 2024

  • SME
    An Analysis Of Present Day Inadequacies And Needed Improvements In The Technology Of Cut And Cover Construction

    By Joseph D. D?Annunzio

    The report on cut and cover construction as assembled by the Organization for Economic Co-operation and Development covered 17 different countries based on a total of just under 400 individual replies

    Jan 1, 1970

  • SME
    The Breakage Function In Coal Bore Core Particle Size Reduction

    By T. E. Wilson

    In conjunction with experiments to improve the particle size preparation of coal bore cores prior to washability testing, discrete-event breakage of coal, shale and homogeneous low-strength concrete c

    Jan 1, 1998

  • SME
    Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022

    By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin

    Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t

    Dec 1, 2022

  • SME
    New Approach To Protect Operators Of Thin-Seam Shuttle Cars

    By A. G. Mayton

    Bureau of Mines research has addressed improved operator protection for thin-seam shuttle cars. Because of working height restrictions in thin-seam mines (1.22 m or 48 in), MSHA regulations require th

    Jan 1, 1989

  • SME
    Efficiency Sizing Of A Vibrating Screen

    By V. K. Karra

    An improvement in the present day screen sizing methods calls for knowledge on i) how material in the size range: 0.5 x 1.5 times the through-fall opening of the mesh on a deck, splits between the ove

    Jan 1, 1979