Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Application Of Ported Kiln Technology To The Grate-Kiln Process At Minntac.

    By S. Vogely, J. Trescot, D. Connor, F. Beloy

    In 2001, the Minntac Division of US-Steel retrofitted one of their Grate-Kiln Iron Ore Pelletizng lines with a Ported-Kiln Air Injection System (PKAIS) the first of it’s kind in the world for oxide pe

    Jan 1, 2004

  • SME
    Geology Of The Black Fox Mine Matheson, Ontario, Canada

    By E. J. Berentsen, R. F. Nanna, D. Dell’ Elce, R. Lougheed

    Apollo Gold’s Black Fox project is located 10 km (6.2 miles) east of Matheson, Ontario, Canada, on Hwy 101 East It is located within the prolific Destor Porcupine Fault Zone, which is also the host fo

    Jan 1, 2004

  • SME
    Typical Large Sulfide Flotation Mills

    By J. B. Knapp, J. W. G. Betts, Scott L. Burreill, J. H. Bassarear, E. A. Lowe, W. J. N. Davis, John L. Bolles, Gaylord P. Dopson, William H. Keener, N. S. L. Steenkamp

    This chapter contains moderately detailed descriptions of some typical and well known mills that treat predominantly sulfide copper ores, some containing secondary values in gold, silver, and molybden

    Jan 1, 1985

  • SME
    Going Hard at Soft Ground in Buenos Aires

    By Stephen P. E. Redmond

    A 15 km water supply tunnel is being constructed in Buenos Aires, Argentinata expand the capacity of the existing system. Two 4.3 meter diameter Earth Pressure Balance (EPB) tunneling machines operati

    Jan 1, 1999

  • SME
    Numerical Prediction Of Subsidence With Coupled Geomechanical-Hydrological Modeling

    By S. P. Girrens

    A coupled finite element geomechanical- hydrology code is currently under development for application to the problem of predicting groundwater disturbances associated with mine subsidence. The structu

    Jan 1, 1982

  • SME
    Multiple Level Room And Pillar Mining In Limestone

    By R. W. Brann, R. C. Freas

    Franklin Industrial Minerals operates several mines/quarries, including two room and pillar underground mines. Both of these mines are operated as multiple level room and pillar including heading and

    Jan 1, 2003

  • SME
    The Planning, Design and Construction of the Tuas Cable Tunnel and Future Power Transmission Cable Tunnels in Singapore

    By G. D. Mainwaring, Weng L. W, Lam Y. K.

    The first power transmission cable tunnel in Singapore was the 2.6km long undersea tunnel between Pulau Seraya and mainland Singapore, constructed in the1980s. Ten years later, similar concepts were u

    Jan 1, 2001

  • SME
    Wolf Creek Upper Narrows Project–South Fork, Colorado, Construction of a Large Cross-Section Drill and Blast Highway Tunnel in Alpine Conditions with Multiple Staggered Headings

    By Lyman File

    This paper discusses the overall challenges to construct a two-lane highway tunnel located in southwestern Colorado on U.S. Highway 160 for the Colorado Department of Transportation by the Kiewit West

    Jan 1, 2003

  • SME
    Industrial Minerals 2005 - Barite

    By P. Mills

    More than 95 percent of all the barite mined and produced is used in the petroleum industry as “drillers mud.” The remaining barite is used in the industrial and medical markets. Therefore, the amou

    Jan 1, 2006

  • SME
    Myths In Grinding Mill Q.A. — Uncovering The Costs

    By V. Svalbonas

    The process of grinding mill quality assurance brings with it associated truths and myths. When the mill quality assurance process took its first great steps forward in the late 1970s and early 1980s

    Jan 1, 1999

  • SME
    Raw Water Tunnel Condition Assessment

    By Rafael C. Castro

    As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In

    Jan 1, 2008

  • SME
    Coal Quality And Resources In The Us Gulf Coastal Plain

    By J. C. Willett, J. R. Sanfilipo, P. D. Warwick

    The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen

    Jan 1, 2001

  • SME
    New Mines, Attitudes and Opportunities Theme of Colorado MPD Meeting

    By Steve Kral

    The upswing in prices for base and precious metals, industrial minerals and coal has allowed the global mining industry to ramp up production at existing mines and begin construction of proposed proje

    Jan 1, 2005

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008

  • SME
    Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota

    By J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington

    EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal

    Jan 1, 2004

  • SME
    Modeling The Influence Of Slurry Temperature On Gold Leach And Adsorption Kinetics At The Fort Knox Mine, Fairbanks, Alaska

    By Eric M. Hill, Daniel E. Walsh, Hsing K. Lin, John T. Hollow

    The Fort Knox Mine is located in Alaska’s interior where the average ambient air temperatures range from -24°C in January to 16°C in July. The mill processes a free milling gold ore utilizing both a

    Jan 1, 2005

  • SME
    Development Of Experimental Procedures To Analyze Copper Agglomerate Stability

    By K. A. Lewandowski

    The efficiency of heap leaching is reduced by poor solution flow characteristics (i.e., channeling and ponding) that result from fines migration. Agglomeration of the ore can immobilize fines, but for

    Jan 1, 2008

  • SME
    San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History

    By Michael Jatczak

    The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin

  • SME
    Repairs and Modifications to the Providence Water 2.3 m ID Scituate Aqueduct and Tunnel

    By David Belknap, Clay Haynes, David Egger

    Rehabilitation challenges were met nearly two months ahead of contract schedule for the Design-Build, Fast Track Scituate Aqueduct & Tunnel project in Cranston, Rhode Island. The aqueduct and tunnel w

    Jan 1, 2005