Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cycling with CementBy Roy A. Grancher
CYCLING WITH CEMENT "THE WHEEL IS COME FULL CIRCLE" Shakespeare's King Lear Act V, Scene 3, Line 176 The time clock of the cement industry has been turned back to the early 1950s. After t
Jan 1, 1972
-
High-Sulfidation Submarine Hydrothermal Systems Of The Mariana ArcBy Robert G. Ditchburn
The Mariana arc is an ~1,400-km-long intraoceanic arc that marks the southern extension of the Izu-Bonin arc, and is host to 62 ?volcanic centers? of which at least 27 (21 submarine) are hydrothermall
Jan 1, 2008
-
Studying intake airway pressurization by ventilation modeling and leakage evaluation - SME Transactions 2010By R. H. Grau, C. D. Taylor, A. L. Martikainen
Utilization of belt air in underground coal mines has been discussed extensively during the last decade. The Final Report of the Technical Study Panel on the Utilization of Belt Air and the Compositio
Jan 1, 2010
-
Upward Surface Movement Above Deep Coal Mines After Closure and Flooding: Analytical Modeling ResultsBy André Vervoort
At the 2017 ICGCM-conference in Morgantown, WV, a case study was presented with measurements of the upward surface movements or uplift after the closure of two neighboring coal mines (Winterslag and Z
-
The Construction Materials DilemmaBy Roy A. Grancher
Construction materials indeed face a dilemma...as does the building industry as a whole. A stop & go economy; a severe drop; in housing starts; lingering indecision over just what corrective steps are
Jan 1, 1975
-
Value Driven Cost Management: A Key to Continuos Improvement of MiningBy M. A. Vergara, J. A. Botín
"The decline of the “super cycle” has placed an end to a decade of production-focused strategies, with operating cost growing at rates higher than production. Today, the sector is placed on a tough ri
Jan 1, 2016
-
Cleaner Holes--Lower Drilling CostBy Euclid P. Worden
In 1977, an article in World Mining (1) reported a total of 2726 rotary blast hole drills in service. This figure included only those machines produced by three of the manufacturers building drills of
Jan 1, 1979
-
Potash Refining In SaskatchewanBy William H. Eatock
The Saskatchewan ore zone strikes slightly south of East, from the Alberta border to Manitoba; and dips to the South. The conventional mines are located along a broad strike line from Saskatoon to Est
Jan 1, 1980
-
Use Of Conditional Simulation In Underground Coal Mine PlanningBy Harvey P. Knudsen
Case studies are presented in this paper to illustrate the usefulness and applicability of using conditional simulation in under- ground coal mine planning. Conditional simulation is a technique devel
Jan 1, 1980
-
Analysis Of Mine Geology And Improvement Of Longwall Performance Using Continuous Shield Monitoring With LoSCoMSLarge variations of coal seam thickness and roof conditions are associated with the occurrence of mine floor undulation at Shoal Creek Mine, operated by Drummond Company, Inc.. Ground control problems
Jan 1, 1998
-
Design Considerations For The Henderson Project Tailing And Mill Process Water System ? IntroductionBy William W. Shriver
When the Henderson Project is completed in 1975, it will become one of the Free World's largest primary molybdenum producers. The Henderson Mine will be located approximately 50 miles west of Den
Jan 1, 1970
-
Refractory Clay Mining And Land Reclamation ? IntroductionBy Charles F. Stack
The A. P. Green Refractories Co. operates clay mines in ten states. Eight of these states have reclamation laws with which we have to comply and indications are that the U. S. Congress will pass a fed
Jan 1, 1974
-
Benefits Associated With Two-Stage Spiral Cleaning At McClure River Preparation PlantBy S. Horton, F. L. Stanley, P. J. Bethell
Introduction The McClure River Processing Plant is located at McClure in Dickenson County, VA. The plant was originally constructed in 1979 as a 600 st per hour facility. The plant is fed by coals
Jan 1, 1992
-
Effect Of The Structure Of Carbon Adsorbents On The Adsorption Of Gold CanideBy A. S. Ibrado
Research investigations on the chemistry of the adsorption of gold cyanide on activated carbon have mostly reduced the role of activated carbon as the provider of the large surface area needed for ads
Jan 1, 1992
-
Analysis and Characterization of Anti-Caking Additives used in Rock DustBy M. L. Harris, I. Zlochower, M. J. Sapko, I. E. Perera
Experiments conducted with limestone dusts and dolomitic marble dusts have indicated that when rock dust is wetted and subsequently dried, it becomes a solid, non-dispersible cake. However, in order t
Jan 1, 2019
-
A Comparison Of High Pressure Roller Mill And Conventional GrindingBy T. Knuutinen, M. Klemetti, P. Mörsky
This paper presents a comparison study done at VTT's new pilot plant facilities in Outokumpu, Finland, for chromite ore. The ore was ground in a rod mill -, a ball mill - and high pressure roller
Jan 1, 1995
-
High Speed Communications In Harsh EnvironmentsExtending an organization?s knowledge base throughout the entire enterprise can improve operations. Until recently, though, field operations were often left out of the information loop, as extending
Jan 1, 2009
-
Efficiency Improvement Process for Aggregate and Industrial Mineral Processing PlantsBy M. Rotz
In the minerals industry today, the ?low hanging fruit? that once existed to debottleneck production and improve recovery, while meeting market needs for quality in mineral processing operations, are
Feb 23, 2014
-
Bioleaching of Arsenic From Mine Tailings by Acidithiobacillus Thiooxidans: A Comparative StudyBy E. Lee
The behavior of As bioleaching using Acidithiobacillus thiooxidans (A. thiooxidans) in mine tailings containing highly concentrated As contents (i.e., As=33877 mg/kg) was systematically evaluated acco
Feb 23, 2014
-
Evaluation Of Underground Coarse - Coal Slurry Transportation Systems By A Simulation Model (d935be45-f8d1-4dc5-9b83-e154b4daad3f)By H. Sevim
In this paper, the research effort in simulating the operation of underground coarse-coal hydrotransport systems (UCCHS) is summarized. The equipment of the system to be simulated is already optimally
Jan 1, 1985