Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Technical Papers - Evaluation Of The Wet Head Continuous Miner To Reduce Respirable DustThe National Institute for Occupational Safety and Health (NIOSH) conducted field tests to evaluate the effectiveness of a wet head continuous mining machine for reducing dust exposure for continuous
Jan 1, 2010
-
Literature Research As An Exploration ToolBy Richard J. Lundin
Literature research is an inexpensive, yet effective tool for the direct discovery of ore deposits. Case studies abundantly demonstrate that properties with viable mineralization and *proven reserves
Jan 1, 1977
-
Development of a Six Drillhead Roof Bolting MachineBy B. Kyslinger
"In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Foresight Energy, J. H. Fletcher & Company was tasked to design
Jan 1, 2017
-
Process Design For Control Of Sludge Production From Wet Phosphoric Acid Processing ? I. IntroductionBy Paul L. Bearden
The accumulation, handling, and utilization of sludges formed from wet process phosphoric acid is one of the major problems in the industry. The purpose of this paper is to explain some of the cons
Jan 1, 1966
-
EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow ConditionsBy Matthew Geary, Stephen J. Marino, Jordan A. Schreiner
"INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo
Jan 1, 2016
-
Radioisotope Probe For On-Stream Analysis Of Mineral Process StreamsBy Adrian Molinari
A radioisotope probe (Minexan 202) capable of simultaneously analyzing a mineral slurry for five elements and pulp density has been developed by Outokumpu Oy, Finland. The probe is designed to operate
Jan 1, 1977
-
Applying Traceability In A Mine-To-Mill Context By Using Particle Texture AnalysisBy P. Oghazi
It is possible to have traceability in the mining industry, by parameters and signatures like particle mineralogy, mineral association, texture and mineral liberation. The study is on an apatite-iron
Jan 1, 2010
-
A machine learning modelling outline for short-term seismic hazard assessment - RASIM 2022By Patrick Linzer, Lindsay Linzer
By its nature, seismology has been a data intensive field since the first digital computers were introduced in the 1950s. The first empirical models were developed in the same period and are still wid
Apr 26, 2022
-
Advanced Physical Coal Cleaning As A Clean Air Act Compliance Technology (AIME)By III Feeley
The U.S. Department of Energy is supporting the engineering development of three advanced physical coal cleaning technologies--selective agglomeration, advanced flotation, and advanced cycloning--capa
Jan 1, 1993
-
Determination Of Transition Depth Between Slope And Box-Cut Access For Near-Surface Coal Reserves (PRIPRINT 98-181)By B. K. Slone
The depth at which it becomes more economical to use slope access as opposed to box-cut access for near-surface coal reserves, termed "transition depth," can be established for a given coal property b
Jan 1, 1998
-
Hybrid Shoring Design for the Courthouse Commons Tunnel in San Diego, California: Controlling and Predicting Ground Movements - NAT2022By Maryam Motamed, Jeremy Stone, Leigh Anne Zhang
Controlling and predicting ground movements are essential to the design of shoring systems. The Courthouse Commons tunnel in San Diego, California, included a 56-foot-deep temporary shaft as a launchi
Dec 1, 2022
-
Benefits and Challenges of Progressive Design-Build Procurement— Atlanta Plane Train Project - NAT2022By John Murray, Daniel Ebin, Robert Gould
The Atlanta Plane Train project at Hartsfield-Jackson Atlanta International Airport employed the progressive design-build approach. This provided opportunities for collaboration between the design-bui
Dec 1, 2022
-
Efficient Use Of Additives To Improve Pneumatically Emplaced Backfill Strength (PRIPRINT 87-32)By M. J. Carlson
With the goal of improving the strength characteristics of pneumatically emplaced material used for localized subsidence control, the binding additives: fly ash, bentonite, and Portland Cement, were e
Jan 1, 1987
-
Common Ventilation Problems In The Appalachian Coal Region -A Case Study (PREPRINT NUMBER 92-181)By A. M. Wala
It is common practice in Appalachia, when extending the life of an existing mine, to acquire the adjacent reserves and extend the existing mine into it. Also, often the existing mine is renovated to a
Jan 1, 1992
-
Updating the GBR Gold Book - NAT2022By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022
-
Ground Freezing for Construction at the Port of Miami TunnelBy Roger Storry, Arnaud Hochart, David Harris, Olivier Martin
"INTRODUCTIONThe Port of Miami Tunnel (POMT), designed and constructed by Bouygues Civil Works Florida between 2009 and 2014, was a Public Private Partnership between the Miami Access Tunnel Concessio
Jan 1, 2016
-
Effects of Tunnel Excavation on Historical Buildings by a Fully Coupled Soil-Structure Interaction 3D Analysis - A Case Study From Copenhagen “Cityringen” Metro LineBy Luisa Alfieri, Giorgio Fantauzzi, Sergio Notarianni, Spencer Cavagnet, Alessandro Damiani
"The new tunnels of the Copenhagen ""Cityringen"" will be excavated, at Kongens Nytorv square, crossing over the existing M1 and M2 metro lines. After the crossing, the tunnels will underpass the hist
Jan 1, 2016
-
Hecla's Seismic Detection SystemBy John T. Langstaff
Rock bursts in the deep metal mines of the Coeur d’Alene district present an ever increasing problem in the safe and economic mining of the district’s silver, lead and zinc ores. Hecla Mining Compa
Jan 1, 1977
-
SAMARCO's 396 Km Pipeline A Major Step In Iron Ore TransportationBy Milton E. Jennings
On May 11, 1977, the SAMARCO 20-inch, 396-kilometer (246-mile) Pipeline was placed in service. This system represents the latest thinking in slurry pipeline design and is one of the main contributors
Jan 1, 1978
-
Coal: Tomorrow's ChoiceBy Robert V. Price
It is a pleasure to be here today to discuss coal's prospects with the Society of Mining Engineers of AIMS--- a group destined to play a crucial role in shaping our national energy future. Much
Jan 1, 1975