Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blasting Mechanics ? IntroductionBy L. Donovan Clark
The term "powder factor" is almost universally accepted as the measure of the efficiency of a blasting program. It represents the economics of blasting since it designates quantity of explosive (there
Jan 1, 1970
-
Field Evaluation of an Inline Wet Scrubber for Reducing Float Coal Dust on a Continuous Miner SectionBy J. R. Patts, L. D. Patts, S. J. Janisko, T. Barone
"Controlling float coal dust in underground coal mines before dispersal into the general airstream can reduce the risk of mine explosions while potentially achieving a more efficient and effective use
Jan 1, 2015
-
Analysis And Modeling Of Longwall Face-To-Face TransfersBy C. Patrick
Longwall face-to-face transfers can cost over $100 per minute in lost production potential and $100,000 for personnel and supplies. Such high cost makes extensive planning and control of the transfer
Jan 1, 1993
-
Mine Planning At Newmont GoldBy S. P. Winkelmann
The expansion in gold production in the Carlin 'Trend over the last few years has been one of staggering proportion. To increase gold production while minimizing capital requirements and providin
Jan 1, 1990
-
Fan Requirements in the Second 100 Years of a Mine LifeBy A. Haghighat
The Missouri University of Science and Technology?s (Missouri S&T) Experimental Mine is a teaching and research facility which has been excavated in limestone by mining engineering students over almos
Feb 23, 2014
-
Imminent Danger: Characterizing Uncertainty in Critically Hazardous Mining SituationsBy B. M. Eiter, J. Hrica, D. R. Willmer
"Mineworkers are routinely tasked with making critically important decisions about whether or not a hazard presents an imminent danger. Researchers from the U.S. National Institute for Occupational Sa
Jan 9, 2018
-
A New Method For Designing Support Area To Protect Surface Structures Over Underground Coal Mining AreasBy S. S. Peng
A well designed mining plan is one which minimizes the cost and the mining induced problems and maximizes the recovery of the coal reserve. In order to minimize the negative effects on surface structu
Jan 1, 1993
-
Continuous Haulage Systems For Computer-Assisted Continuous Miner PREPRINT NUMBER 90-152By S. K. Bhatt
This paper reviews major developments in continuous haulage technology for underground coal mines. Haulage systems, both in use and development, are investigated through a comprehensive literature sea
Jan 1, 1990
-
Mine Ventilation Aspects Of The Expansion Of Rio Algom's Uranium Mining Operations In Elliot LakeBy A. R. Bell
Rio Algom Limited are currently undergoing a major expansion of their mining operations in the Elliot Lake area. To date this has involved the increase of output at the Quirke Mine from 4080 to 6350 t
Jan 1, 1980
-
Plant Control By A Process Computer At Quebec Cartier's Mount Wright Property ? IntroductionBy G. Bourque
Early in the design stage of their new concentrator for the Mount Wright Plant, Quebec Cartier Mining decided to use a process computer for total control of crushing, grinding and concentrating. A map
Jan 1, 1979
-
Mining And Ore Control Procedures At Gold Fields' Ortiz MineBy David M. Rubio
The Ortiz Mine is an open pit-heap leach gold operation in central New Mexico processing about 3,100 tonnes (3,400 short tons) per day. It is the initial mining property in the United States developed
Jan 1, 1984
-
Advancements in Frother Optimization for Enhanced PGM and Sulphide Ore Recovery - SME Annual Meeting 2025By Shani Engelbrecht, Belinda McFadzean, Avuyile Wali, Natalie Shackleton, Vratislav Malysiak
Frothers play a crucial role in sulphide and PGM ore flotation recovery, and AECI Mining Chemicals studies on PGM ores have shown significant flotation kinetic increases with the optimal frother-colle
Feb 1, 2025
-
Geoistical Evaluation of Polymetallic Veins - SME Annual Meeting 2024By M. Portal, L. Goicochea
This study is carried out in the Zenit mining concession, which is located in the city of San Pablo in the department of Cajamarca in Peru. The Project has 33 mineralized structures and according to l
Feb 1, 2024
-
Optimization of Engineering Design Parameters of Injection Foams for Strengthening Purposes - SME Annual Meeting 2025By Ataç Başçetin, Hasan Çelt, Hüseyin Onur Dönmez, Kürşat Hasözdemir
Phenolic foams, known for fire resistance, show broader industrial potential, particularly in mining, through property enhancements. Adjustments to the formaldehyde-to-phenol (F/P) ratio, bio-based ad
Feb 1, 2025
-
Tunneling Through Reef Structures: Identification, Characterization, and Potential Impacts - NAT2024By Jon Ike Isaacson, Michael Miller, Jarek Trela
Despite reef structures being relatively common in carbonate rocks around the world, tunneling experience in reefs is extremely rare. Impacts and risks associated with reef tunneling through these geo
Jun 23, 2024
-
Experimental Investigation of Time‑Dependent Deformation in Brittle Marcellus Shale - Mining, Metallurgy & Exploration (2021)By Neel Gupta, Brijes Mishra
Coal mining activity disturbs the natural equilibrium of in situ stress state such that the induced stresses deform the surrounding rock mass. Although the installation of roof supports typically prev
Jul 27, 2021
-
In Situ Assessment of the Effectiveness of an Undisturbed Single Driving Entry’s Relief Borehole in Coal Burst‑prone Seam - Mining, Metallurgy & Exploration (2021)By Qingwen Shi, Gang Xu, Shuwen Wang, Brijes Mishra
Pressure relief borehole is one of the most effective methods to treat coal burst in deep-buried coal seams. However, due to the large amount of randomly distributed fractures in the coal body and the
Oct 19, 2021
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani
The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P
Jun 13, 2023
-
Coal Beneficiation via the Tapered Fluidized Bed Using Magnetite with a Wide Size Range Mining, Metallurgy and ExplorationBy Xuchen Fan, Chenyang Zhou, Yuemin Zhao, Liang Dong, Chenlong Duan
A gas–solid fluidized bed using magnetite particles is an effective methodology for coal beneficiation in the field of dry coal cleaning. Broadening the size range of magnetite used in the bed decreas