Ilmenite Direct Reduction Project In Norway Using The Grate-Car ProcessBy G. Folmo
Allis Mineral Systems' GRATE-CAR agglomeration/induration/reduction process is currently being operated to process ilmenite at Tinfos Titan & Iron KS in Tyssedal, Norway. In this process, balled
Jan 1, 1992
-
Analysis and Design of Faceroad Roof Support (ADFRS)By Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a longwall installation roadway (faceroad) design methodology that could be utilized
-
Field Comparison of Roof Bolter Dry and Wet Collection Systems for Dust ControlBy D. Blackwell, W. R. Reed, G. Ross, S. Peters, M. Shahan
Dust collectors for roof bolting machines generally use a dry box to collect the roof bolting material. Recently, an underground mining operation converted a dry box dust collector to a wet box dust c
Jan 1, 2019
-
Geology And Isotope Geochemistry Of The Lime Creek MoS2 Orebody, Alice Arm, British Columbia ? IntroductionBy David L. Giles
The Lime Creek* ore body in northwestern British Columbia is one of the few commercial primary stockwork-type molybdenite deposits in North America. Others include the Climax, Urad-Henderson, Questa,
Jan 1, 1975
-
Variable Speed Drives For Semiautogenous Mills (cde19d26-f38d-4e52-95a2-cfbef9b9a1b7)By John H. Bassarear
Large scale equipment can reduce both capital and operating costs for concentrators. Large semiautogenous mills can be effectively utilized in big mills but they must be kept fully loaded to take adva
Jan 1, 1985
-
Further Studies On Relating The Breakage Properties Of Coal Bore Cores To Preparation Plant Feed (782c3ebc-fc62-4978-be90-da405354173d)By T. E. Wilson
An exploration bore core sample of coal ought to be reduced from its original cylindrical form to a particle size distribution and particle composition that reflects, insofar as possible, a process st
Jan 1, 1998
-
The Construction of the Manhattan Water Tunnel, New York City ? IntroductionBy Edward (Ted) Dowey
City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres
Jan 1, 2008
-
Handling Of Total Ore In A CCD Thickener CircuitBy O. J. Malacarne
The use of a series of thickeners for-washing of the slime fraction of a leached ore is not uncommon in the uranium industry; however, few ore processing mills have used a thickener circuit for washin
Jan 1, 1962
-
Crushing And Grinding Practice In Sweden (PRIPRINT 68 - B - 329)By B. Fagerberg
Crushing and grinding practice in Sweden follows largely the international pattern. Certain special circumstances, however, have had an influence on the development. Most mines are worked underground
Jan 1, 1968
-
Stability design and evaluation for mine entry system based on reliability theoryBy S. S. Peng, V. Z. Sun
One of the major concerns of ground control in a coal mine is the prevention of roof, pillar and floor failures of the mine entry. To better design and evaluate the stability of a mine entry within a
Jan 1, 1999
-
Borehole Logging For Coal EvaluationBy James K. Hallenburg
Geophysical borehole logging is a valuable and inexpensive tool for coal deposit evaluation, development, and production. In addition to the usual determinations of depth and seam thickness, geophysic
Jan 1, 1984
-
The Use Of Computers At Newmont's Corporate OfficeBy J. R. Parry
Over the past several years, computerized financial models have been an important part of Newmont's strategic planning process. Two applications will be discussed in this paper: a general purpose
Jan 1, 1989
-
Corrosion Strategies at the Resolution Copper Project, Arizona - SME Annual Meeting 2024By Gabino Preciado, Louis Sandbak
Corrosion has long been identified as a potential risk to the long-term ground support stability due to degradation of internal ground support elements such as rock bolts but also to surface support f
Feb 1, 2024
-
2-D FEM parametric numerical analysis of inclined coal pillarsBy Kostas Kaklis, Zach Agioutantis, Robin Flattery
Pillars are used as the primary support structures for underground mining to maintain stability by supporting the over laying strata. In the case of horizontal seams, the pillars are typically subject
-
Microwave Processing of Low-Grade Banded Iron Ore with Different Reductants "Mining, Metallurgy & Exploration (2021)"By Nikhil Dhawan, Shrey Agrawal, SHAILA MIR
The current study investigates the effect of microwave processing on low-grade banded iron ore using charcoal, coking coal, and non-coking coal. Charcoal showed better microwave heating response at lo
Sep 21, 2020
-
Copper Electrolite Solution FiltrationBy Judson G. Brown
In the May, 1969 issue of Mining Engineering the Editorial Director, John V. Beall, described the Japanese Onahama Copper Smelter and Refinery as follows: "On the shore of the Pacific, 120 miles nor
Jan 1, 1970
-
Metal Recovery From Acid-Leach Processing Of Arsenic-Containing Copper WastesBy D. K. Steele
The U.S. Bureau of Mines has investigated the recovery of metals from copper industry wastes by sulfuric acid leaching in a semi-continuous, bench-scale system to solubilize arsenic, copper, and molyb
Jan 1, 1991
-
Water Spray Systems For Reducing The Quartz Dust Exposure Of The Continuous Miner OperatorBy Robert A. Jankowski, Charles A. Babbitt, Natesa I. Jayaraman
The U. S. Bureau of Mines, through a contract research program with Foster-Miller, Inc., has identified guidelines for the selection of the most effective water spray system and water flow rates for u
Jan 1, 1987
-
Simulation of operating risk in mine feasibility studies - SME Transactions 2011By S. Kenzap, V. Kazakidis
Risk assessment is an essential component of mine feasibility studies. However, it is often challenging to identify the appropriate analysis and derive the required input data. The uniqueness of a min
Jan 1, 2011
-
Low-Speed Gearless Converter Drive - Experience Gained With A 6800 Hp Drive Of A 160 T/H Cement Mill Over An Operating Period Of One Year ? IntroductionBy R. Zins
During the past few years, a completely new concept has been applied to the design of drives for operating at very low speeds. In this, the motor is supplied by a variable-frequency thyristor cyclo-co
Jan 1, 1973