Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hydrologic evaluation of post-closure flooding and dewatering of the Homestake MineBy Guosheng Zhan
The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under
Jan 4, 2010
-
Mine Acid Control ? IntroductionBy S. A. Braley
Water is our most important natural resource, for without it there is no life. It is also the principal natural resource for all manufacturing processes, in particular for the development of power. Fo
Jan 1, 1959
-
A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho
Jan 1, 2009
-
Enhanced Mobility Of Arsenic In Mine-Impacted Systems As A Result Of Anthropogenic EutrophicationBy A. Martin
Detailed porewater profiles of arsenic and other interstitial metabolites were used to assess the relationship between trophic status, sediment redox chemistry and arsenic mobility in a historic taili
Jan 1, 2002
-
Geochemical Profiling Of A Sulfide Leaching Operation: A Case StudyBy S. M. Flaherty, R. E. Scheffel, A. Guzman
Geochemical conditions within a leaching operation are heterogeneous. This variability arises mainly from hydrological controls imparted by physical characteristics of the ore and by heterogeneous me
Jan 1, 2006
-
Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan OperationsBy A. Koski
A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U
Jan 1, 2007
-
Observations on the 2005 PDAC ConventionBy Bruce Geller
The 2005 Prospectors and Developers Association of Canada (PDAC) convention continued the upbeat mood found in 2004. The global mining industry is booming due to higher commodity prices in nearly eve
Jan 1, 2005
-
Technologies For The Regeneration Of Cyanide From ThiocyanateBy D. Dimitriadis, T. Polglase, W. Phillips, R. Jenny, M. Botz
Cyanidation processes for the extraction of gold or silver frequently involve the processing of sulfur-containing solids which react with cyanide to form thiocyanate. The formation of thiocyanate is
Jan 1, 2000
-
Mining Foundation of the Southwest Honors its 2005 InducteesThe 23rd annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Tucson Marriott University Park Hotel, Tucson, AZ on Saturday, Dec.
Jan 1, 2005
-
Knelson-Deswik Mill: Evaluation Of Operating Variables ? IntroductionBy D. Rahal
All ores have an economic optimum particle size (Wills and Napier-Munn, 2006). This optimum value is often a compromise between the need to achieve adequate liberation for the efficient separation and
Jan 1, 2011
-
Experience With V-Mole Operations In Hard Rock FormationBy Hans-Werner Tonscheidt
Introduction The endeavours to mechanise the shaft sinking operations have led to the development of shaft boring using a V-Mole. The method implies competent ground and a pilot hole of sufficient
Jan 1, 1991
-
Pneumatic-Hydraulic Material Transport System For The Rapid Excavation Of Machine-Bored TunnelsBy James W. Martin, Robert R. Faddick
INTRODUCTION Virtually every sector of society in our country feels the impact of tunnels, either through the transportation of water, commodities, or people. The economic implications are staggeri
Jan 1, 1974
-
Construction Of First 20-Foot Diameter Machine-Bored Raised ShaftsBy R. A. Pond
Two 6.17 m (20 ft 3 in.) diameter raises, concrete-lined to 5.49 m (18 ft) inside diameter, were completed in 1978 at the Monterey Coal Company Number One Mine near Carlinville, Illinois, by Frontier-
Jan 1, 1979
-
Chemical Consolidation In A Mixed Face TunnelBy Terence G. McCusker, E. Roy Anderson
A four-mile length of interceptor sewer tunnel in Manhattan has finished sizes ranging from 10'6" to 14'6" horseshoe. Mixed face conditions were anticipated in three areas and encountered in
Jan 1, 1997
-
Treatment of Gold Mill Effluents - The Canadian ExperienceBy James S. Scott
Effluents discharged from gold mills, and more recently from heap leaching operations, pose significant hazards to the environment if not properly managed prior to discharge. This paper describes the
Jan 1, 1987
-
Cone Beam X-Ray Microtomography - A New Facility For Three-Dimensional Analysis Of Multiphase MaterialsBy J. D. Miller, C. L. Lin
As the techniques and resolution for three-dimensional spatial analysis have advanced in the last decade, it is now possible to map in detail the microstructure of multiphase materials in three-dimens
Jan 1, 2003
-
Mineralogy And Geochemistry Of Mine Wastes: Keys To Avoid PollutionBy J. Loredo
Wastes related to abandoned mine sites can constitute important potential pollution sources, depending on their mineralogical and geochemical characteristics and volume. Mine waste disposal sites cont
Jan 1, 2006
-
Investigation On The Leaching Of Pyrite In A Germ-Free SystemBy L. Ou
This paper reports on research on leaching pyrite in a germ-free system. The effects of mineral particle size, pulp potential and various oxidation agents on pyrite leaching were studied. The results
Jan 1, 2007
-
Solutions Management At Cerro VerdeBy O. Bernal, G. Velarde
Sociedad Minera Cerro Verde, majority owned by Phelps Dodge produces 200M lbs per year of LME Grade A copper from low cost leaching of secondary sulfides and SXEW processing. Central to the success of
Jan 1, 2004
-
Sustainability at BucyrusBy U. Paschedag, H. Bussmann
"Bucyrus manufactures the most comprehensive product portfolio of mining equipment worldwide. Its mission is to have a positive, lasting effect on our world. Bucyrus makes sustainable development a fu
Jan 1, 2011