Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Redesign Aspects Of Lignite Mine Reclamation: A Case Study In Greece

    By M. Menegaki

    Restoration of abandoned mine sites is still one of the weak points of mining practice. The latter stands especially for the case of the surface coal and lignite exploitations, where the extended size

    Jan 1, 2005

  • SME
    Introduction To Computer Graphics Applied To Mine Planning And Design

    By Betty L. Gibbs

    The ultimate objective of mine design is to determine the development and untilization of mining resources. Computer Aided Design (CAD) and automated mapping are becoming very popular in engineering a

    Jan 1, 1989

  • SME
    Cip Recovery Of Gold From Flotation Concentrate

    By P. Ollivier

    The ore-processing plant of the Soremib mine Pour a (Burkina Faso) has now been in uninterrupted operation for 3 years. Ores from the oxidized and non-oxidized zones of the deposit are processed toge

    Jan 1, 1998

  • SME
    Eurotunnel - UK Side Plant

    By C. J. Kirkland

    The paper describes the arrangements for the casting, curing and handling at the casting yard, of the concrete segments for the lining of the UK half of the tunnel, and the plant used for the handling

    Jan 1, 1989

  • SME
    Monitoring Blind Backfilling in Abandoned Mines

    By Peter J. Huck, Bruce G. Stegman, Richard E. Thill

    Introduction Backfilling of mine voids is used to prevent or control the effects of subsidence on surface structures. The pumped-slurry, blind backfilling process has been successful for stabilizing

    Jan 12, 1983

  • SME
    Review of 1988 international mining activities

    By Charles L. Kimbell

    The year 1988 for the minerals indus¬try was one of favorable worldwide economic conditions for continued, rationally constrained growth. There was continued improvement in relations between market

    Jan 1, 1989

  • SME
    An Option Approach to Mining Investment Decisions

    By Jorgen Elbrond, Xiaoli Tang

    In this paper we apply continuous-time option pricing theory (Dixit 8 Pindyck 1994) to show how to obtain an optimal investment rule for a mining project which requires sequential in- vestments. The a

    Jan 1, 1996

  • SME
    A Practical Guide On Selecting And Optimizing Rare Earth Magnetic Separators

    By R. Gehauf

    Magnetic separation using rare earth rolls (RER) and rare earth drums (RED) have seem tremendous development and use in recent years. While the process of magnetic separation is understood, the princi

    Jan 1, 2004

  • SME
    Structural Analysis Of Mine Pillars Using Finite Element Method ? A Case Study (33d11900-f541-447c-9266-57bec509d8a1)

    By D. H. Y. Tang

    3-dimensional finite element modeling was performed to analyze the safety factors of stump pillars, 18 ft. x 18 ft., under a cover of 208 ft. using the Modified Drucker-Prager Theory. The results show

    Jan 1, 1987

  • SME
    Geologic Resources Versus Ore Reserves

    By Alan C. Noble

    Ore reserves are often less than 30% of geologic resource estimates that are initially prepared by exploration geologists. Differences of this magnitude between resources and reserves can lead to seri

    Jan 1, 1992

  • SME
    Coal pillar extraction under weak roof

    By Sahendra Ram, Ashok Kumar, Rakesh Kumar, AMIT KUMAR SINGH, Dheeraj Kumar, Arun Kumar Singh, Rajendra Singh

    This paper describes the successful mechanized extraction of coal pillars in 11 panels using the fish-tail method from 2010 to 2017 at Pinoura Mine in India. This method proved its potential of coal r

  • SME
    Superbowl .. A New Generation In Centrifugal Concentration

    By W. T. Plummer

    • The SuperBowl is a fluidized bed, semi-continuous, enhanced gravity separator for gravity gold recovery. The market for this type of equipment has, until recently, been dominated by a single suppli

    Jan 1, 1996

  • SME
    Mine closure: a conceptual review

    By H. M. Lima, P. Wathern

    There are many different words to describe mine closure, including rehabilitation, reclamation, restoration and decommissioning. Closing mining operations, mainly open pit mines, has required resoluti

    Jan 1, 2000

  • SME
    Electrochemistry of Sulfide Flotation

    By R. Woods

    INTRODUCTION Gaudin (1), considered that "the mechanism of mineral collection is the central problem of flotation theory". From their work on adsorption phenomena in flotation for more than fifty ye

    Jan 1, 1976

  • SME
    Wallaby Planned Failure

    By A. Haile, A. Poole

    During 2001-2002, the Granny Smith Mine of Western Australia undertook the development of a planned circular failure. Excavation took place in an interim pit wall that intersected the transported sed

    Jan 1, 2004

  • SME
    Mineral Process Flowsheet Synthesis

    By Gordon E. Ager

    A technique for the synthesis of mineral processing flowsheets from laboratory batch test data is described and examples of the application of the procedure are given. The procedure requires the colle

    Jan 1, 1989

  • SME
    Leaching Practices at Mantos Blancos

    By G. Tapia, R. J. Kelley

    Empresa Minera de Mantos Blancos S.A. operates two copper mines in Chile: Mantos Blancos and Mantoverde. Oxide ore is processed by acid leaching followed by SX-EW to produce copper cathodes. In order

    Jan 1, 1998

  • SME
    Accuracy analysis of GIS-based coal resource estimation

    Little faith can be placed in a coal resource estimate without a clear understanding of the estimate's accuracy. Different types of coal resource estimates require different levels of accuracy. P

    Jan 1, 2000

  • SME
    Effects of Wellbore Liquids in Propellant-Based Fracturing

    By J. F. Cuderman

    In situ experiments at the Department of Energy's Nevada Test Site (NTS) have extended the technology of propellant-based fracturing to include liquid- filled, uncased boreholes. Previous work ha

    Jan 1, 1986

  • SME
    Portland, Oregon’s Alternative Contract Approach to Tackle a Complex Underground Project

    By Glenn Boyce, Paul Gribbon, Gary Irwin, Greg Colzani, Jim McDonald

    This paper discusses the process utilized by the City of Portland Oregon’s Bureau of Environmental Services (BES) to procure and compensate Impregilo-SA Healy (I/H)for the West Side Willamette River C

    Jan 1, 2003