Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Testing And Evaluation Of An Engineering Noise Control On A Longwall Stageloader

    By D. Armour, E. R. Bauer, D. R. Zuchelli, T. M. Durr, E. R. Reeves

    A team of noise specialists from the National Institute for Occupational Safety and Health (NIOSH), Mine Safety and Health Administration (MSHA), and Joy Manufacturing attempted to evaluate an enginee

    Jan 1, 2005

  • SME
    Dynamic Programming In Mine Planning And Production Schedulling

    By F. H. Muge

    This paper intends to present a general methodology implemented in a software package and which can be applied, whatever the exploitation methods, mining constraints and time basis, to mine planning a

    Jan 1, 1992

  • SME
    Boring Through a Rock-Soil Interface in Singapore

    By Nicola Della Valle

    The Singapore Land Transport Authority (LTA) is currently expanding capacity by extending their Metro system from South of the city to the North East end of the island. The scope of Contract 704 in

    Jan 1, 2001

  • SME
    Variability in Rock Strength From Ultrasonic Testing

    By Shahzad Moosa, John M. Pitt

    Statistical variability in rock strength can be evaluated by rapid, inexpensive ultrasonic pulse velocity measurements, an important consideration since rational probabilistic design in rock is often

    Jan 1, 1986

  • SME
    Geochemistry Of Anomalous Lithium In Oil-Field Brines

    By A. Gene Collins

    The demand for lithium may increase because of its potential use id lithium batteries and in the generation of electrical power by fusion. Therefore, lithium abundance in some United States oil-field

    Jan 1, 1978

  • SME
    Radium-226 And Other Group Two Elements In Abandoned Uranium Mill Tailings In Two Mining Areas In South Central Ontario

    By M. Kalin, H. D. Sharma

    INTRODUCTION The inactive uranium mill tailings investigated in this study are located in two mining districts, Elliot Lake and Bancroft, Ontario, Canada. The sites exhibit a mixture of surface fe

    Jan 1, 1981

  • SME
    Practical Due Diligence in Fire Assay

    Due Dilligance does not only lie in the statistics, but rather in the practical process aspects, which is the window to understanding the statistics.

    Jan 1, 2005

  • SME
    Hungary’s Selmec Mining School, one of Europe’s oldest, celebratesits 250th anniversary

    By Frigyes Egerer, Pál Bárczy

    Introduction Charles III, Holy Roman Emperor and King of the Austro-Hungarian Monarchy, established one of the first mining schools in Europe on June 22, 1735, in Selmecbanya (Schemnitz in German a

    Jan 6, 1986

  • SME
    Automatically Controlled Continuous Mining Machines Computer Simulation of Control System Performance

    By Michael G. Nelson

    A computer simulation of the automatic control of continuous mining machines has been prepared, similar to previous simulations of longwall mining systems and coal thickness sensors. The simulation al

    Jan 1, 1993

  • SME
    Modelling Of A Phosphate Deposit By Geostatistical Methods

    By E. Lefeuvre

    Precambien in age, the phospate deposit under study which outcrops to the south forms a synclinal consisting of only one mineralized horizon. The synclinal strikes SSW/NNE, dips from 30 to 60 NNE and

    Jan 1, 1986

  • SME
    Low-Temperature and High-Temperature Origins of Elemental Sulfur in Diagenetic Environments

    By Hans G. Machel

    In low-temperature diagenetic environments (0 c T c 60 - 80°C), elemental sulfur forms by six common processes: via (1) inorganic oxidation of H2S by molecular oxygen, (2) inorganic oxidation of H2S b

    Jan 1, 1992

  • SME
    Evaluation Of Catalyzed Ceramic Diesel Particulate Filters

    By K. L. Bickel

    Catalyzed diesel particulate filters (CDPFs) are used for reducing diesel particulate matter (DPM) concentrations in underground mines. The U.S. Bureau of Mines is conducting research on how catalyzed

    Jan 1, 1994

  • SME
    Leachwelltm In Cyanide Soluble Copper Assays

    By David A. Collins

    Red Dome Gold Mine classifies ore types within the pit by gold and copper grades. Copper grades are further distinguished by total copper and cyanide soluble copper levels. At present, Cyanide Soluble

    Jan 1, 1995

  • SME
    Designing a final wall blast to improve stability

    By J. P. Savely

    This paper describes the development of a trim blast design to improve the stability of a final pit wall. Description is given of the effects of rock characteristics, rock type, and pit plans on the b

    Jan 1, 1987

  • SME
    Coal Supply and Demand – A Review of 1991 Activities

    By B. D. Hong

    The Coal supply and demand review arrived too late to appear in the May issue. In 1991, the US coal industry produced 902 Mt (994 million st) of coal, according to preliminary data compiled by the

    Jan 1, 1992

  • SME
    Chemical Grouting To Control Ground Losses And Settlements On Los Angeles Metro Rail Contract A146

    By S. R. Wardwell, M. J. Robison

    INTRODUCTION The first phase of the Los Angeles Metro Rail Project consists of 7.1 km of subway and stations running through downtown Los Angeles from Union Station to MacArthur Park. Contract A146

    Jan 1, 1991

  • SME
    Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)

    By Jeff Salai

    The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa

    Jan 1, 2001

  • SME
    A Simulation of a Multi-Pit Surface Mining Operation - Introduction

    By C. B. Manula

    This paper presents the results of an application of the PSU/USBM Open Pit Materials Handling Simulator (1) to a large stripping mine in the Southwestern Coalfield. The specific objective of the study

    Jan 1, 1979

  • SME
    Backfill No Top Access Narrow Vein Cut And Fill Stope At Hollister Mine ? Introduction

    Stope width was controlled around 3.5 feet for the narrow high grade vein system at Hollister Gold Mine. Without top access, backfill material was pumped from bottom access up into stope through a ser

    Jan 1, 2011

  • SME
    Water Control Measures, North Shore Inline Interceptor Phase Ia Tunnel Milwaukee Water Pollution Abatement Program

    By Donald J. Olson, Thomas J. Lutzenberger, John Ramage

    The North Shore Inline Interceptor, Phase IA tunnel is a 8,550-meter (28,000-ft) interceptor tunnel currently being constructed by Traylor Bros./Frontier-Kemper, Joint Venture, using a 9.8-meter (32-f

    Jan 1, 1989