Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improved Flow Measurement and Control are Key to EfficiencyBy Alena Johnson
"Much of the copper being produced today uses heap leaching, where pure metal is extracted from the ore with a chemical process rather than smelting. This technique is deployed extensively in major co
Jan 10, 2018
-
Dynamic Unfolding-Complex Geology Case Study of Tenke-Fungurume DepositsBy Justin Cardwell, Alyson Cartwright
"Grade estimation is the cornerstone of longrange mine planning. Pit designs, metal recovery, mining costs, reserves calculations and reporting are all dependent upon a reliable grade model. If the ge
Jan 1, 2015
-
Critical Issues In Recent Coal Project FinancingsBy James M. Griffin
Ladies and Gentlemen, There have been no less than ten major coal project financings in the last eighteen months. Each of these has been in the order of $100 million to $1 billion for the development
Jan 1, 1984
-
Purification and Removal of Hematite from Talc by Acid Leaching Assisted by Chlorination Techniques - Mining, Metallurgy & Exploration (2021)By Arshad Ali, Mudassar Khan, Waqas Ahmad, Nisar Muhammad, Muhammad Salman
Talc is an important industrial commodity due to its wide-ranging intrinsic properties; however, the presence of iron oxide hinders its industrial utilization. Herein, we report the purification of Pa
Aug 9, 2021
-
Dual-Alkali Scrubbing At Stillwater Mining CompanyBy G. K. Roset, L. R. Woodland, J. A. Stevenson, G. J. Hodges
The Stillwater Mining Co. (SMC) is a partnership of Pittsburg & Midway Coal Mining Co. and Manville Corp. Since the summer of 1990, SMC has operated a precious metals smelter at Columbus, MT for furth
Jan 1, 1993
-
High Coal Steep Seam Mining At Sunnyside Utilizing Longwall Technique ? IntroductionBy Earl R. White
In 1950 Kaiser Steel Corporation acquired control of the Utah Fuel Company, a pioneer Utah coal concern owning large reserves of high volatile coking coal near Sunnyside, Utah. The mines at Sunnyside
Jan 1, 1976
-
Comparison Of The Fos And Srf Values From Slope Stability Analyses Of A Large Open Pit - SME Annual Meeting 2022By J. Killian, S. Cox
Many questions exist within the geotechnical industry as to the applicability of Strength Reduction Factor (SRF) values to the design acceptance criteria (DAC) of mining operations. There are many fac
Mar 2, 2022
-
A Comparison Of Analytical Models For Diffusional Deposition Of Radon Daughters In A Human Ling BifurcationBy Antoon W. van der Vooren, Colin R. Phillips
A comparison of analytical models used to describe deposition in the first generation of lung bifurcations is presented. In order to allow testing of the mathematical models, experimental data were ob
Jan 1, 1981
-
Part 3: Dry Particle ConcentrationBy James D. Hervol, Josepph W. III Leonard, Barbara J. Arnold
INTRODUCTION Dry concentration or pneumatic cleaning uses air currents as the separating medium. Pneumatic cleaning in the United States today is limited to three or four operations. In fact, the qua
Jan 1, 1991
-
Regulatory Philosophy And Requirements For Radiation Control In Canadian Uranium Mine-Mill FacilitiesBy Aladar B. Dory
INTRODUCTION Anyone familiar with the problems of hardrock mining will agree that the majority of the serious dangers present in mining are quite visible and obvious to any person reasonably famili
Jan 1, 1981
-
North American Tunneling Conference Drives ValueThe theme of the 2012 North American Tunneling conference (NAT) was ?Tunneling: Driving Value.? This theme best reflects where the tunneling and underground construction industry is to-day. Major ad
Jan 1, 2012
-
Benefictation of a Semi-Taconite by High-Intensity Wet Magnetic SeparationBy A. M. Gaudin
The recent study by R. M. Hays(l) prompted the study summarized in this paper. In his Interesting paper, Mr. Hays shows fine results to be attainable by a relatively complex flowsheet on a semi-taconi
Jan 1, 1971
-
Cone Beam X-Ray Microtomography – A New Facility For 3d Analysis Of Multiphase MaterialsBy J. D. Miller, C. L. Lin
As the techniques and resolution for 3-D spatial analysis have advanced in the last decade, it is now possible to map in detail the microstructure of multiphase materials in three-dimensional digital
Jan 1, 2001
-
Wet Scrubbing Of Coal Dust From Thermal DryersBy Thomas Gleason
Wet scrubbing of fine coal from Thermal dryers poses a number of problems in adapting the gas cleaning equipment for required clean-up of the fine particulate matter. Among then are: 1. The dust
Jan 1, 1962
-
Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access ProjectBy A. J. Thompson
The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se
Jan 1, 2012
-
Peru Remains Committed to Its Mining IndustryBy Steve Kral
Despite low commodity prices and mining industry cutbacks throughout the world, Peru remains one of the industry’s bright spots. The country’s remarkable economic turnaround during the 1990s remains
Jan 1, 2000
-
Use of a Total Flammable Gas Detector in Mine RecoveryBy J. E. Chilton
Methanometers with catalytic heat- of-combustion sensors used in coal mines today will read low for flammable gases when oxygen (0,) concentrations are low or when methane (CH,) concentrations are gre
Jan 1, 1992
-
The Application Of Ore Characterization In The Production Of Iron Ore PelletsIntroduction The science of geometallurgy requires that ore characterization be performed holistically, that is, with consideration of ore quality on plant performance and product quality. Geometall
Jan 1, 2007
-
The Distribution Of Hall Rock Alteration .Mid Trace Elements In The Pachuca-Real Del Monte District, Hidalgo, MexicoBy John E. Dreier
The Pachuca-Real Del Monte district, Hidalgo, Mexico (Figure 1) has produced roughly 1,500,000,000 oz Ag., 6,000,000 oz Au. and minor Pb., Zn, and Cu from about 100,000,000 tons of ore since discovery
Jan 1, 1978
-
Design Aspects Of The Minera Alumbrera Concentrator CircuitBy V. P. Keran
Design of the Bajo de la Alumbrera Project started in June 1995 and concentrate production commenced early in the Third Quarter of 1997. The project is situated in North-Western Argentina and is being
Jan 1, 1998