Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Scrubber Design For Removing Sulfur Dioxide From Off Gases Of Coal Burning Power Plants And Metallurgical SmeltersBy Lewis. Clifford J.
The purpose of this article is to present design information and operating data on a pilot gas scrubber which is believed to be a new approach for removing noxious gases and particulate matter from th
Jan 1, 1973
-
Efficiency Of Copper Supported Vermiculite Nano-Antibacterial Material Against Escherichia ColiBy S. Shi, J. Y. Hwang, B. Li
Silver, copper, and zinc are commonly known elements with antibacterial and antifungal capabilities. Attempts have been made to dope silver on minerals, glass, and ceramics and the resulting materials
Jan 1, 2002
-
Environmental Permitting Considerations For True In Situ Copper Mining In The State Of ArizonaBy Ralph E. Weeks
Utilization of true in situ technologies for mining copper in Arizona will involve a complex environmental permitting process. This process is a key factor in determining the feasibility, costs, and i
Jan 1, 1988
-
Numerical Simulation of the Relaxation Behavior of Failed Sandstone Specimens "Mining, Metallurgy & Exploration (2020)"By Yuting Xue, Brijes Mishra
The relaxation test on sandstone specimens showed typical behavior in pre-failure region and stepwise behavior in the postfailure region. Overall, more significant stress relaxation occurred within th
Jun 25, 2020
-
Using Gridded Surfaces to Estimate Blasthole Delay Cost Near Protected StructuresBy T. Faulkner, S. A. Richards
"The Scale-Distance formula is one of the primary means of determining the maximum amount of explosives that can be safely detonated at one time by a single delay. This paper describes a method of app
Jan 1, 2016
-
Economic Aspects Of Postmining Land Use PlanningBy R. J. Sweigard
The effects of postmining land use planning are addressed in this paper. These effects may include savings in reclamation costs and increased value of reclaimed land. However, this may result in great
Jan 1, 1985
-
Assessment Of Modeling Techniques For Prediction Of Subsidence Over Longwall AreasBy A. W. Khair
This paper presents an assessment of modeling techniques in predicting subsidence over longwall areas. Extensive instrumentation, both at the surface and subsurface of three longwall mines in northern
Jan 1, 1989
-
Preface to the MME Special Focus Issue in Memory of Emeritus Professor Frank F. Aplan: Between Theory and Practice - Mining, Metallurgy & Exploration (2022)By Barbara J. Arnold
Combat Infantrymen’s Badge and Bronze Star Medal. Following his discharge from the Army, he re-entered SDSM&T in 1946 and earned a B.S. degree in Metallurgical Engineering in 1948. He then received an
Jan 3, 2022
-
Overcoming Design Challenges on the Ohio River Tunnel to Improve Water Quality in Pittsburgh, PA - NAT2024By Zhenqi Cai, Mike Lichte, Kimberly Kennedy
The Ohio River Tunnel is the first of three combined sewer overflow tunnels to be constructed under Allegheny County Sanitary Authority's Clean Water Plan. The project consists of a total of approxim
Jun 23, 2024
-
Improved Methodology For Contact Angle Measurements On Coal (Heterogeneous) SurfacesBy J. Drelich, M. Pawlik
An improved experimental procedure to measure contact angle has been consolidated with coal surface preparation involving polishing with abrasive paper, alumina powder, and a cloth, followed by ultras
Jan 1, 1999
-
Recovery of Gold and Silver from a Sulfidic Ore Cyanide and Chloride Leaching after Chlorination RoastingBy James L. Hendrix, R. Y. Wan, David W. Kappes, Jinrong Zhang, M. C. Fuerstenau, Terence E. Albert
A sulfidic flotation tailings ore, containing 1.14 gpt Au and 242.53 gpt Ag, was treated by low temperature chlorination roasting followed by cyanide or chloride leaching. Eighty per cent of Ag was re
Jan 1, 1993
-
Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station—Warsaw Underground Line IIBy Achille Balossi Restelli, Elena Rovetto, Andrea Pettinaroli
"The Station “C13” of Warsaw Underground Line II, with tunnel crown 10m below the water table, required the excavation of three connection tunnels, underpassing a six-lane in service road tunnel, work
Jan 1, 2016
-
Heap Leach Recovery Study Based On Crushed Ore Particle Size Distribution and Compaction DegreeBy S. Lee, F. Campero
"Past heap leach design has evaluated hydrodynamic parameters based on a uniform particle size of heap material, but has ignored the equal importance of the instability of fine migration within heap s
Jan 1, 2016
-
Managing A Mining Operation Requires Actionable Production IntelligenceBy John MacDonald
An unstable economy has shown businesses what the mining industry has known for decades ? a successful business location today may not succeed in the future. Unexpected expenses, natural events and wo
Jan 1, 2013
-
Moon Creek Reclamation Project Creative Solutions For An Historic Mine SiteBy B. A. Ridolfi, S. M. Alvarez
The Moon Creek Reclamation Project provides a case study in the development of creative cleanup solutions for an abandoned lead and zinc mine and mill site located in northern Idaho. Innovative design
Jan 1, 1999
-
The Recovery Of Hematite And Chromite Fines And Ultrafines By Wet Magnetic Methods (e9d4edea-7542-4ba5-a636-1deab2fb583f)By Y. Wang
Wet magnetic separation methods for recovering hematite and chromite fines and ultrafines are investigated in this paper. These methods include wet high intensity and high gradient magnetic separation
Jan 1, 1993
-
Processing Idgh, And Idghlyvariable, Grade Ores In CipBy Thomas J. DeMull
Amax Gold's Sleeper Mine was brought to production as an open pit mining, cyanidation milling operation in March 1986. The Sleeper deposit is unique in that it contains zones of very high grade gold o
Jan 1, 1998
-
Early Strength Performance Of Modern Weak Rock Mass Shotcrete MixesBy C. C. Clark
The national Institute for Occupational Safety and Health (NIOSH), Office of Mine Safety and Health, Ground Control Engineering Branch is investigating the use of shotcrete in weak rock mass mines wit
Jan 1, 2011
-
The Geology, Alteration And Mineralogy Of The Bullfrog Gold Deposit, Nye County, NevadaBy Jorgensen D. K.
The Bullfrog and Montgomery-Shoshone deposits, outside Beatty, Nevada, have a combined drill-indicated reserve of 17.4 M tons of ore with an average grade of 0.103 oz/t Au and 0.240 oz/t Ag. The depos
Jan 1, 1989
-
Eskay Creek Mine And Mill -A Continued Success (2a3befbd-b7b6-4860-b016-6f19cfa40d34)By G. Biles
The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus 2
Jan 1, 1999