Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Traditional Accounting Return Ratios: A Foe To Business SustainabilityBy B. Karatzoglou
The penetration of sustainability principles in business practices has introduced the necessity for a simultaneous integrated assessment of the corporate economic, environmental and social performance
Jan 1, 2003
-
Gold mineralization in porphyry copper deposits discussedBy David J. Lowell
The gold content of porphyry copper deposits ranges from less than 0.05 g/t to more than I g/t ((0.0017 to 0.035 oz per st) and the average is about 0.05 g/t (0.0017 oz per st) gold. Perhaps the highe
Jan 1, 1989
-
Industrial Minerals 2001Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committee
Jan 1, 2002
-
Gauss At ?2? - ObsoleteBy A. W. Hamilton
If you don't know a gauss from a grasshopper, you may be better off than you, think, particularly if you're an ore dressing engineer charged with the responsibility of selecting magnetic equ
Jan 1, 1971
-
Calibration Of On-Line Ash Analyzers Using Adaptive Neuro-Fuzzy Inference Systems (ANFIS)By M. Galetakis
This paper proposes a new approach for calibration of dual gamma-energy transmission (DU-ET) ash analyser for improved online analysis of run-of-mine lignite. An adaptive neuro-fuzzy inference system
Jan 1, 2006
-
Mining 1992In 1992, the United States economy grew at a rate of 2%. The Gross Domestic Product rose to $5,946 billion. With 257 million people - 635,000 in mining including petroleum - the United States has more
Jan 1, 1993
-
Hydrologic evaluation of post-closure flooding and dewatering of the Homestake MineBy Guosheng Zhan
The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under
Jan 4, 2010
-
The Superfund Hazard Ranking System And Mining SitesBy P. Arell, D. Folkes
This paper presents the basics of EPA’s Hazard Ranking System (HRS), which is used to evaluate sites for possible inclusion on the Superfund National Priorities List (NPL). The paper describes the s
Jan 1, 2004
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy ConstructionBy Peter J. Tarkoy
A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and
Jan 1, 1983
-
EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City ProjectBy Hiroshi Yamazaki
The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass
-
A Watershed Approach To Evaluating Impacts Of Abandoned Mines In The Bear Butte Creek Basin Of The Black HillsBy A. D. Davis
This project took a watershed approach in the evaluation of water-quality impacts from past mining activities and current restoration projects in the Bear Butte Creek basin, a small and well defined d
Jan 1, 1997
-
The Yeelirrie Uranium ProjectBy David L. Bradfield
This paper covers the development of the Yeelirrie Uranium Project from the discovery of the Yeelirrie deposit in 1970 to the present time, with emphasis on the mining, processing, and environmental r
Jan 1, 1984
-
Hydrodynamics Of Slurry Flow Through The Porous Structure Of Ball Charge In Tumbling MillsBy P. Songfack
In this work, the slurry flow in the ball mill is solved with Navier-Stokes' equations and the marker and cell technique (MAC), which tracks the fluid-free surface. Considering different planes i
Jan 1, 1994
-
A Discrete Fracture Network Model for Prediction of Longwall‑Induced Permeability (Mining, Metallurgy & Exploration)By E. Watkins, S. J. Schatzel, V. Gangrade, K. M. Ajayi, Z. Khademian
Longwall-induced deformations could jeopardize the mechanical integrity of shale gas well casings positioned in the abutment pillar of a longwall mine. The in situ and induced fracture networks surrou
Jun 17, 2022
-
Coal Pillar Strength Based On The Ground Reaction Curve ? A New ApproachBy Kazem Oraee
In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i
Jan 1, 2009
-
Estimating the Density of Molten CaF2-Al2O3-CaO Slags based on Optical BasicityBy B. Birol, M. N. Saridede
"Slag density is a significant factor in determining the process efficiency of the electroslag remelting (ESR) process, where calcium fluoride (CaF2)-based slag is formed synthetically to refine metal
Jan 1, 2016
-
Thermodynamic Evaluation Of Oleate Chemisorption At Calcium Semi-Soluble Salt SurfacesBy C. A. Young, J. D. Miller
Thermodynamic data has been obtained for oleate chemisorption at fluorite (CaF2) and calcite (CaCO3) surfaces using adsorption isotherms determined previously at room and elevated temperatures by in-s
Jan 1, 2002
-
Felsic Volcanics And Tungsten In Neoarchaean Hutti Schist Belt, India.By P. Sangurmath, C. Gundewar, M. Riyazulla, V. Vasudev, N. Shadaksharswami
Dharwar craton in the southern Indian shield, comprises the Neoarchaean foreland in the west and a relatively younger accretionary complex composed of granitoids and intervening gold-bearing volcano-s
Jan 1, 2007
-
SO2 abatement in a 440-kW pilot-scale combustor - limestone injection testsBy G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
INTRODUCTION Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler lime
Jan 1, 1987