Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    New Design for a 10 M Universal Double Shield TBM for Long Railway Tunnels in Critical and Varying Rock Conditions

    By Wolfgang Güter, Paolo Romualdi

    Current extensions of the European railway network require long TBM drives in the diameter range of 10 m under critical and varying rock conditions. In view of that and in particular for a 7 km lon

    Jan 1, 2003

  • SME
    Eight To Be Inducted Into National Mining Hall of Fame

    The National Mining Hall of Fame will hold its 13thAnnual Induction Banquet during MINExpo International 2000 in Las Vegas, NV. The gala black-tie (optional) event will honor eight legendary leaders

    Jan 1, 2000

  • SME
    The Simulation Of An Airlift To Provide Insight Into Control And Design Parameters

    By M. S. Janssen

    The development of a design equation for, and the testing of, a constant- flow airlift pump IS described. The predictions of the new airlift model agree with the results of experiments carried out usi

    Jan 1, 1989

  • SME
    Latitudinal/land-mass proximity controls on ferromanganese crust composition and resource potential, Ninetyeast Ridge, Indian Ocean

    By Kira Mizell, James R. Hein, Tracy Conrad

    "The Ninetyeast Ridge (NER) extends roughly N-S as a topographic feature for 5000 km, from 31° south to 10° north (Fig. 1) where it becomes buried beneath the Bengal Fan at its northern end. These two

    Sep 1, 2014

  • SME
    Ground Freezing for the Construction of Deep Shafts

    By Paul C. Schmall, Arthur B. Corwin, Hugh S. Lacy, Derek Maishman

    For reasons of hydraulic design and constructability, water supply tunnel systems are often located relatively deep, in competent rock. Where the rock lies below a thick cover of water bearing soils,

    Jan 1, 1999

  • SME
    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Application Of Metallurgical Principles, Processes, And Equipment To The Preparation And Production Of Mineral Aggregates - Introduction

    By C. E. Golson

    The preparation of aggregates is a form of mineral processing which has been taken for granted for many years, mostly because of its lack of glamour when compared to the winning of metallic minerals f

    Jan 1, 1961

  • SME
    Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site

    By Brian Fulcher, John Eastlund, J. B. Copeland

    Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Pro

    Jan 1, 1999

  • SME
    2-D FEM parametric numerical analysis of inclined coal pillars

    By Kostas Kaklis, Zach Agioutantis, Robin Flattery

    Pillars are used as the primary support structures for underground mining to maintain stability by supporting the over laying strata. In the case of horizontal seams, the pillars are typically subject

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • SME
    A Study On The Separation Of Finely-Divided Magnetite From Silica Particles By Centrifugation With The Help Of Two Immiscible Liquids

    By X. X. Jiang

    An efficient recovery of finely divided magnetite particles of 400/500 mesh from a mixture of magnetite/silica particles has been investigated by imposing a delicate balance between centrifugal and su

    Jan 1, 1992

  • SME
    Development Of The Falconbridge Ferronickel Process

    By R. A. Bergman, P. G. Thornhill

    Development of the Falconbridge Ferronickel Process for treatment of lateritic nickel ores began with laboratory work in 1955, the year the Company commenced exploration of its concession in the Domin

    Jan 1, 1979

  • SME
    Heap Leaching 2 Metallurgical Management Of Heap Leaching: Recovery Prediction And Monitoring And Water Balance Management.

    By Mike Jahraus

    The topic I would like to throw out for discussion this morning concerns the metallurgical solution management of operating a valley fill leach facility where ore depths approach 250 feet and deeper.

    Jan 1, 1999

  • SME
    Urban Tunnelling Experiences on the UK’s Channel Tunnel Rail Link

    By Keith Bowers, Frank Mimnagh, Eddie Woods

    The CTRL London Tunnels The Channel Tunnel Rail Link (CTRL) London Tunnels comprise 36km of internal diameter bores that were driven by Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs).

    Jan 1, 2005

  • SME
    Mining Below the Gabbro Sill, Premier Mine, Cullinan, South Africa.

    By S. McMurray

    INTRODUCTION Towards the end of the 1890s the attention of a prospector by the name of Thomas Cullinan was drawn to the occurrence of alluvial diamonds east of Pretoria. Persistent prospecting work b

    Jan 1, 1982

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008

  • SME
    Metal Recovery From Solution: Designed Separations and the Quest for Value-Added Materials

    By K. Osseo-Asare

    Metal recovery from solution, i.e., the formation of a solid product from a purified aqueous electrolyte solution, is increasingly becoming more than a simple matter of bulk precipitation. In many cas

    Jan 1, 1989

  • SME
    Biocorrosion of Copper by Biopolymers as Examined In Situ, In Real Time FT-IR/CIR/ATR in Conjunction with Pre and Post XPS/AES, The

    By Gill G. Geesey, Michael R. Hankins, Paul L. Wichlacz, Anita Gianotto, John G. Jolley, Randy B. Wright

    Thin films of copper [2.0 nm on germanium internal reflection elements (IREs) and 3.4 nm on germanium discs] were exposed to 10% gum arabic (aqueous solution) , 2% alginic acid (aqueous solution), 1%

    Jan 1, 1989

  • SME
    3. Planning of Underground Materials-Handling Systems ? Introduction

    By L. H. E. Weyher

    A mine is essentially a vast materials-handling system. All other systems found in the mine exist to one degree or another to support the materials-handling functions, from the cutting at the face to

    Jan 1, 1979

  • SME
    Possible Heavy Mineral Resources, Offshore Alabama And Mississippi

    By Stephen H. Stow

    Economically important heavy minerals have been studied in the sediments of offshore Alabama and Mississippi. Sandy samples have been collected from a 200 square mile area from Dauphin to Horn Islands

    Jan 1, 1975