Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Modeling The Eastern U. S. Steam Coal MarketBy Walter C. Labys
This paper reports on recent modeling efforts to analyze the eastern U.S. steam coal market with a cross-sectional econometric as well as a quadratic programming approach. The background to coal model
Jan 1, 1979
-
Effect of mesophilic microorganisms on the electrochemical behavior of galenaBy J. L. González-Chávez, A. Ballester, M. L. Blázquez, F. González
In recent years, the bioleaching of sulfidic raw materials has been of great interest. However, the application of this biotechnology is now very limited for many different complex reasons. The mechan
Jan 1, 2000
-
A Test Of Hypothesis Concerning A Proposed Model For The Underlying Variogram - IntroductionBy Bruce M. Davis
The variogram is the function used to express the intercorrelation of a regionalized variable. It is used to quantify, for example, the natural variability of mineralization and in that sense may be t
Jan 1, 1979
-
Construction of the Pergau Hydroelectric Power Project, MalaysiaBy Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
The Evaluation Of Deeply Ripping Truck-Dumped Copper Leach StockpilesBy G. J. Koons, J. L. Uhrie
Field density studies carried out at the Phelps Dodge Chino Mine have found that truck-induced compaction is limited to the upper 2.4 meters (8 feet) of an individual lift. Hydraulic properties of ma
Jan 1, 2000
-
Empirical approach to the modeling and control of ball mill grindingBy C. Bazin, D. Hodouin
Dynamic experiments were performed in a continuous open-circuit 40x40-cm ball mill using a pseudo-random binary sequence of the feed rate and measuring the variations of the discharge particle-size di
Jan 1, 1987
-
Production Experience And Computerized Evaluations Of The Seabrook Tunnel ExcavationBy Frank X. Bellini, Marc Saidman, Allen J. Hulshizer, Anthony J. Stewart
The cooling water system for the Seabrook Nuclear Station involves 10.25 Km (33,623 ft.) of 6.7 m (22 ft.) OD hard rock tunnels, over one third of which is under and terminating over 1.6 Km (a mile) o
Jan 1, 1981
-
Raising the Water Table to Create a WetlandBy Steve McIntosh
Restoration of a wetland which was initially disturbed at the turnof-the-century will be undertaken to compensate for the temporary loss of wetlands associated with future mining operations. The prop
Jan 1, 1993
-
Investigation of the Effect of Drill Bit Rotation Speed on Sustainable DrillingBy Sertaç Dündar, Bilgehan Kekeç, Arif Emre Dursun, Niyazi Bilim
"Estimation of rock drillability is vital for mining and boring operations. For this purpose, many researchers have developed various models and equations to estimate rock drillability. Most of these
Jan 1, 2017
-
Reagents for the Flotation of Non-Sulfide OresBy F. F. Aplan
Rather than reiterate what is well known about the flotation of the non-sulfide minerals, emphasis has been placed on those separations which are not so effective. These difficult separations are larg
Jan 1, 1994
-
A Geostatistical Contribution To The Use Of Resource/Reserves Classification SystemsBy Jair Carlos Koppe, João Felipe C. L. Costa, Luis Eduardo de Souza
United Nations (UN) has been leading an international committee to define the guidelines in reporting resources and reserves. The system proposed by UN is very similar to the guidelines currently in u
Jan 1, 2002
-
An Empirical Method for the Design of Chain Pillars for Longwall MiningBy Z. T. Bieniawski, Christopher Mark
A new method for the design of long- wall chain pillars, called Analysis of Longwall Pillar Stability (ALPS), is described. The method provides estimates of the relative stability of different longwal
Jan 1, 1986
-
Slurry Rheology Influence on the Performanceof Mineral/Coal Grinding Circuts Part 2By Richard R. Klimpel
Part 2 of this article continues the discussion of a 10-year, multimillion dollar research and plant testing program on slurry rheology and grinding circuits. The first part of the article (ME, Dec. 1
Jan 1, 1983
-
Standing Support Alternatives In Western Longwalls (7cc99861-43d3-4cce-a63e-0bf7ca534e47)By Stephen C. Tadolini, Thomas M. Barczak
Western mines have had limited choices for standing support. Wood cribs were often too soft and unstable. The introduction of the Can support in the early 1990’s provided a very effective alternativ
Jan 1, 2005
-
Geotechnical Exploration for a Lake Mead IntakeBy Richard F. Coon
Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c
Jan 1, 1997
-
A Need For Responsible Risk Assessment In Formulating Public Policy A Case Study: Crystalline SilicaBy Barry A. Hillman
Respirable (PM-10) crystalline silica is regulated by the State of California as a carcinogen. The risk-management of this material by the State exemplifies the inherent problems in the development of
Jan 1, 1992
-
Alternatives for the Dynamic Optimization of Mineral Processing OperationsBy John A. Herbst, William T. Pate, A. Edward Oblad
Dynamic optimization is a cost-effective means to increase production or improve product quality in a plant. Several model-based approaches to dynamic optimization of mineral processing operations hav
Jan 1, 1990
-
Development of a tool for assessing the environmental sustainability of mining facilitiesBy G. Gaidajis, K. Angelakoglou
The development of a tool for assessing the environmental sustainability of mining facilities is described in this study. The tool is based on the analysis of basic components of the examined system,
Jan 1, 2011
-
Planning And Design Features Of The Waller Creek Tunnel, Austin, TexasBy Gary Jackson
Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, w