Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimizing The Performance Of A Rubber Lined Mill (984d8a7d-b8b7-4560-b8c5-1f403afaeb01)By T. Moller
There are differences in design aspects between steel and rubber linings in grinding mills. This paper describes the basic design rules for rubber liners for different grinding applications. When conv
Jan 1, 1989
-
Ok Tedi - On Why Ok Tedi Was Found In 1968By Colin C. Brooks
The Ok Tedi gold/copper deposit of almost 800 million tonnes was found in I968 because at that time technology had just developed sufficiently to enable exploration of such an area, world markets and
Jan 1, 1990
-
Design And Construction Of The Exploratory Shaft Facility -A Regulatory PerspectiveBy J. Peshel
This paper presents a regulatory perspective of the design and construction of the Exploratory Shaft Facility which may become part of the future high-level waste repository. Site characterization con
Jan 1, 1989
-
Influence Of Fill And Fold Plunge On The Central Ross Shaft PillarBy W. G. Pariseau
Regression analysis of calculated on measured displacements were used to assess the influence of fill and fold plunge on shaft pillar mining at the Homestake Mine. These effects were neglected in the
Jan 1, 2004
-
Maintenance Strategy For The 21st CenturyBy Steven A. Tesdahl
Maintenance means keeping equipment running or restoring it to operating condition. However, the 21st century will usher in a broader need for equipment management, a cradle-to-grave strategy to prese
Jan 1, 1998
-
A Novel Approach to the Separation of Fine Gold Using Steric Stabilization with Polymeric FlocculantsBy Q. Yuan, B. Yarar
Steric stabilization is a phenomenon observed when relatively high doses of flocculants are added to fine particle suspensions. Experiments were conducted to establish conditions under which medium vi
Jan 1, 1993
-
Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill GroutBy Lorenzo Pellegrini
The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and
-
Cut And Fill Narrow Vein Mining At HollisterNarrow vein mining, with enough challenge and also where the cutting edge technology can be applied, is still a very important and exciting portion of the mining industry. Based on the deposit charact
Jan 1, 2012
-
Process for the Recovery of Pure Palladium and Platinum Using an 8-Hydroxyquinoline ExtractantBy S. Monette, D. B. Dreisinger, D. Vleeschhouwer, G. B. Harris, G. A. Kordosky
A new process for the recovery of pure (>99.95%) palladium and platinum is described. The process, which has been tested at the pilot scale, comprises (i) the simultaneous solvent extraction of pallad
Jan 1, 1993
-
Discussion – Roof-Control Problems and Supports in a Coal Mine – Mining Engineering, Vol. 43, No. 8, pp. 1062-1065 – Khair, A. W. and Peng, S. S.By J. Parker
Gentlemen; Rainy day in Upper Michigan, a good time to catch up on reading. Am doing that, and have a couple of questions concerning the K and P paper on roof problems and supports. I wonder if the a
Jan 1, 1991
-
Analysis of TBM Performance at the Record Setting River Mountains Tunnel #2By Eric Gilmore, Ron Tudor, Gregory E. Korbin, Bill McCormick, Brad Bush
INTRODUCTION Las Vegas has recently been termed the “Construction Capital of the Country”. It has also been acknowledged as the fastest growing city in the country for several years running. The r
Jan 1, 1997
-
Determining The Effect Of Physico-Chemical Parameters On Floc Size Using A Population Balance ModelBy S. K. Sharma, D. A. Stanley
The US Bureau of Mines is investigating the fundamentals of the flocculation process. The objective of this study was to determine the effects of various physico-chemical parameters, namely, shear rat
Jan 1, 1995
-
Processing Options for the Removal of Nitrate from Mining Process StreamsBy Irwin R. Higgins, Joseph C. Milbourne
The selection of a suitable nitrate removal process depends on a variety of site-specific chemical and environmental issues. The dominant technologies for nitrate removal include biological denitrific
Jan 1, 1995
-
A Dynamic Model For The Competitive Elution Of Gold And Base Metals From Activated CarbonBy S. P. Liebenberg
During the past fifteen years significant progress has been made on carbon-in-pulp (CIP) technology for the extraction of gold. While most research on the mechanisms and kinetics of CIP sub-processes
Jan 1, 1995
-
Reverse Column Flotation Of Iron OreBy T. C. Eisele
The use of column flotation was considered for the ?reverse flotation? of iron ore, where the gangue (quartz) was recovered in the froth product. This use of the froth for carrying the gangue mineral
Jan 1, 2007
-
Longhole Stoping At The Golden Sunlight MineBy H. Bogart
The Golden Sunlight Underground Mine located near Whitehall, Montana was portalled from the bottom of the existing Golden Sunlight Pit in July 2002. Gold was mined by sublevel stoping in the larger o
Jan 1, 2004
-
Changing Sampling Requirements And Systems In Underground Tennessee Limestone MinesBy Randy Sandrik
Sampling has evolved at two large underground limestone mines as conditions and product requirements have grown tougher over 100 years of mine life, requiring innovative techniques to insure delivery
Jan 1, 2005
-
Effect of bucket geometry, machine variables and fragmentation size on the performance of rubber tire loadersBy Atta Ur Rehman, Kwame Awuah-Offei
This paper examines the effect of bucket geometry (cutting-blade profile, floor profile and blade thickness), speed, motor power output and muckpile particle sizes on bucket penetration and draft for
-
Maximizing the processing of polymetallic concentrates via actinide separation and rare earth retrievalBy Mona M. Fawzy, Ahmed A. Eliwa, Ebrahim A. Gawad, Ahmed H. Orabi, Amal E. Mubark
The growing demand for rare earth elements (REEs) has led to numerous recent studies to recover these elements from various bearing ores and wastes. Therefore, the recovery of REEs from Ras Baroud pol
Oct 1, 2024
-
Fully Mechanized Tunnelling Machine And Method To Cope With The Widest Range Of Ground Conditions-Experiences With A Hard Rock Prototype MachineBy Carlo Grandori
Foreword In loose ground and soft rock formations, mechanical tunnel boring is necessarily dependent on the adoption of shield machines and the application of adequate support or lining structures.
Jan 1, 1976