IMPROVING OPERATING COSTS -SHORT TERM AND LONG TERM FocusBy Robert Dunne
Over the last eighteen months, there has been a dramatic r decrease in the gold price fom US$450/oz to a low of US$275/oz. The prospect of low gold prices, around US$300/oz, appears to be a reality th
Jan 1, 1998
-
Large-Diameter Shaft Drilling: A Versatile Tool For Advanced MiningBy D. R. Zeni
Today's mine development requires the safe, expedient and economical construction of vertical shafts for both ventilation and access. This construction must be accomplished within diverse ground
Jan 1, 1996
-
A Radar Coal Thickness SensorBy Walter J. Johnson, Robert L. Chufo
A unique non-contracting coal thickness measurement technique has been developed to measure both the dielectric constant and thickness of a coal seam as part of a sensor array supporting an autonomous
Jan 1, 1992
-
Engineering And Cost Analyses Of Coal Combustion Byproduct Transportation And Handling SystemsBy D. D. Lei, H. Sevim, S. M. Gwamaka
Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated both technically and economically. The objective w
Jan 1, 1998
-
High Pressure Grinding Rolls -A Review - Plenary AddressHigh pressure grinding rolls have found widespread acceptance for cement processing, and are now making their debut in the metalliferous minerals industry. Significant energy and wear material savings
Jan 1, 1997
-
When Tailing Impoundments Go WrongBy Donald R. East
In the planning and design of mill tailing disposal facilities, the chemical and physical nature of the finegrained material to be disposed of has to be fully understood in order to create an efficie
Jan 1, 1992
-
Application Of Ultrasonics To Enhance Wet- Drum Magnetic Separator PerformanceBy J. Franko, M. S. Klima
Wet-drum magnetic separators are used extensively for upgrading iron ore and for magnetite recovery in dense-medium separation circuits. In this study, the performance of a continuous, laboratory wet-
Jan 1, 2003
-
Underwater Disposal Of Partially Weathered Pyritic Waste Rock - Surface And Pore Water Quality ImpactsBy N. K. Davé
Water quality impacts of shallow water submersion of partially weathered and oxidized waste rock containing reactive sulphide minerals were investigated in laboratory column lysimeter studies. The was
Jan 1, 2006
-
Adapting technology to beneficiate a low-grade phosphorite oreBy J. D. Raulerson, R. P. Farias, G. A. Gruber
A flotation process has been developed to successfully treat ore from the Santo Domingo phosphate deposit in Baja California Sur. The ore contained less than 4% P2O5 with quartz, silicates, and carbon
Jan 1, 1988
-
An ecosystem-based management (EBM) approach to marine resource developmentBy Ian Graham
In 2013 the Government of New Zealand launched a number of ‘National Science Challenges’ (NSC) to address major issues facing the nation, and raise public consciousness about science and its role in p
Sep 1, 2014
-
Preliminary Studies of Reinforcement Dynamics for a Reusable Underground Test ChamberBy Richard K. Thorpe, Francois E. Heuze
The concept of a reusable underground nuclear test facility, named HEDEF, has been under study for some time. This rock chamber would have to be engineered to sustain the repeated mechanical and therm
Jan 1, 1986
-
Technical Note - Potential Utilization Of PhosphogypsumBy D. Panda, P. K. Sahoo, A. S. Rao
The waste phosphogypsum produced by Paradeep Phosphate Limited (PPL) at Paradeep (Cuttack, Orissa, India) consists primarily of calcium sulfate with small amounts of phosphoric acid, calcium fluoride
Jan 1, 1994
-
Column Flotation Studies Of Alabama Oil ShaleBy J. G. Groppo, B. K. Parekh
Eastern US oil shale contains approximately 10 to 12 gallons of oil per ton and 7 to 10% pyritic sulfur. Physical beneficiation of these low grade shales using froth flotation provides a high grade ma
Jan 1, 1994
-
Starting My ProfessionMy first regular job nearly fell through. My parents were spending the summer in California and I joined them at Lake Tahoe where we were guests at the lovely summer home of the Reids of Belmont. The
Jan 1, 1976
-
A Contracting Strategy for Managing Risk on Subsurface Projects Delivered Using Design-BuildBy David Corkum, David Hatem
Subsurface construction projects are risky ventures and the decision to deliver a project using the Design-Build model does not eliminate those risks. Differing site conditions, inadequate design, and
Jan 1, 2003
-
Interstate Route H-3 Alternative Dowel Testing ProgramBy Lee W. Abramson, Glenn M. Boyce
A dowel testing program was conducted as part of the Interstate Route H-3 Trans-Koolau exploratory tunnel project on the island of Oahu, Hawaii. The testing evaluated the performance of dowels to be u
Jan 1, 1991
-
Synthesis of Organic-inorganic Hybrid Nanoparticles for Use as Polymer AdditivesBy Anna Arkhireeva, John N. Hay
Considerable interest has been shown recently in organically modified silicates (ormosils) because of the wide range of possible applications for these interesting organic-inorganic hybrids. These app
Jan 1, 2003
-
A Large Underground Opening Measured Versus Predicted Rock DeformationsBy Norman F. Sweeney, H. John Hovland
Over one million yards of granite were excavated for the Helms Pumped Storage Project, including a large underground powerhouse complex. Site investigations and in situ stress measurements were essent
Jan 1, 1981
-
Prediction of Diamond Wire Cutting Performance by Computer SimulationBy A. Vargiu, R. Ciccu, G. Massacci
Based on the current results of field practice and on experimental data obtained in the laboratory with a suitable testing apparatus, the industrial operation of diamond wire cutting can be simulated
Jan 1, 1996
-
Final Tunnel Linings on Oakwood Beach West Branch Interceptor, Staten Island, New YorkBy Peter S. Schneidkraut
This paper will discuss the Final Tunnel Linings which were placed in 6700m of a 2.32m inside diameter precast concrete lined interceptor sewer tunnel in Staten Island, New York. Two methods were empl