Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Safety Control Systems Used In A Hydrogen-Fueled Mine Vehicle

    By Chelsea Woodward

    The Spokane Research Laboratory of the National Institute for Occupational Safety and Health has demonstrated a prototype hydrogen-fueled mining vehicle as an alternative to diesel equipment in underg

    Jan 1, 2006

  • SME
    Shaft Sinking on the MetroWest Water Supply Tunnel Project

    By A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson

    The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f

    Jan 1, 1999

  • SME
    Some unique problems of surface mining in the Arctic

    By M. Sengupta

    Surface mining in arctic regions is characterized by many unique problems. Continuous and discontinuous permafrost (perennially frozen ground) occurs in most of the arctic and subarctic areas. Permafr

    Jan 1, 1988

  • SME
    Petromineralogical studies of late Paleocene–middle Eocene phosphate nodules in the Subathu Basin of Solan District, Himachal Pradesh

    By Shamim A. Dar, Mohd Shuaib, K. F. Khan, Samsuddin Khan

    Petromineralogical studies of late Paleocene–middle Eocene phosphate nodules in the Subathu Basin of Solan District, Himachal Pradesh

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • SME
    Room-and-Pillar Method of Open- Stope Mining - A Classification of the Room-and- Pillar Mining System.

    By Richard L. Bullock

    OPEN STOPING An open stope is an underground cavity from which the initial ore has been mined. Caving of the opening is prevented (at least temporarily) by support from the unmined ore or waste lef

    Jan 1, 1982

  • SME
    Lake Dorothy Hydroelectric Project Lake Tap And Tunnel, Juneau, AK

    By Jason Morrison

    The Norwegian Lake Tap Method was successfully used to tap into the side of Lake Dorothy 36.5 m (120') below the lake surface. The lake tap allows water to flowinto an access tunnel from the lake

  • SME
    Government Involvement In The Bauxite Sector: Government Objectives And Industry Problems With Special Reference To The Application Of A Resource Rent Tax

    By Michael Robert Hodson

    The views expressed in this paper are those of the author and do no necessarily reflect those of CRU. The Extent of Government Involvement In 1982 national governments in the Non-Socialist world

    Jan 1, 1984

  • SME
    Geochemistry Of Abandoned Fluids Associated With The Proposed Underground Solution-Mining Project At The White Pine Mine (89e1aa34-dac2-42e3-b380-5043a8991673)

    By G. A. Doyle

    Until the suspension of conventional operations in 1996, the White Pine Mine was the second-largest active underground copper mine in the United States, underlying an area of approximately 30 km2 (13

    Jan 1, 1997

  • SME
    Developing an empirical summation chart on the distribution of extension fractures in matured yielding pillars using geophysical technique

    By FHATUWANI SENGANI

    The understanding of yielding pillar behavior has been well documented in terms of pillar strength using numerical simulations and empirical formulas, but the understanding of how fracture propagates

  • SME
    Security measures outlined aimed at stemming the growing problem of employee theft at precious metals mines

    By A. Dale Wunderlich

    Introduction Loss prevention programs have become absolutely necessary at any precious metals producing property. In the past eight years, one security company, specializing in precious metals mine,

    Jan 4, 1988

  • SME
    Two case histories of subsidence in the Warrior coalfield - by D.W. Park Technical Papers, MINING ENGINEERING, Vol. 40, No. 3 March 1988,pp. 185-191

    By G. B. Johnston

    I was very interested in Professor Park's data on subsidence over longwall panels. His paragraph labeled "Conclusion," however, does not seem appropriate for the article. Nothing in the article g

    Jan 1, 1990

  • SME
    Gold-Copper Ores Processing / Flotation Process Optimization By The Development Of An On-Line Expert System (308240b5-f416-4047-a45b-a49d3ac7a2e0)

    By Y. Breau, F. Robichaud

    The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • SME
    Discussion - Engineering To Reduce The Cost Of Roof Support In A Coal Mine Experiencing Complex Ground Control Problems - Khair, A. W., Peng, S. S.

    By K. Fuenkajorn, S. Serata

    Discussion by S. Serata and K. Fuenkajorn Background Results of the above study in the August 1991 issue of Mining Engineering offer valuable lessons in the solution of cutter-roof problems. Th

    Jan 1, 1993

  • SME
    CSO Control At Detroit?s Upper Rouge Tunnel

    By Wern-ping Chen

    To mitigate and control the combined sewer over-flows from 17 outfalls in Detroit, MI, three outfalls in Dearborn Heights, MI and eight outfalls in Redford Township MI, the Detroit Water and Sewerage

    Jan 1, 2007

  • SME
    Sustainability Of Stone Quarrying In Protected Environment: The Case Study Of Adamello Brenta Natural Park (Trento Province, Italy)

    By M. Fornaro

    A small size quarrying activity (3 different quarries with an overall production in blocks less than 10.000 m3/year) has been exploiting for a long time the ?Tonalite? deposit of Adamello-Presanella.

    Jan 1, 2007

  • SME
    EPB TBM Technology

    By Werner Burger

    Earth Pressure tunnel boring machines are tackling difficult ground conditions that five years previous were not considered feasible. The technology has evolved that allows EPB TBMs to cross into area

    Jan 1, 2008

  • SME
    Osmosampler: A Salt-Gradient Powered Probe Device To Provide Temporal Records Of Pore Fluid Concentrations In The Deep Seabed

    By Jeffrey P. Chanton

    A specialized Pore-Fluid Array sampler (PFA) was designed to collect and store pore-fluids to monitor temporal changes of ions and gases in gas hydrate bearing sediments. We tested the hypothesis tha

    Jan 1, 2008

  • SME
    Application Of The Quartz Crystal Microbalance With Dissipation Method To A Study Of Oleate Adsorption Onto A Hydroxyapatite Surface

    By J. Kou

    The adsorption process, density and structural property of the oleate layer adsorbed onto a hydroxyapatite (HAP) surface at six different concentrations and three pHs (pH 8, 9 and 10) have been studie

    Feb 1, 2012

  • SME
    Enhanced Ex-Situ Mineral Carbonation At Ambient Conditions With Industrial Waste

    By B. Spigarelli

    Carbon dioxide sequestration by conversion to carbonates has become a promising option for CO2 storage. Experiments were conducted to determine the feasibility of CO2 sequestration at ambient conditi

    Jan 1, 2012