Developments In Computerized Mine Production Scheduling (PRIPRINT 85-69)By Mark E. Gershon
Extensive efforts are under way to- ward applying computer techniques to mine production scheduling problems. These efforts are concentrated in four areas: optimization, computerization of traditional
Jan 1, 1985
-
Room-and-Pillar Method of Open- Stope Mining - Production Methods of Room-and-Pillar Coal MiningBy Richard L. Bullock
INTRODUCTION TO COAL MINE PRACTICES To illustrate the trends and the proportions of the various methods used to mine coal underground, Fig. 1 is useful. However, of all the underground coal mining
Jan 1, 1982
-
Gravity Concentration At Campbell MineBy Brad Hewitt
Since Campbell Mine began processing ore, there has been a gravity gold recovery circuit. From 1947 to 1982, gravity gold was concentrated through the combination of jigs and mercury amalgamation. In
Jan 1, 1996
-
Current Practice Of Pillar Design In US Coal MinesBy K. Biswas, P. Tsang, S. S. Peng
A survey was undertaken in late 1993 and early 1994 to gain insight into the current status of pillar-design practice in underground coal mines in the United States. A total of 552 room-and-pillar min
Jan 1, 1997
-
Tunneling At Forest Glen Station Washington, D.C. MetroBy W. W. Roberts
Key elements to the successful excavation and support of the Forest Glen Station and Tunnels for the Washington Area Metropolitan Transit Authority are discussed. Excavations encompassed a twin-vault
Jan 1, 1983
-
GEOCAD : An Alternative Cad And Artificial Intelligence Tool That Helps Moving Hum Geological Resources To Mineable ReservesBy N. M. Cheimanoff
GEOCAD is an ambitious research program aimed at the development of a computer based system assisting the geologist and the production or planning engineer. BONANZA, its mining part, is a computer pro
Jan 1, 1989
-
Discussion - Performance evaluation of indicator kriging in a gold deposit - by Y.C. Kim, P.K. Medhi, and I.S. Roditis Technical Papers, MINING ENGINEERING, Vol. 99, No. 10 October 1987, pp. 947- 952I found the article most interesting and timely. I consider it imperative that mine case studies like this one are undertaken and published so that the practicing mining engineer and geologist can obt
Jan 1, 1987
-
Amdel Thickener Interface GaugeBy Gary Krix
The Amdel Thickener Interface Gauge (TIG) provides continuous on-line measurement of the level of the liquid/solid interface in thickeners and Counter Current Decantation (CCD) washers. Unlike other i
Jan 1, 1993
-
Treatment of Partially Refractory Ore New Celebration OptionBy Robert Dunne, Paul Gelfi, Vernon Martins
The New Celebration Gold Mine is located 32 km south of the regional mining centre of Kalgoorlie. The current mill throughput is 1.7 million tonnes per annum with a gold production of around 120,000 o
Jan 1, 1991
-
Simulation Modeling Of Autotransport Stream In Metal Open Pits Of Great CapacityBy Y. Astafyev
Autotransport is one of the most conventional kinds of transport in iron ore open-pits. It. is successfully used both independently and in combination with other kinds of transport. In the Krtvoy Rog
Jan 1, 1979
-
Developments in Coal Dewatering in AustraliaBy J. J. Davis, D. G. Osborne
The Australian coal industry is characterised by efficient fines recovery, and the climate does not dictate the use of thermal drying. With the increasing trend to underground mining and hence finer R
Jan 1, 1995
-
Jacked Box Tunnelling Creating Large Shallow Openings Beneath Existing Highways and RailwaysBy J. W. T. Ropkins, D. Allenby
The paper describes a technique by which large concrete boxes are unobtrusively inserted beneath existing highway and railway infrastructure to form new subways, culverts and under-bridges, thus avoid
Jan 1, 2003
-
Conveyor belt entry fire hazards and controlBy H. Verakis
A fire in a coal mine conveyor belt entry represent a major safety and health risk to miners. Fighting belt entry fires can be a commanding effort. If there is a failure of one aspect in the fire fig
Jan 1, 2009
-
A Novel Method Of Raise Development At MolycorpBy J. P. Hedlund
Molycorp's gravity type panel-caving operation employs a system of short raises to transfer ore from the Grizzly Level to the Haulage Level. The raises have normally been developed using a conven
Jan 1, 1991
-
Health And Safety Planning Aids Successful Longwall MovesBy J. J. Webb
At Kerr-McGee's Galatia Mine in southern Illinois, the need for safe and efficient longwall moves prompted a detailed planning effort. Galatia Mine operates two longwalls on separate coal seams w
Jan 1, 1994
-
Developments in computerized mine production schedulingBy M. E. Gershon
Extensive efforts are under way toward applying computer techniques to mine production scheduling problems. These efforts are concentrated in four areas: optimization, computerization of traditional m
Jan 1, 1987
-
Mathematical Modeling Of Time Dependent Radon Flux ProblemsBy Robert C. Bates
Background is given on the various equations used to describe diffusion and convective flow of radon in porous media. Bureau-developed equations for modeling diffusion and Darcy flow through multilaye
Jan 1, 1980
-
Development of a Biooxidation Leach Process at Asamera Minerals (U.S.) Cannon MineBy Donald C. Moore
Asamera Minerals Cannan Mine has been producing a 170 g gold/tonne (5 oz gold/ton) siliciaus flotation concentrate since July 1985. Flotation concentrate is shipped to a smelter for gold recovery. Num
Jan 1, 1989
-
Trona: An OverviewBy R. T. Leigh
The continued decline In the production of synthetic soda ash (sodium carbonate) due to high costs and associated environmental factors, has improved the world demand for natural soda ash. The largest
Jan 1, 1989
-
Medusa's Reclamation Programs In Three StatesBy R. D. Shackleton
Medusa Cement Company, a division of Medusa Corporation, is a medium-sized cement manufacturer serving the midwest, east, and southeast. Medusa's eight plants are located in Georgia, Pennsylvania
Jan 1, 1974