Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Copper Electrolite Solution FiltrationBy Judson G. Brown
In the May, 1969 issue of Mining Engineering the Editorial Director, John V. Beall, described the Japanese Onahama Copper Smelter and Refinery as follows: "On the shore of the Pacific, 120 miles nor
Jan 1, 1970
-
Heap Leach Recovery Study Based On Crushed Ore Particle Size Distribution and Compaction DegreeBy S. Lee, F. Campero
"Past heap leach design has evaluated hydrodynamic parameters based on a uniform particle size of heap material, but has ignored the equal importance of the instability of fine migration within heap s
Jan 1, 2016
-
Decision Support System for Monitoring and Stability Assessment of The Tailings Storage FacilityBy Bartłomiej Bursa, Paweł Stefanek, Paweł Stefaniak, Sergii Anufriiev, Wioletta Koperska, Maria Stachowiak
The article presents the main functionality of the DSS class system for monitoring and stability assessment of tailings storage facilities. The presented demonstrator was deployed on the example of th
Jun 25, 2023
-
The Hot-Stage Microscope: An Important Tool For Chemical-Metallurgical Research At Elevated Temperatures ? IntroductionBy A. R. Conroy
Microscopic observation of physical and chemical changes which take place in various materials under conditions of elevated temperature and controlled atmosphere can often yield valuable insight into
Jan 1, 1964
-
Effect Of Microwave-Induced Damage On Single-Particle Comminution Of OresMicrowave pretreatment can improve grindability by weakening brittle particulate material prior to size reduction. The differential thermal expansion experienced by multiphase materials during rapid h
Jan 1, 1996
-
Drilling And Blasting Techniques At The Navajo MineBy Richard W. Amerman
The final cost and quality of a project employing equipment, labor, and materials is dependent upon the expediency and extent to which each of these parameters are used. An ideal solution then, would
Jan 1, 1969
-
Twin TBM with Four Cutters for Subway Station (RoppongiStation in the Tokyo Metro Line 12)By Susumu Uchiyama
This machine was manufactured for excavation of the Roppongi station of the Tokyo Metro Line 12. This machine can excavate both the platform and the rail track at the same time in locations where t
Jan 1, 1999
-
Electrochemical Characterization Of Bioleaching Of Cadmium SulfideBy F. A. Schinner
The present study has investigated the leachability of cadmium sulfide minerals by Thiobacillus ferrooxidans and the electrochemical reactions involved in the process. Using a cyclic voltammetric tech
Jan 1, 1993
-
Field Test Of An In-Seam Seismic - Based Void Detection TechniqueBy M. Ge
An in-seam seismic (ISS) - based void detection technique was developed and tested for three general mine conditions: anthracite, bituminous and trona. The detection range tested varied from 80 to 100
Jan 1, 2010
-
Investigation of Alumina-Based Ceramic Production from Aluminum Black Dross "Mining, Metallurgy & Exploration (2021)"By Umay Cinarli, Ahmet Turan
High-energy consumption in primary aluminum production (from bauxite ores) makes secondary aluminum production (from metallic raw materials such as scrap and dross) very critical. Aluminum dross, as a
Oct 26, 2020
-
Novel fire warning system for underground minesBy K. E. Hjelmstad, W. H. Pomroy
In the event of fire underground, it is essential that all miners be warned as quickly as possible. With mine air rapidly depleted of oxygen and contaminated with smoke and toxic fire gases, any delay
Jan 1, 1991
-
Mini Symposium ? Grinding Performance Of Large Balls Mills II - Population Balance Model Predictions Of The Performance Of Large-Diameter MillsBy J. A. Herbst
In spite of potential theoretical and economic advantages of large-diameter ball mills, many manufacturers elect not to build these mills owing to what is perceived as an excessively large design risk
Jan 1, 1983
-
Ray Modernization And Concentrator Expansion ProjectBy S. A. McGhee
ASARCO Incorporated embarked on a modernization and expansion program to improve overall operating efficiencies and to more effectively develop the large mineral reserve at the Ray Complex Open-Pit Mi
Jan 1, 1993
-
A Generalized Method for Calculating Pillar Cell Capacities for Boundary Element Modeling of Coal MinesBy J. C. Johnson
The problem of estimating pillar capacity in coal mines has motivated development of a variety of empirical equations. Most of these equations have arisen from experience and a very limited set of me
Feb 23, 2014
-
Tunnel Information Modelling in Most Recent Form - Applying BIM technologies and procedures in tunnelling environmentBy Jurij Karlovšek, Marko Žibert, Scott Keniston
"SUMMARY The importance of information management was recognised in surface construction industry decades ago, and has increasingly being recognised through formal process and laws. Around the world,
Jan 1, 2016
-
Coal Oxidation Before Loading With Calcium -Pittsburgh #8 CoalBy E. H. Cho
Pittsburgh #8 coal cleaned by the conventional froth flotation was oxidized in a 2-liter Parr Stirred Top Bench Reactor. The oxidation time was varied up to 5 hours; the temperature, from 150 to 225°C
Jan 1, 1994
-
Decreased Carbon Footprint Through Effective Coal DegasificationGrowing concerns of climate change and its potential association with the release of greenhouse gasses to the atmosphere have prompted possible legislation which would require minimization of greenhou
Jan 1, 2010
-
Stabilization Of Problem Mineral WastesBy Joe B. Rosenbaum
Fine-sized mineral wastes discarded by ore milling plants require stabilization to prevent air and water pollution. Methods devised for achieving this stabilization include physical, chemical vegetati
Jan 1, 1972
-
Application Of Bentonitic Clays In Suspension Fertilizer FormulationsBy J. Hanna
Four Ca-bentonitic clays from Alabama were evaluated for use in Diammonium Phosphate (DAP) or Urea Ammonium Nitrate (UAN) fertilizer suspensions. The viscosity and gel strength of suspensions prepared
Jan 1, 1989
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023