Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Progress Report On The World?s First Direct Fired Coal Burning Gas Locomotive ? Built By Union PacificBy Harold Rees
[This report supplements and brings up to date a paper prepared earlier this year for presentation at the Eleventh Pan American Railway Congress to be held in Mexico City, October 18 to 31, 1963. In o
Jan 1, 1963
-
The Braden Mine Fire - A Case HistoryBy John J. Reed
The 1945 fire at the Braden (El Teniente) Copper Mine in Chile took 354 lives, and ranks as the most lethal metal mine fire in history. The mine was developed in the wall of a canyon over 900 m (3,000
Jan 1, 1989
-
New Age Grinding Controls (Sierrita Strategic Grinding Controls)By O. A. Bascur
The problem of setting the proper control objectives and/or having several objectives to be met in the implementation of grinding control strategies can be resolved. The design and implementation of a
Jan 1, 1989
-
Record Production Of Industrial Rocks And Minerals In UtahBy B. Tripp
Utah produces a wide variety of industrial rock and mineral commodities, valued in 2005 at a record $758 million (21 percent of the total non-fuel mineral production of Utah). Major commodities produ
Jan 1, 2007
-
The Performance Of A Four-Inch Hydrocyclone At Near Rope Conditions And Different Feed Slurry TemperaturesBy Harald F. Solberg
A preliminary study of the performance of a 4-inch Krebs cyclone at near rope conditions and different feed slurry temperatures was completed. Results suggest that temperature influences the x50c size
Jan 1, 1981
-
Quantitative Vibration Evaluation Of Modified Rock Drill HandlesBy T. N. Moore, E. M. De Souza
Vibratory hand-tools can produce Hand Arm Vibration (HAV) Syndrome in their operators. This disease, often called Vibration White Finger, can cause varying levels of hand-arm discomfort and, in severe
Jan 1, 1992
-
Pilot Study On The Influence Of The Eccentric Speed On Cone Crusher Production And OperationBy D. Jacobson
There are many different machine setup parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the eccentric speed at which the co
Feb 27, 2013
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario OperationsBy T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)By S. Ersayin
In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im
Jan 1, 2008
-
The Development of a Multiple Level Underground Limestone Mine from Geology through Mine PlanningBy Christopher Newman, Robert Dupuy, David Newman
"The development of a multiple level underground mine is a complex task in which geology, engineering, ground control, and unit operations are integrated into a single mine design. The components are
Jan 1, 2019
-
Estimation Of Weight Ratios Given Component Make-Up Analyses Of Streams ? IntroductionBy Richard Klimpel
A common problem in mineral processing and chemical engineering is the need to estimate flow rates and/or weight ratios involved with engineering operations for which it is inherently difficult to dir
Jan 1, 1979
-
Subsidence Parameters-Their Definitions And DeterminationBy S. S. Peng
In this paper, the precise definitions for a number of commonly used subsidence parameters are given. The subsidence parameters have been determined using an integrated approach for 110 subsidence cas
Jan 1, 1995
-
Use Of Rubber-Lined Balling Drums In The Pelletizing Plant At Hoogovens Ijmuiden ? SummaryBy Dolf Vos
The balling section of the pelletizing plant at Hoogovens IJmuiden consists of 7 balling drums. Each with an average capacity of 100 tons of green pellets per hour. The balling drums are equipped wi
Jan 1, 1983
-
Optimizing Face Ventilation And Shearer Water Consumption To Reduce Longwall Dust LevelsBy Robert A. Jankowski, John J. McClelland, Charles Babbitt
The purpose of this study was to develop guidelines to enable mine operators to maximize longwall dust reductions, while optimizing the use of ventilating air and shearer water consumption. A recent i
Jan 1, 1987
-
Study on the Tribocharging Properties of CaCO3 particles in a Cyclone Tribocharger - Mining, Metallurgy & Exploration (2023)By Yang Song, Li Shaokang, Wang Zhiqiang, Wang Jinjun, Li Guofeng, Su Meixuan
CaCO3, as a component widely existing in natural minerals, is a common impurity. In recent years, triboelectric separation has been applied to the separation of minerals containing CaCO3. However, the
Jun 3, 2023
-
Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.By V. Galla
Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding
Jan 1, 2011
-
The Ty-Hukki ClassifierBy J. LeRoy Peterson
This paper presents some of the theoretical aspects as well as some results of actual plant operation of the Ty-Hukki Classifier. Dual classification steps within a unit vessel are achieved by control
Jan 1, 1966
-
Study of Longwall Powered Support Pressures Under Static and Dynamic ConditionsBy Someswar Kesh, Gavin J. Faulkner
Introduction Powered supports in longwall mines essentially operate under two conditions: 1. Static (non-working) 2. Dynamic (working) There is a variety of static conditions which may ex
Jan 1, 1986
-
Problem of Tunnel Construction in Himalayan Region: An Actual EncounterBy M. D. Khattar
Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr
Jan 1, 1999
-
An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern OntarioBy Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey
Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter
Jan 1, 2007