Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sensor Developments In The Determination Of Alumina To Caustic RatioBy J. Wright
Since the 1960’s toroidal conductivity has been used to determine the Alumina to Caustic ratio of the digester discharge liquor stream. In recent years the application of ceramic materials have allowe
Jan 1, 2001
-
Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022By Greg Colzani, Emily Thompson
The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma
Dec 1, 2022
-
Design of the Otjikoto Gold Mill, NamibiaBy John Rajala
The Otjikoto Gold Mill was commissioned during November–December 2014 as Namibia’s first new gold producer in 30 years. Its operations consist of surface mining with a modern gravity/carbon-in-pulp mi
-
Use of Numerical Modelling and GIS to Analyse and Share the Risks Related to Urban Tunnelling - Greater Paris - Red Line – South SectionBy Fatima-Zahra Houmymid, Elena Chiriotti, Mahdi, Samy
"The Greater Paris projects involves the creation of a 200km extension of the actual public transport network on the close outskirt of Paris. In 2011, SYSTRA has been awarded the Engineering studies o
Jan 1, 2016
-
New Techniques In Beneficiation Of Florida Phosphates Of The Future - Part II - Mining And Matrix Transportation - Abstract of Part I, The General Geology of the Florida Phosphates -An Introduction of Future Reserves.By George F. McKeregahan
Phosphate production of the Central Florida Phosphate District has been predominantly from the unique and lucrative Bone Valley Formation, with local and minor amounts coming from the underlying Hawth
Jan 1, 1983
-
Early Experiences of Microseismic Monitoring in Kittilä Mine - RASIM22By Stephen Meyer, Véronique Falmagne, Antti Pyy
Kittilä Mine is a gold mine located in Northern Finland, owned and operated by Agnico Eagle Finland. The mining operation started in 2008 with open pits which were completed in 2012 and production mov
Apr 26, 2022
-
Surface Tension Of Flotation Solution And Its Influence On The Selectivity Of The Separation Between Apatite And Gangue MineralsBy M. Martins
This work presents and discusses the influence of the surface tension (gLV) of methanol/water mixtures on the flotation response of apatite versus gangue minerals conditioned with flotation reagents (
Jan 1, 2009
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
Reducing Employee Exposures To Diesel And Blasting ContaminantsBy Kevin R. Burns, William A. Depree, John J. Jansky
This paper presents some of the work associated with the reduction of employee exposure to diesel and blasting contaminants at an underground salt mine. The purpose of the paper is to outline the proc
Jan 1, 1987
-
Rocks and Minerals in The Regolith of The Moon: Resources for a Lunar BaseBy Lawrence A. Taylor
The rocks and minerals of the moon will be included among the raw materials used to construct a lunar base. The lunar regolith, the fragmental material present on the surface of the Moon, is composed
Jan 1, 1990
-
System Of Models For Planning And Management In The Coal Industry Of The USSRBy L. M. Klimov
In recent gears in the coal industry a great deal of attention is attached to the questions of elaborating and introducing the problems of planning and management and, first of all, in the sphere of m
Jan 1, 1979
-
Design And Start Up Of The Cortez Gold Mines Pipeline MillBy R. N. Powell
The Pipeline ore body was discovered in March 1991. The construction of the new mine and mill did not start until early March of 1996. Upon completion of permitting and corporate project approval, the
Jan 1, 1999
-
36. History of Discovery and Development of the Endako Molybdenum DepositBy Donald C. Rotherham
The Endako, British Columbia, deposit was initially discovered in 1927 by two local men, Charles H. Foote and Alf Lagdon, who were at that time on a hunting expedition. Four mineral claims were locate
Jan 1, 1991
-
How can the past cease to be a burden for the future sustainable development?By A. Shtiza
This literature review discusses the role of the Albanian institutions, the natural resources industry, potential investors and stakeholders in order to provide a set of indicators that can help to mo
Jan 1, 2011
-
The Calculation Of Recirculating Ventilation Requirements For The Dilution Of Methane In Working DistrictsBy Richard Kolada
If the emission of methane into any particular area of an underground coal mine remains constant, then the calculation of ventilation requirements is relatively simple. This is also true if the ventil
Jan 1, 1987
-
The Application Of The Continuous Falcon Centrifugal Gravity Concentrator For Gold And Pyrite RecoveryBy A. Goulsbra, S. McAllister, R. Dunne
Since 1992, a tailings gravity re-treatment plant has been in operation at the New Celebration Gold Mine to recover auriferous pyrite (Martins, Dunne and Gelfi 1991; Martins, Dunne and Delahey 1993).
Jan 1, 1998
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Maintenance Control ? A Four Level Approach - Who's Right?By Mark L. Munsell
In recent years, miners have tried many approaches to maintenance such as: - Highly sophisticated computerized programs. - large planning groups designed to preplan and schedule work. - Contract
Jan 1, 1976
-
The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control ProjectBy Jean Habimana
Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc
-
The Design and Construction of the Excavation for the Underground Works at the Rocky Mountain Pumped Storage ProjectBy C. M. Lundell, F. S. Kendorski, R. D. Prager
The criteria for the design of the shaft/tunnel system excavation at the Rocky Mountain Project was to provide a stable opening during and after construction to receive the concrete lining and to mini
Jan 1, 1986