Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Warwick ? A Unique Approach To Steam Coal PreparationBy John C. Draper
[Duquesne Light Company's three power plants in western Pennsylvania are now receiving high BTU clean coal from a new coal preparation plant. When burning coal from this plant, particulate emissi
Jan 1, 1976
-
Comminution In Brittle Solids Resulting From Hypervelocity Impacts ? Hypervelocity ImpactBy Thomas P. Meloy
Comminution is an old art. Unfortunately the analysis of the unit operations has been handicapped by the lack of both theoretical and experimental information. Two types of infor¬mation are needed, on
Jan 1, 1965
-
Current Ground Support Membrane Applications In North American Underground MinesBy L. Lacerda
Spray-on ground support membranes (GSM) or thin support liners hold today perhaps as much potential to impact underground (u/g) ground support operations as dry and later wet-mix shotcrete when introd
Jan 1, 2002
-
Gathering Arm LoadersBy Bruce D. McCellan
INTRODUCTION The gathering arm loader was patented by Joseph Joy in 1916. This unique machine motion became the standard of the industry and is used on underground loaders and continuous miners thr
Jan 1, 1982
-
Mining industry wins one Interior Department ruling rejects “independent mine requirement” conceptBy R. Timothy McCrum
It is not often that the Interior Department's Bureau of Land Management, Office of the Solicitor, and Interior Board of Land Appeals (IBLA) jointly act to do the mining industry a good turn. Tha
Jan 8, 1987
-
Risk Sharing Principles in Tunnel ContractsBy Eivind Grøv
"INTRODUCTION Tunneling and underground excavation is related to handling of uncertainties, risks associated with geological conditions are significant and ‘unexpected geological conditions’ often cla
Jan 1, 2016
-
Radon Emanometry In Uranium Exploration (9f1a26f3-0c3b-4b1e-b1a8-9eea40c5bcbe)By W. T. Caneer
Uranium may be in short supply due to the predicted energy needs in the coming years. As a result of this a new surge of uranium exploration is underway. The refinement of numerous exploration techniq
Jan 1, 1974
-
An Omnivorous Process For Laterite DepositsBy Gordon R. Wicker, Willem P. C. Duyvesteyn, Robert E. Doane
A versatile acid leach process has been developed which is applicable to a broad range of oxide nickel ores. Inherent in this process are high recoveries of nickel and cobalt, as well as a relatively
Jan 1, 1979
-
An Evaluation Model Of Landforms Visual ValueBy A. Tsouchlaraki
The physical relief is a variable of utmost significance in the course of the analysis, evaluation, design and management of the visual environment. In this sense, there are cases where it would be de
Jan 1, 2005
-
Optimization Of Hydraulic Haulage Systems In Underground Coal MinesBy Hasan Sevim
This paper summarizes recent developments in modeling of underground coal slurry haulage networks for determination of optimum design and operating parameters. The model presented here is based on a s
Jan 1, 1983
-
Passive-Treatment of Acid Rock Drainage: What is the Potential Bottom Line?By James J. Gusek
Passive-treatment systems that mitigate acid-rock drainage (ARD) from coal mines have operating since the mid-1980s. Large systems at metal mines are being contemplated. A 95L/sec (1500-gpm) capacity
Jan 1, 1995
-
Using Reserves For Equity ValuationBy Adam Graf
Mineral deposits are fundamentally different from most other assets -Every deposit has unique geologic and metallurgical characteristics -Asset (resource) is finite and cannot be truly replaced. -L
Jan 1, 2003
-
Coping With High Lateral Stresses In An Underground Illinois Coal MineBy C. Tom Blevins
LADIES AND GENTLEMEN : This presentation is to discuss production and roof control problems associated with directional lateral stresses in an in situ stress field and the approach that Inland Ste
Jan 1, 1982
-
TECHNOLOGY NEWS – Tackling India’s Coal Ash ProblemBy Gary Brendel
India produces about 70 Mt/a (77million stpy) of coal ash (fly ash and bottom ash) from burning about 200 Mt/a (220 million stpy) of coal for electric power generation. The average ash content is 35%.
Jan 1, 1999
-
Top Coal Movement Law of Dynamic Group Caving Method in LTCC with an Inclined Seam "Mining, Metallurgy & Exploration (2020)"By Weijie Wei, Jinwang Zhang, Shengli Yang
Due to the unbalanced top coal drawing process, the recovery ratio is low, and the equipment stability is poor in the longwall top coal caving mining (LTCC) with an inclined seam. Aimed at these probl
Jul 7, 2020
-
Coal FlotationBy Frank F. Aplan, G. Rinelli
INTRODUCTION Coal is a solid, combustible mineral substance resulting from the degradation and alteration of vegetable matter largely in the absence of air. In this natural process of coalification,
Jan 1, 1976
-
[Sulfur Reduction On Minus 28 Mesh Bituminous Coal ? Introduction]By F. G. Miller
It is generally accepted that sulfur exists in coal in three forms: (1) pyritic, (2) organic, and (3) sulfate sulfur. Sulfate sulfur usually makes up less than 1% of the total sulfur content. Pyritic
Jan 1, 1963
-
Bacterial Gasification As An Alternative To Methane Drainage And Subsequent Extraction Of CoalBy A. Gupta, S. C. Srivastava, K. K. Saroj
Bacterial degasification of methane and conventional methane drainage for generation of power have become accepted practice. Comparative economies of both the techniques have been described. Authors h
Jan 1, 1993
-
Evaluating seismic potential by energy balance calculations in a deep longwall mine - RASIM2022By M. Sears, W. H. Su, J. Wickline, M. A. Van Dyke, G. Esterhuizen, Z. Khademian
It is commonly recognized that seismicity can be induced by rock failures or slip along geologic structures around mining excavations. The unpredictable nature of these events and their proximity to t
Apr 26, 2022
-
Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBMBy Martin Herrenknecht
After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between