Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Victoria Station Upgrade - Protection of Sensitive Structures during TunnellingBy Robert Essler, Paul Marsden, Paul Pandrea
"1. THE VICTORIA STATION TRANSPORT HUB Victoria Underground station is part of the Victoria transport hub, which comprises one of London’s main train termini and a major bus station. At the Undergroun
Jan 1, 2016
-
Slope Stability Program Of Kennecott Copper Corporation ? IntroductionBy Carl D. Broadbent
The goal of slope mechanics is to achieve efficient and safe pit slopes. In the case of ultimate mine slopes the objective is to minimize the stripping ratio by steepening the slopes to their maximum
Jan 1, 1968
-
Flake Graphite And Zeolite Research Provides Potential Solutions To Domestic ProblemsBy L. J. Nicks
The current U.S. Bureau of Mines research program is addressing the recovery of flake graphite from kish, a steelmaking waste product, and the use of zeolites from abundant domestic natural deposits f
Jan 1, 1995
-
Multiple Seam MiningBy Matthew Spedding
The complex nature of the carboniferous measures prevailing in the U.K. has dictated the types of mining required to exploit the coal seams. Most mines in Britain are referred to as deep mines in
Jan 1, 1977
-
Industrial Uses Of Lamproite From Silver City Dome, Woodson And Wilson Counties, KansasBy Pieter Berendsen
Lamproite occurs in two locations in southeastern Kansas that are in close proximity to each other. In both locations, the lamproite is restricted to north- east-elongated, ellipsoidal depressions mea
Jan 1, 1999
-
Heat and Moisture Transfer within Advancing Longwall Coalface Goafs and the Effect on Face Climatic ConditionsBy I. Longson
As a longwall coalface advances a caved goaf or waste region is left behind. Air flow takes place through this permeable goaf due to the pressure differentials existing across it and en route this lea
Jan 1, 1989
-
Evaluation Of Reclamation Practices With Respect To Subsoil CompactionBy R. J. Sweigard
One of the foremost problems in reclaiming prime farmland is compaction of the subsoil which is caused by the reclamation equipment. Wheel tractor-scrapers are most commonly used to replace subsoil an
Jan 1, 1987
-
Reactions Of Calcium And Magnesium Compounds With Pulverized Coal Fly AshBy L. John Minnick
A revised and expanded edition of a previous paper** dealing with reactions of calcium and magnesium oxides and hydroxides with pulverized coal fly ash is presented. Lime-fly ash specimens were cured
Jan 1, 1968
-
Expected Thermal and Hydrothermal Environments for Waste Emplacement Holes Based on G-Tunnel Heater ExperimentsBy Mark L. Blanford, Roger M. Zimmerman
INTRODUCTION Volcanic tuffs on and adjacent to the Nevada Test Site (NTS) are being considered by the Department of Energy (DOE) for the possible geo- logic disposal of high-level radioactive wast
Jan 1, 1986
-
Flotation Reagents (e8d9ee18-10f7-4366-8c9d-5cc394000252)By R. Herrera-Urbina, D. W. Fuerstenau
A large number and a wide variety of chemical reagents are used in flotation processes for wettability and Eh control, particle agglomeration/dispersion and bubble stability. A historical account of t
Jan 1, 1989
-
Concentration of Rare Earth Minerals from Coal by Froth FlotationBy J. Groppo, W. Zhang, R. Honaker
"Rare earth elements (REEs) found in coal are in the form of minerals, ion-substitution with clays and organically bound. Rare earth minerals (REMs) such as monazite exist in coal and have a grain siz
Jan 1, 2017
-
Ground Support Systems for Heavy, Squeezing Ground at Burgin MineBy Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg
INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130
Jan 1, 1982
-
Testing Autoclave Lining Materials At GoldstrikeBy C. E. Semler
A multiyear program involving online, in-vessel exposures at Barrick Goldstrike Mines Inc. (BGMI) has provided information and experience about the materials and designs for brickwork linings in press
Jan 1, 1997
-
Mobile Mechanical Vein Miner; New Machine Developed for Lucky Friday MineBy Mikael Ramström, Mark Board, Clayr Alexander, Wes Johnson
"The Coeur d’Alene mining district in northern Idaho was first discovered more than 130 years ago and has been the most prolific silver producer in the United States. The Lucky Friday Mine of Hecla Mi
Jan 12, 2017
-
An open-pit production scheduler : algorithm and implementationBy M. E. Gershon
An approach for scheduling the mining of ore and waste blocks in a surface mine is presented. While mathematical programming approaches have been developed to solve this problem optimally, they are di
Jan 1, 1988
-
HPGR-The Australian ExperienceBy D. Maxton
INTRODUCTION This paper traces the application of High Pressure Grinding Rolls (HPGR) at industrial and pilot scale in Australia. The Argyle Diamond Mine installed the first of two smooth segmented
Jan 1, 2004
-
Production of Low Ash Coal by High Efficiency Coal PreparationBy D. W. Horsfall
The washability of South African coals is described and the problems encountered in washing at low densities, to make premium products, are enumerated. The measures taken to overcome those problems, w
Jan 1, 1995
-
Electronic Detonators—Safety Aspects For Mine Blasting OperationsBy Harry Verakis
Electronic detonator systems are an advance in technology beyond conventional electric detonators for initiating explosives and blasting agents. Their use is widening into the mining operations of th
Jan 1, 2005
-
Agglomeration And Materials Handling At The Cactus Gold Mine Kern County, CaliforniaBy J. J. Antony
The Cactus Gold Mine is a joint venture comprised of Middle Buttes Partners Ltd. (CoCa Mines, Inc.--operator, T. Congdon and W. Carey) and Compass Mining, Inc. The project includes 2.4 sq. miles of co
Jan 1, 1988
-
An Approach To Computerized Open-Pit Production SchedulingBy William L. Rose
Production scheduling is an integral part of intermediate- and long-range open-pit mine planning, affecting equipment selection, manpower requirements and project economics. The development of mining
Jan 1, 1985