Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021By Jürg Künzle
The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m
Jun 13, 2021
-
Beneficiation Of Brazilian Diatomite For Filtration Application IndustryBy S. C. A. Franca, M. T. Millqvist, A. B. Luz
Laboratory experiments were performed on a Brazilian diatomite from Bahia State to produce an industrial product for use as a filter aid. Bench and pilot plant tests were conducted consisting of: diat
Jan 1, 2002
-
Geopolymer-Based Concrete To Reduce Carbon Foot-Print Of Construction IndustryBy H. Akbari
The ordinary Portland cement (OPC) is the key pozzalonic component of the concrete mix, widely used as the construction material world-wide. Billions of tons of OPC are used in the construction indust
Feb 27, 2013
-
Industrial Waste Disposal By Deep Well InjectionBy A. C. Barlow
The use of deep wells for waste disposal is not a new technique. The production phase of the oil industry has been using this method to dispose of unwanted oil field brine since the 1930's The a
Jan 1, 1964
-
Heap Leaching As A Unit ProcessBy Harry R. Dahlberg
Heap leaching is discussed as a unit process. Five factors are identified as the principal elements that can be measured and/or controlled. These are: 1. Material Size 2. Volume of solution 3. Tonnage
Jan 1, 1979
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Isolation and Characterization of a Bioflocculant from Bacillus Megaterium for Turbidity and Arsenic RemovalBy K. A. Natarajan, K. Karthiga Devi
"A biodegradable flocculant was produced during growth of Bacillus megaterium. The major component of the bioflocculant was found to be a polysaccharide composed of some proteins. Fourier transform in
Jan 1, 2015
-
A New Approach To Copper-Nickel Ore Processing ? SummaryBy A. W. Fletcher
A nickel-copper sulphide concentrate was treated in a pilot plant at Warren Spring Laboratory during 1961, by a hydrometallurgical roast-leach- solvent extraction process devised to cleanly separate t
Jan 1, 1964
-
Design And Construction Options For Surface Uranium Tailings ImpoundmentsBy A. MacG. Robertson
INTRODUCTION The tailings, or solid waste, remaining after uranium has been extracted from an ore and the liquid wastes associated with it contain both radioactive and other substances which, if re
Jan 1, 1980
-
Known Interactions Of Tectonics And Ore Deposits In The Context Of New Global TectonicsBy John M. Gullbert
It is the task of this portion of today's session on the new meaning of regional tectonics in the search for ore districts to discuss known interactions of tectonics and ore deposition in the &ap
Jan 1, 1971
-
Compressed Air Injection Into A Sulfide Leach DumpBy Robert P. Moodry
It was attempted to revitalize an old sulfide leach dump by increasing the oxygen content within the dump. Compressed air was introduced into the old dump. This was accomplished by drilling 300 foot a
Jan 1, 1976
-
An Approach To Preparing Reclamation Permit ApplicationsBy K. W. Grubaugh
The recently enacted federal surface mine law (P.L. 95-87) will increase further the complexity of securing a reclamation permit. This law intensifies the need to present the required reclamation plan
Jan 1, 1978
-
Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2By William H. Hansmire
The Modified Detroit River Outfall No. 2 (MOD DRO-2) will discharge treated wastewater to the Detroit River. Construction of a 6.4-m-diameter, 1.9-km-long tunnel was halted in 2003 by flooding during
-
Engineering The Health, Safety And Comfort Of Dump Truck OperatorsBy N. Aouad
Dump truck operators are exposed to whole-body vibration (WBV) levels that exceed the International Standard Organization (ISO) 2631-1. The WBV level measured by RMS acceleration value, for operator c
Feb 27, 2013
-
Porphyry Copper Mineralization At The Tapadaa Prospect, Northern Sulawesi, Indonesia ? IntroductionBy Garry G. Lowder
The regional geologic setting is essentially a volcanic island arc built upon an oceanic basement, consisting of basalt and minor pelagic sediments (the Tinombo Formation of Eocene - lower Miocene age
Jan 1, 1976
-
Processing Technology For The Recovery Of Fossil Resin, A Value Added Product, From Western CoalsBy J. D. Miller
The fossil resins of certain western coals are of significance and of sufficient value as a chemical commodity to justify a fossil resin industry. At the present time these valuable fossil resin resou
Jan 1, 1994
-
Ontario: Significant producer of a wide range of industrial mineralsBy D. W. Scott, D. G. Minnes
Introduction Ontario's diverse industrial mineral resource base includes structural minerals such as sand and gravel, crushed stone, building stone, clay, shale, limestone, and dolostone. These
Jan 12, 1987
-
New Approach In The Design Of First Lining Steel RibsBy Carla L. Zenti
In recent years, considerable advances have taken place worldwide in the design and construction of first tunnel linings. With these advances, there is a tendency to move away from traditional support
Jan 1, 2012
-
Ground Water Quality Protection In Situ Uranium MinesBy William R. Taylor
The information I have concerning the early in situ uranium mining activities in Texas is "sketchy." Apparently, the first test was conducted between 1967 and 1971 in Gonzales County, north of Yorktow
Jan 1, 1979
-
Managing Geologic Uncertainty in Pit Shell Optimization Usinga Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin