Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of liquid phase tracers in material balance calculationsBy A. J. Neale, B. C. Flintoff
A relatively inexpensive and reliable method of using liquid phase tracers to aid in the solution of material balance problems is introduced. The method is of value in situations where one is required
Jan 1, 1987
-
Ongoing Evolution Of Advanced Sag Mill Control At Ok Tedi (1b22defb-25db-49c9-a7be-e88024c3b1a4)By J. W. Craven, M. Katom, K. M. McCaffery
At Ok Tedi, ore type and SAG feed size distribution vary widely and frequently. This makes control of the SAG mills by application of the power/pressure relationship difficult. Power logic has traditi
Jan 1, 2001
-
Conceptualization Of Ground-Water Flow Systems And The Design Of Monitoring ProgramsBy W. K. Summers
During the past few years monitoring systems have been installed to measure the effects of environmental changes on the ground-water resource. The design of a monitoring system depends upon the design
Jan 1, 1985
-
Longwall Mining, Shale Gas Production, and Underground Miner Safety and HealthThis paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac
Jan 7, 2020
-
Replacing The Stone and Rebuilding the PentagonBy Jim Owens
The methodology of quarrying changed significantly in the Indiana limestone industry in the 60 years between Sept. 11, 1941 and Sept. 11, 2001. The former was the date of the Pentagon groundbreaking
Jan 1, 2005
-
Alternative Delivery and Trenchless Methods Used to Install 60,000 LF of Pipe on the Bay Park Force Main Project - NAT2024By Jeff LeBlanc, George Gutierrez, Carl Pitzer
The Bay Park Conveyance Project was one of the largest microtunneling and rehab projects in the United States at the time of completion. The completed project conveys treated water from the South Shor
Jun 23, 2024
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay MudBy D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997
-
Technology News – Caterpillar to Produce Electric Drive Mining TrucksCaterpillar said it will produce a Cat line of ac electric drive mining trucks. The world’s largest manufacturer of mining and construction equipment said the addition of an AC electric drive truck l
Jan 1, 2006
-
How Safe Are Your Recent Mills? The Compatibility Between FEA And Welding CodesBy V. Svalbonas, M. Fresko
The present versions of the Welding Codes, such as BS7608, have long been known to be compatible with hand computations of membrane and bending stress, rather than detailed finite element solutions.
Jan 1, 2002
-
Technical Note – Development in gold leaching using hydrogen peroxideBy H. Knorre, A. Griffiths, J. Loroesch
Introduction Hydrogen peroxide is known to the mining industry as a powerful oxidant, able to attack and to destroy cyanide, the most important leaching reagent (Knorre and Griffiths, 1984; Griffiths
Jan 1, 1989
-
Influence of Continuous Mining Arrangements on Respirable Dust ExposuresBy W. R. Reed, D. E. Pollock, T. W. Beck, J. A. Organiscak, J. D. Potts
"In underground continuous mining operations, ventilation, water sprays, and machine-mounted flooded bed scrubbers are the primary means of controlling respirable dust exposures at the working face. C
Jan 1, 2015
-
Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine DrainageBy M. Nehdi
Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati
Jan 1, 2008
-
Grouting For Groundwater Control Milwaukee Inline ProjectBy Edwin F. Shorey, Richard F. Coon, Steven B. Fradkin
Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial
Jan 1, 1987
-
Risk Management of Long and Deep Tunnels—The European ExperienceBy Yves Boissonnas, Marco Bettelini
"INTRODUCTION AND OBJECTIVES The operational safety of long and very long rail tunnels represents a key issue in all development stages, including design, construction, commissioning and operation. Th
Jan 1, 2016
-
Requirements And Quality Parameters Of Fluxed Iron Ore Pellets Used In The Federal Republic Of GermanyBy H. A. Kortmann
Blast furnace operators have been steadily increasing their quality requirements on burden material. These requirements include a high reduction rate of the ore burden as well as good strength at the
Jan 1, 1989
-
Squeezing Ground: Conditions & Lessons Learned at the New Irvington TunnelBy Yiming Sun, David Tsztoo, Rick Nolting, Adam M. Wirthlin, Rebecca Fusee
"Excavation and initial support of the New Irvington Tunnel presented significant challenges, including rapidly changing ground conditions, heavy ground loads, and squeezing. Such behaviors were antic
Jan 1, 2016
-
Ground Freezing Under the Most Adverse Conditions: Moving GroundwaterBy Paul C. Schmall, Lucian P. Spiteri, Arthur B. Corwin
Moving groundwater is generally recognized as the most adversarial condition for ground freezing. Moving groundwater can occur due to natural or man-induced groundwater flow, but either way may result
Jan 1, 2007
-
The North American Tunnel Method—Lessons LearnedBy Don Phelps, John Hawley, David P. Field
In recent years observational techniques of tunneling have become increasingly popular methods to facilitate complex underground infrastructure projects. The traditional design and construction manage
Jan 1, 2005
-
Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMSBy Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13
Jan 1, 2007
-
Rock Mass Characteristics of the Rocky Mountain Pumped Storage Project Hydroelectric Tunnel and ShaftBy G. S. Grainger, R. A. Cummings, F. S. Kendorski, R. L. Butts
Georgia Power Company's Rocky Mountain Project, located approximately ten miles northwest of Rome, Georgia, in the Valley and Ridge Physiographic Province, is a pumped-storage facility rated at a
Jan 1, 1986