Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Flowsheet Description And Process Development Sept-Iles Concentrator

    By Benoit Gagnon

    Mining of the Schefferville iron deposits began in 1954 on completion of the 574 km railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment of these or

    Jan 1, 1980

  • SME
    Palabora - Changing To Meet The Challenge Of The 80's (d5b5051e-9d5f-4235-982c-36a6ba44fe75)

    By J. P. Gliddon

    Since 1980 a number of significant changes have been introduced at Palabora in an effort to off-set the effects of reduced product price and increased unit cost of inputs. These changes and improveme

    Jan 1, 1987

  • SME
    Use Of Groundwater Models For Evaluating Goal Ash Disposal Sites

    By R. J. Sweigard

    Many states are considering the need to establish or modify policy relating to the disposal of coal ash. One of the primary concerns is the impact of leachate from the ash disposal sites upon groundwa

    Jan 1, 1992

  • SME
    Management Of Ventilation During A Disaster

    By D. W. Mitchell

    Never increase, reduce, or remove ventilation without unquestionable, compelling reasons. This rule applies every day as well as when fighting fire, attempting to find survivors, or recovering the min

    Jan 1, 1993

  • SME
    Hydraulic Tailings Fill Improvements ?Butte?1969? ? The Problem

    By Harold F. Yde

    Hydraulic tailings fill in the Butte deep level mines was based upon studies made in 1958 by the Anaconda Company Mining Research Department, which published Bulletin No. 35, entitled "Hydraulic Stope

    Jan 1, 1969

  • SME
    Influence of Early Ring Closure of Center Drift on Main Tunnel Excavation Under High Overburden Conditions - NAT2024

    By Sadatoshi Ohmori, Simin Zhai, Devini Abeyawardena

    A road tunnel is planned to be constructed in soft, high overburden ground of around 600 m in Japan by using the center drift advancing method. The dodging effect and early ring closure of the center

    Jun 23, 2024

  • SME
    Maintaining The Proper Balance With Computer Aided Gear Train Design

    By John Carr

    The tremendous growth in grinding mill size and horsepower during the '70s demanded advancements in gear cutting technology and equipment for the '80s. Computers are used as an aid in the

    Jan 1, 1981

  • SME
    Technical Note: Optimizing Location Of Mining Facilities

    By Kenneth K. Humphreys

    Over the past four years, the Coal Research Bureau of West Virginia University has presented a number of papers on operations research in the coal industry before various AIME meetings and meetings of

    Jan 1, 1972

  • SME
    Analysis of Heat Loss Mechanisms for Mobile Tent-Type Refuge Alternatives

    By P. T. Bissert, L. Yan, M. D. Klein

    "Federal regulations require that refuge alternatives (RAs) are located within 305-m (1000-ft) of the working face and spaced at one-hour travel distances in the outby area in underground coal mines i

    Jan 1, 2016

  • SME
    When the going gets tough...the tough get going to Tucson

    By Chee Theng

    "Mining professionals are a resilient lot. Sure, copper prices are dismal, permitting processes seem interminable and the top mining companies are shedding jobs like a Shetland sheepdog sheds hair. Al

    Jan 1, 2015

  • SME
    Economical Ore Reserves Estimation For Underground Mines

    By Oscar Letelier Gonzalez

    The goal of mine planning is to determine "the best" strategy to exploit an ore deposit during its workable life. Such strategy must be consistent with the objectives of the company and must be subjec

    Jan 1, 1979

  • SME
    Effect of Machine and Operational Parameters on Utilization Factor -NAT2022

    By Omid Frough, Hossein Changani

    Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a

    Dec 1, 2022

  • SME
    Pebble Lime From Preheater Kilns

    By J. L. Thompson

    Lime made in a coal-fired, rotary kiln has two distinct parts: the interior of the pebble which constitutes about 90% to 95% of the mass, and the surface dust layer which is the remaining 5% to 10%. U

    Jan 1, 1978

  • SME
    Practical Performance Requirements Of Coal Dryer Dust Collectors

    By Henning E. Soderberg

    Yesterday, air pollution was somebody else's problem -- today, it is everybody's problem. The coal industry with thermal coal drying, is aware of their problem and the necessity of doing an

    Jan 1, 1962

  • SME
    Electrical Analog Of The Continuous Blender ? Introduction

    By J. R. Hurley

    The continuous flow, horizontal drum blender has dynamic properties which may be described by the same type of equations which often arise in electrical filter analysis. Furthermore, the equations may

    Jan 1, 1967

  • SME
    Resoumetrics: A Mineral Resource And Environmental Estimation Tool - A Case Study (Copper) - Introduction

    By Barry Silverman

    As a significant mineral supplier, consumer of primary fuels, and producer of wastes and emissions to air, water, and land, the domestic copper industry through its investment and operating decisions

    Jan 1, 1979

  • SME
    Reactions Of Gold And Sulphide Minerals In Cyanide Media

    By P. Riveros, A. Pratt, G. Deschênes

    The effect of pyrite, pyrrhotite, chalcopyrite, realgar and arsenopyrite on gold dissolution in cyanide media was investigated. The cyanidation of synthetic gold ores, in the presence of various conc

    Jan 1, 2002

  • SME
    Development Of Chemical Caps In Acid Rock Drainage Environments

    By J. A. Chermak, D. D. Runnells

    Sulfide-bearing waste rock, ore and tailings have the potential for generating acid rock drainage (ARD) when exposed to an oxidizing environment. The possibility exists of utilizing the acid produced

    Jan 1, 1998

  • SME
    Factors Influencing TBM Performance in the Kielder Tunnels, UK.

    By Mary-Lee Athorn, David A. Barratt

    An opportunity to compare the performance of different tunnel boring machines (TBMs) operating in similar rock conditions occurred during the construction of a major water scheme in the UK. The pr

    Jan 1, 1986

  • SME
    Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions

    By Ergin Arioglu, Werner Burger

    "SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp

    Jan 1, 2016