Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Los Angeles Metro Gold Line Eastside Extension—Tunnel Construction Case HistoryBy Christophe Bragard, Brett Robinson
This paper reflects the challenges encountered during the construction of the light rail tunnels under Boyle Heights, in Los Angeles, California. Equipped with two state-of-the-art EPB TBMs, the c
Jan 1, 2007
-
Past And Future Trends In Phosphate Use (bc67086e-f222-405c-912f-9c8eb3012d83)By M. C. Roberts
In assessing the future markets for a mineral from a producing district, three key aspects must be considered: 1) the future growth in markets, 2) the competitiveness of the district in terms of produ
Jan 1, 1998
-
Real Time Section Management: A New Approach (193ca783-721c-447e-be42-a7d2f3f93c96)By J. W. Oberholzer
This paper describes research being undertaken by the Chamber of Mines Research Organization (COMRO) which is designed to assist the continuous miner operator and section foreman in the performance of
Jan 1, 1991
-
Managers And Maintenance Guidelines For Optimizing PerformanceBy Paul D. Tomlingson
The difficult and often harsh working environment of the mining industry can stress both personnel and equipment to the extreme. Often, the unintended consequences of this environment lead to confront
Jan 1, 2011
-
Pyrrhotite-Grinding Media Interaction And Its Effect On Floatability At Different Applied PotentialsBy Katerina Adam
During wet grinding the electrochemical interactions between grinding media and pyrrhotite not only accelerate the media wear but also adversely affect the flotation response of the sulfide mineral. A
Jan 1, 1984
-
Mine Subsidence Effects On A Pressurized Natural Gas Pipeline - I. IntroductionBy V. J. Hucka
A 0.5 m (20 in) diameter high pressure natural gas pipeline crosses over a coal mine located in Central Utah. Ground movement induced by the mining operation could possibly place excessive strain on t
Jan 1, 1983
-
Excess Spoil Minimization And Fill StabilityBy M. Superfesky, P. Michael
Introduction The US Office of Surface Mining (OSM) is proposing changes to the Code of Federal Regulations in the interest of minimizing the adverse effects of excess-spoil-fill construction on the
Jan 1, 2007
-
Optimized Extreme Learning Machine by an Improved Harris Hawks Optimization Algorithm for Mine Fire Flame Recognition - Mining, Metallurgy & Exploration (2023)By Jian Wang, Kun Li, Hao Wu, Juan Nan
In this paper, in order to solve the problems of low accuracy and slow speed of fire flame recognition, an extreme learning machine (ELM) method based on improved Harris hawks optimization (IHHO) is p
Jan 17, 2023
-
Ventilation Improvement in Longwall Recovery Face Using Convergence Transducers - Case StudyBy A. Habibi
The FMC Westvaco Trona Mine is located near Green River, Wyoming and has an annual production of 4.5M tons. Trona is an evaporite mineral that is processed into several products, mostly soda ash. The
Feb 23, 2014
-
Evaluation Of Mine Ventilation In Large-opening Underground Stone Mines - SME Annual Meeting 2023By V. Gangrade, J. Addis, S. Vanderslice
Researchers at the National Institute for Occupational Safety and Health (NIOSH) are conducting research to improve the ventilation of large-opening underground stone mines. The mine ventilation in th
Feb 1, 2023
-
EPRI Coal Handleability Project: Handleability Index ValidationBy B. J. Arnold
During the past three years, coal samples covering a range of coal rank, ash content, size consist, grindability, and moisture content have been tested for their flow properties using a triaxial shear
Jan 1, 1992
-
Population, Energy, Selected Mineral Raw Materials, And Personnel Demands, 2000 A. D.By Paul Dean Proctor
The world's population by 2000 A. D. may approximate 6.5 billion and the United States' 304 million. South Asian population increases between 1970 and 2000 A. D. will be triple the projected
Jan 1, 1971
-
Storage, Shipping And Handling Of Midrex® Iron - 1. IntroductionBy Wolfgang Pietsch
DR iron') is a generic term for metallized product that results from the direct or solid state reduction of iron ore. In direct reduction, iron oxides are reduced to metallic iron in the solid s
Jan 1, 1976
-
Transactions Volume 328 2010 - SME Transactions 2010By Emily Wortman-Wunder
As the 2010 president of the Society for Mining, Metallurgy, and Exploration, Inc., I am pleased to present the 2010 issue of Transactions of the Society for Mining, Metallurgy, and Exploration, Vol.
Jan 1, 2010
-
Characteristics of Drawing Body Shape in LTCC: Theoretical Model and Experimental ValidationBy Weijie Wei, Jinwang Zhang, Jiachen Wang, Yang Li
"Longwall top-coal caving (LTCC) mining technique is one of the important methods for underground thick seam extraction in China. The coal seam in LTCC panel is divided into two parts: bottom-coal and
Jan 1, 2019
-
EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow ConditionsBy Matthew Geary, Stephen J. Marino, Jordan A. Schreiner
"INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo
Jan 1, 2016
-
Use of Satellite Radar Interferometry (InSAR) to Monitor Urban Tunneling Projects – Real Case ApplicationsBy Loic Galisson
"Urban tunneling projects are usually extensively monitored. Most of the instruments used rely on benchmarks providing a sustainable datum throughout the life of the project. The monitoring program al
Jan 1, 2016
-
Computational Fluid Dynamics Modeling Of Dust Capture by a Non-Clogging Screen System for a Flooded-Bed Dust ScrubberBy O. A. Velasquez, A. R. Kumar
"Dust generated on underground mechanized coal mining faces is a health and safety hazard. Continuous miners deployed underground usually have an integrated flooded-bed dust scrubber mounted onto the
Jan 1, 2018
-
Process Development Testing for Comminution Circuit Design"Metallurgical process development in greenfield projects must define the comminution flowsheet and establish the equipment sizes that are required to deliver the project design criteria. These are cr
Jan 1, 2016
-
Numerical Evaluation and Optimization of Grout Backfill Strategy for a Subsurface Gas TunnelBy Davar Abi-Zadeh, Cillian Brown, Deepak Kandra
"Grout backfill strategy for a particular subsurface concrete tunnel (~4.9km long, 3.5m in diameter, carrying 20” gas pipeline) was based on achieving 1:100 slope of the fill in order to progressively
Jan 1, 2016