Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improving On The Estimation Of Recoverable ReservesBy M. E. Rossi
Reconciliation of long-term block model reserves and mine production frequently shows significant discrepancies. This reconciliation can be done comparing the long-term block model reserves against a
Jan 1, 1998
-
Asarco Mineral Creek TunnelBy Shane Yanagisawa
The Mineral Creek Diversion Project is at the Asarco Ray Mine Complex, about128 km (80 miles) east of Phoenix, Arizona. The new tunnel will intercept the waters of Mineral Creek about 2,134 m (7,000 f
Jan 1, 2001
-
Effect Of Mill Operating Parameters On Mineral LiberationBy H. E. Rojas, G. T. Adel
The primary objective of most comminution operations is liberation; however, mill performance is generally quantified in terms of particle size. Only recently has the use of image analysis equipment m
Jan 1, 1992
-
Computer-aided earthmoving systemsBy D. Greene
The close integration of mine planning and mine operation continues to be the goal of mine operators. Depending upon the complexity, size and sophistication of the mine, limited success has been achie
Jan 1, 2000
-
Iron Encrustation Of Dewatering Wells: Causes And Remedies (ff649bed-7d35-439c-9cf3-16745cf83490)By J. R. Henke
Dewatering wells producing iron-rich water experience rapid declines in yield and drawdown due to the formation of ferric (Fe +) hydroxide deposits in well screen, pump intake and riser pipe. Precipit
Jan 1, 1989
-
Perspectives of Environmental Risk at the Equity Silver MineBy Mike L. Aziz, Keith D. Ferguson, Glenda Ferris
The Equity Silver mine has been a severe producer of Acid Rock Drainage (ARD) since 1982. The mine was closed in 1994 and a compacted clay cover installed, but ARD continues to be produced. Three perm
Jan 1, 2000
-
Water Control Measures, North Shore Inline Interceptor Phase Ia Tunnel Milwaukee Water Pollution Abatement ProgramBy Donald J. Olson, Thomas J. Lutzenberger, John Ramage
The North Shore Inline Interceptor, Phase IA tunnel is a 8,550-meter (28,000-ft) interceptor tunnel currently being constructed by Traylor Bros./Frontier-Kemper, Joint Venture, using a 9.8-meter (32-f
Jan 1, 1989
-
Impacts of Glacial Till Filled Valleys on Mining of the Upper Scioto West Interceptor Sewer, Columbus, OhioBy Charles H. Arnold, Timothy Fallara, David A. Day, Paul H. Marshall
The Upper Scioto West Interceptor Sewer (USWIS), Parts 1 and 2, consists of approximately 7,128 meters (23,385 ft) of 328 cm (129 in.) diameter tunnel. The project ex-tends from the City of Dublin to
Jan 1, 1997
-
Modified-Tree Graph Algorithms For Ultimate Pit Limit AnalysisBy P. Huttagosol
The use of computer models to design ultimate pit limits during feasibility study and long range mine planning is becoming a significant practice in open pit mining. One of the problems in determining
Jan 1, 1989
-
Tracking Progress Toward Sustainability: Linking The Power Of Measurement And StoryBy R. A. Hodge
Over the past decade, there has been a significant increase in effort put to tracking progress toward sustainability. Many aspects of society are participating in this “movement” including mining. The
Jan 1, 2004
-
Assay Laboratory Design and OperationBy Stephen H. Hall
INTRODUCTION At some point in the design and development stage of a mineral venture, the assay laboratory building, its interior layout, and major pieces of analytical equipment must be specified
Jan 1, 1986
-
Percussion-Drill JumbosBy Henry H. Roos
NTRODUCTION In the mining industry, a "drill jumbo" is a drilling unit equipped with one or more rock drills and mounted on a mechanical conveyance. Jumbos range from single¬drill ring drills mounted
Jan 1, 1982
-
Optimising The Ammonia-cyanide Leaching Process For Copper-gold OresBy David Muir, Slobodanka Vukcevic
Gold is commonly associated with copper minerals, particularly in the more geologically recent rocks of Northern Australia, Chile and the Pacific Rim. Traditionally, oxidised copper-gold ores are sel
Jan 1, 1995
-
Tailings Basin Reclamation Atlantic City Iron Mine, WyomingBy J. J. Gusek
An 81 hectare (200 acre) tailings impoundment at a taconite operation in Wyoming that ceased operations in 1983 has been a source of blowing dust. The site qualified for reclamation under Wyoming&apos
Jan 1, 1998
-
Pebble Crushing Practice At Cyprus Bagdad (189ef622-ccff-4645-a972-8a4fa683e0a8)The Bagdad mill, built in 1977, was de-signed for a mill capacity of 36,300 tpd. An ABC (Autogenous Mill-Ball Mill-Crusher) grinding circuit was chosen. The original mill contained three completely in
Jan 1, 1992
-
Mine SurveyingBy Charles G. Frush
The function of the mine surveyor is to (a) provide a network of points of accurately known position, covering the entire mine property, (b) obtain the required data for the preparation of useful maps
Jan 1, 1973
-
Techniques of Data CollectionBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
GENERAL STATEMENT Data frequently can be collected by several dif¬ferent methods. The method required for the nec¬essary precision for inflow prediction to mines should be selected and other methods
Jan 1, 1986
-
Geotechnical Investigation, Design And Construction Of The Km 80/86 Tunnels, Tumbler Ridge Branchline, B.C.By R. D. Hendry, R. A. Pearce, Allyn J. Steward, Dennis C. Martin
This paper outlines the geotechnical exploration and design approach utilized for the Km 80 and Km 86 Tunnels on the British Columbia Railway Tumbler Ridge Branchline. Information from surface mapping
Jan 1, 1985
-
Geocoat™ Biooxidation Demonstration At Ashanti Goldfields' Obuasi Operations, Ghana, West AfricaBy Richard M. Crowell, John W. Shield, Todd J. Harvey
Facing lower gold prices, gold mine operators throughout the world are seeking ways to reduce costs for treating refractory sulfide ores. Many gold mines, currently producing oxide ores, have underlyi
Jan 1, 1999
-
The Dissolution Of Copper Sulfides Under Reducing ConditionsBy C. A. Young, R. G. Robins, E. J. Dahlgren
The formation of copper thio-complexes in sulfide solutions has been recognized for many years and the measured solubilities of certain copper sulfide minerals attributed to these complexes. Attempts
Jan 1, 2001