Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Comparative Testing Of Water-Powered - And Pneumatic Jackleg Rock DrillsBy H. Ouellet, J. Paraszczak
The pneumatic jackleg drill remains a widely used tool in development and production drilling in many small-scale and narrow-vein underground mining operations in North America. Several drawbacks of t
Jan 1, 1995
-
Overview of Water Treatment TechnologiesBy Deepak Malhotra
INTORDUCTION Mining operations are unique In that they handle large volumes of water (millions of gallons) daily. The water contains dissolved metals, processing chemicals, organics, and other con
Jan 1, 1992
-
How Fine Can We Go?By Rob McIvor, Joe Keating, Gary Simmons
As more complex ores are processed, finer grinding becomes more necessary. A cross section of several industries will be presented with discussions not only of find grinding issues but also the classi
Jan 1, 1998
-
Microcomputer programs aid underground mine planningBy Betty L. Gibbs, Jean A. Arcamone
Introduction Microcomputers are becoming more convenient to use at all levels in the business world, including the mining industry. The state of the mining industry requires that we become more produ
Jan 3, 1988
-
Validating A Drilling Program With New Samples ? IntroductionBy Michel David
Once a mineralized body has been delineated, drilled and estimated from surface samples, it often happens that before the final go-no-go decision is taken, an underground sampling program is decided,
Jan 1, 1979
-
Asbestos Industry at the Crossroads : Current Position and OutlookBy Jean Dupéré
Introduction Before examining the current position of the asbestos industry and its market outlook, it is important to describe the product itself. If we are to understand the problems besetting th
Jan 7, 1984
-
Assessment of the Potential for Radioactive Pollution at a Phosphogypsum Waste Dump and Possibilities for Ra226 RemovalBy V. T. Vacariu, P. D. Georgescu, N. Tomus
To assess the potential for radioactive pollution unique to the environmental conditions of the Bacau phosphogypsum waste dump, surface samples were taken, drillings were performed on the entire waste
Jan 1, 1999
-
Optimization Of A Chemical Coal Cleaning Process Via Simple Genetic AlgorithmBy R. K. Mehta, K. N. Han, P. B. Queneau, V. Dieudonne
A study based on a statistically designed sets of experiments (central composite design) was conducted to determine the optimum conditions for leaching a subbituminous coal (7.0 % ash) from the middle
Jan 1, 1993
-
Scale Detection And Control During Mineral BeneficiationBy Brian K. Failon
Scale formation is a problem that affects many mineral processing systems because the processes require the use of large volumes of water. Scale composition may vary from circuit to circuit, but the s
Jan 1, 1986
-
US government’s stance on minerals issues draws heavy criticism at mining meetingsBy Steve Karl
President Reagan may be "a nice guy," but he is "misinformed, misdirected, and misadvised," when the subject is the state of the US copper industry, according to Sen. Dennis DeConcini (D-AZ). DeCon
Jan 1, 1986
-
Summary StatementsBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
Ground water inflow into a mine and the re¬sultant impact on district hydrology can be pre¬dicted on a site specific basis once the ground water flow systems at the site are sufficiently well under¬st
Jan 1, 1986
-
Geologic Investigation, Prediction And Construction Evaluation For The Cooling Water Tunnels - Seabrook, N.H., Nuclear Power StationBy M. Saidman, R. Pizzuti, R. Hirschfeld, A. J. Desai, J. Rand
Two bedrock tunnels, 170 to 250 feet deep and with a length of about 17,000 feet each, will be used to convey cooling water from the Atlantic Ocean to the Seabrook, N.H., Nuclear Power Plant. Seismic
Jan 1, 1976
-
Material Balance TechniquesFor processing plant design it is essential to develop a consistent material and (usually) energy balance as a basis for equipment sizing. This paper discusses techniques for consistent material balan
Jan 1, 1991
-
Improved Phosphate Flotation with Nonionic PolymersBy Ning Liu, Xuming Wang, Yongqiang Lu, Jan D. Miller
Bench-scale flotation experiments have been conducted to study the effect of nonionic polyethylene oxide (PEO) polymer surfactants on the flotation of Florida phosphate rock. It has been found that PE
Jan 1, 1999
-
The Application of Methods and Equipment for Grouting Saturated Fractured RockBy Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams
1.1 GENERALIZED METHODS OF SUPPRESSING THE INFLOW OF GROUND WATER DURING THE CONSTRUCTION OF SHAFTS, DRIFTS AND TUNNELS Various methods are used to prevent or minimize the inflow of ground water into
Jan 1, 1993
-
General poroelastic model for hydraulic fracturingBy L. Cui
X. Huang (1997) recently suggested a poroelastic model for simulating the hydraulic fracturing breakdown pressure. His paper began with a discussion questioning Haimson and Fairhurst's (H&F) mode
Jan 1, 1999
-
Clay Binders For Enhanced Potash Mineral Beneficiation Using Froth FlotationBy D. Tao
The presence of insoluble slimes in potash ore poses a serious processing problem to the potash industry. These insolubles must be removed prior to potash flotation because of their high adsorptive c
Jan 1, 2008
-
lnternational Aspects of MineralsTransportation: Iron Ore, Coal, and PhosphateBy Peter J. Szabo
Many mining engineers tend to think of the economic analysis of mining ventures and projects on an f.o.b. mine basis. This is especially true of mines that are operated in an established domestic mini
Jan 10, 1982
-
Site-Specific Environmental Parameters ? A Baseline For The Development Of Tailored Indicator Approaches For Metallic Raw Material FlowsIn order to analyze and quantify distinct environmental properties in the vicinity of sites, the Site-Specific Natural Resources Information System (SARIS) has been developed based on a Geographic Inf
Jan 1, 2003
-
Design and Construction of the New Tunnel at Genting Sempah, MalaysiaBy S. J. Porter, M. T. McRae
The new tunnel at Genting Sempah is part of a privately funded infrastructure projectthat involves duplicating the existing highway extending from the Gombok Toll Plaza near Kuala Lumpur to Karak, in
Jan 1, 1997