Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cyanide, Mining, RegulationsBy F. W. De Vries
A review as of the date of this meeting will cover the writer's perception of eachof the areas indicated in the charts. Changes in many are occurring with enough frequency that a detailed summary woul
Jan 1, 1998
-
Better Understanding Of Carbon And Resin AttritionBy David Martin Menne
Carbon or attrition can be expected to be affected by • Agitation power • Vessel volume • Carbon and Suspension densities • Kinematic viscosity of slurry • Carbon particle size • Impeller diameter • I
Jan 1, 1995
-
Transporting and Stacking of Ore for Heap Leaching: A General OverviewBy G. M. Bernard
This paper provides an overview of the various methods and techniques for transporting and stacking ore on heap leach pads. Towards this end, brief discussions of the various methods and techniques im
Jan 1, 1993
-
Comann Survey Shows Increased Compensation For Minerals ExecutivesBy R. Kent Comann
The sixth survey on the mining industry by Comann Associates provided data for entry-level and midlevel engineers as well as executive officers. Average 1989 compensation - base salary and anticipa
Jan 1, 1990
-
Site Characterization For Large BlastsBy D. D. Potter
ABSTRACT OF ORAL PRESENTATION Extraordinary conditions are often encountered when designing large blasts for in situ mining methods and spatial or innovation techniques are sometimes required. Some o
Jan 1, 1977
-
Domestic Petroleum Outlook And Its Impact On Industrial Mineral DevelopmentBy Thomas M. Garland
During the rest of this century, the United States faces no more complex or challenging problem than that of assuring availability of adequate, secure energy supplies in general, and crude oil and nat
Jan 1, 1978
-
Telfer Gold Mine: Sulphide Ore Treatment CircuitBy Dieter Englehardt
This paper describes the metallurgical evolution of a sulphide flotation plant. Beginning with the original plant, based on laboratory and pilot scale tests performed on initial drill hole composites,
Jan 1, 1990
-
Collectorless Flotation Of Coal With Two- Stage Addition Of Pine OilBy K. K. Bhattacharyya, S. Bhattacharya, S. Dey
Coal batch flotation tests were conducted both with and without collector and with one- and two-stage additions of frother. The recovery of combustibles and the flotation rate constant were found to b
Jan 1, 1998
-
Energy Conservation By Building UndergroundBy Thomas P. Bligh
Underground and earth covered construction offers a real and significant opportunity for saving energy, reducing building costs, and preserving valuable land resources. These methods lend themselves t
Jan 1, 1976
-
The Use Of Genetic Algorithms For Multiple Cut-Off Grade OptimisationBy E. Cetin
The authors describe the general problem of cut-off grade optimisation for multi-mineral deposits and outline the use of genetic algorithms for optimal cut-off grade schedules for deposits with up to
Jan 1, 2002
-
The Integrated Tank/heap Biooxidation ProcessBy Mike Schaffner, Pieter Van Aswegen
There are a significant number of refractory sulfide deposits that cannot be economically treated with conventional roasting, autoclaving, or tank biooxidation technologies. Echo Bay and Biomin have d
Jan 1, 2000
-
Operational Performance of Grinding Rolls at Cyprus Sierrita CorporationBy Loren G. Thompsen
The first high pressure grinding roll in a copper mine was commissioned at Cyprus Sierrita in July 1995. This grinding roll is the world's biggest operating unit. It has a roll diameter of 2.4 me
Jan 1, 1997
-
Geology of Big Chief Orebody, Mesquite DistrictBy G. F. Willis
Gold mineralization in the Mesquite district is hosted by a series of Jurassic amphibolite grade metamorphic rocks which have been intruded by a Cretaceous leucogranite pegmatite. A series of northwes
Jan 1, 1988
-
Comparison of numerical and analytical models of unsaturated flow around underground openingsBy R. Codell, D. L. Hughson
The authors benchmarked the integrated finite-volume code MULTIFLO against the analytical solution of Philip et al. (1989) for cylindrical underground openings. They found that the numerical simulatio
Jan 1, 2002
-
Topographic Reconstruction On Mining Sites: Landscape Stabilization And Erosion ControlBy T. J. Toy
The topography reconstructed following land disturbance is the foundation for all other reclamation practices. As the manufactured drainage basins, hillslopes, and stream channels approach a steady-st
Jan 1, 2002
-
Autogenous grinding at Hibbing Taconite Co.By J. V. Byrnark, R. W. von Bitter
The Hibbing Taconite Co. concentrator flowsheet, which is noted for its simplicity, uses single- stage autogenous grinding coupled with two stages of magnetic separation and two stages of size classif
Jan 1, 1987
-
Asphaltic Concrete Leach PadsBy A. C. Ruckman, Allen G. D., G. H. Beckwith
This paper describes the design and operational features of several asphaltic concrete gold heap leach pads which have been constructed in the United States over the past 12 years.
Jan 1, 1988
-
Determination Of The Optimum Lifetime Of A Mining Project Using Discounted Cash Flow And Option Pricing TechniquesBy B. Cavender
The operating lifetime, or production rate, selected for a mining project is among the most important factors influencing the project's design and ultimate economic success. Incorrectly-determine
Jan 1, 1993
-
Pressure Oxidation Pretreatment of Refractory GoldBy D. Robert Weir, Roman M. G. S. Berezowsky
Pressure oxidation of gold containing concentrates and ores is an effective pre- treatment for liberating refractory gold. This is particularly true when an appreciable portion of the gold is associat
Jan 1, 1984
-
Land Application Disposal OptionsBy R. Bruce Thorndycraft
The Land Application Disposal (LAD) system will be described, in its most typical adaptation. A bibliography of existing mines using LAD will be presented. Numerous variations of the concept have been
Jan 1, 1992