Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Evaluation Of Reclamation Practices With Respect To Subsoil CompactionBy R. J. Sweigard
One of the foremost problems in reclaiming prime farmland is compaction of the subsoil which is caused by the reclamation equipment. Wheel tractor-scrapers are most commonly used to replace subsoil an
Jan 1, 1987
-
The Efects of Rock Mass Strength and Joint Orientation on Pillar Stability in Underground Coal MinesBy S. M. Hossaini, M. Ataei, H. Moosavi
The abstract highlights the importance of pillar stability in underground coal mines and the influence of rock mass strength and joint orientation on pillar behavior. The study employs numerical model
Apr 4, 2022
-
Blast Hole Drill Recorder UtilizationBy T. E. Scartaccini
A drill recorder is a permanent data collecting instrument. In open pit blast hole drilling the application of a drill recorder is that of data collection, drilling control, and drilling education.
Jan 1, 1970
-
Evaluating seismic potential by energy balance calculations in a deep longwall mine - RASIM2022By M. Sears, W. H. Su, J. Wickline, M. A. Van Dyke, G. Esterhuizen, Z. Khademian
It is commonly recognized that seismicity can be induced by rock failures or slip along geologic structures around mining excavations. The unpredictable nature of these events and their proximity to t
Apr 26, 2022
-
Investigation of occupational accidents in Western Lignite Corporation by using the efficiency assessment approachBy CEM SENSOGUT, OZER OREN, YASAR KASAP
The mining sector, which is important in terms of raw-material and energy supply, is seen as a sector with high number of fatal accidents compared to other sectors. In this century of heightened occup
-
Development, Design, and Installation of Climax's Tin Upgrading CircuitBy R. M. Rowe, T. E. Irwin
A flowsheet was developed for upgrading Climax tin concentrate to about 45 percent Sn. Bench-scale test work conducted at AMAX Extractive Research and Development, Inc., was used to design a multiple-
Jan 1, 1986
-
Society Of Mining Engineers Of AIME On Line Size Analysis In Grinding Circuit ControlBy Larry Diaz
A single stage ball mill-cyclone circuit was extensively tested for its reactions to step changes in three controllable variables: feed rate, water to cyclones, and water to the ball mill. A series of
Jan 1, 1971
-
Lower Grade Nickel Sulfide Resources (a0c91d9f-fa30-4298-95e0-72547311e3ab)By J. M. Duke
Significant resources grading less than about 1 % nickel occur in magmatic sulfide deposits of two types. In the Mt. Keith type, extensive zones of disseminated nickel sulfides occur in the central p
Jan 1, 1982
-
Silo And Bin Storage For Coal And Coal Refuse - I. IntroductionBy H. Colijn
The trend in the coal industry for many years has been to make everything "bigger and faster" This also held true for loading and storage facilities. Where once a million ton per year mine was rare, t
Jan 1, 1979
-
Laboratory Studies Of The Grinding And Rheology Of Dense Coal/Water And Mineral/Water SlurriesBy Richard Klimpel
The laboratory ball mill grinding of coal/water slurries is described for three coals. Emphasis is placed on the measurement of specific rates of breakage for various operating conditions. Correspondi
Jan 1, 1982
-
Proposal of the Tunnel Face Stability Index (TFI) Based on the Critical Shear Strain TheoryBy Shingo Morimoto, Toru Sasaki, Masato Shinji
"1. INTRODUCTIONTunnel face stability is one of the most important consideration in New Austrian Tunneling Method. In general, if all of the material properties of ground can be obtained through the f
Jan 1, 2016
-
Removal Of S02 And Production Of Sulfur From Smelter GasesBy Arcy R., D&apos George
Removal of S02 from smelter gases is being investigated, using an innovative technique that results in the almost simultaneous recovery and production of elemental sulfur. S02 is removed from the gas
Jan 1, 1969
-
Pressure And Temperature Corrections For Coal Desorption MeasurementsBy Lloyd M. English
Accurate knowledge of the gas content of coal seams has always been important, according to the work of W. P. Diamond and J. R. Levine, 1981, but is becoming increasingly important for several reasons
Jan 1, 1984
-
Design for the Cross City Tunnel, SydneyBy Harry R. Asche, Manfred K. Lechner
The Cross City Tunnel comprises 2km of a new underground traffic route in Sydney, Australia. The route is very complex, involving some six separate tunnels and three underground Y-junctions. For al
Jan 1, 2003
-
Microbiological Leaching - Research To Date And Future Applications - A. IntroductionBy A. Bruynesteyn
I would like to talk to you today about microbiological leaching or, the solubilization of metal values due to the action of Thiobacillus ferrooxidans. Bacterial attack of sulfide minerals has been
Jan 1, 1970
-
Control Of Radiation Hazards In Underground Uranium MinesBy John C. Franklin
INTRODUCTION Alpha-emitting radon daughter products are a recognized health hazard contributing to the development of lung cancer in persons exposed to excessive concentrations over an extended per
Jan 1, 1981
-
Solving mine ventilation networks with fixed and non-fmed branchesBy Y. J. Wang
Editor's Note: Y.J. Wang's paper appeared in the September Technical Papers section. There were some inadvertent editorial errors in it. So we are reprinting it here. Abstract - This pape
Jan 1, 1991
-
Modeling and Prediction of Underground Blasting VibrationBy C. Konya, A. Konya
"INTRODUCTION Over the past twenty years this Linear-Regression Modeling has become widely accepted for ensuring limits are not exceeded at a site, using the Scaled-Distance variable. In today’s indus
Jan 1, 2018
-
Leadership In The Mining IndustryBy David M. Spatz
Anyone who scans the modern literature will realize that concepts of leadership have changed during the past few years. And like change in so many areas of our culture, change has been rapid in the pe
Jan 1, 1998
-
Stability analysis for steep-slope mines reclaimed using the forestry reclamation approach - SME Transactions 2013By D. Kumar, R. J. Sweigard, J. Silva
The Forestry Reclamation Approach (FRA) recommends that the upper 1.22 m (4 ft) of spoil material on reclaimed surfaces should be left as uncompacted as possible to facilitate efficient tree root grow
Jan 1, 2013