Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Approximating a project's rates of returnBy M. M. Hajdasinki
A project's rates of return (RORs)1, be it the internal rates return (IRRs) or one of the many IRR surrogates, frequently needs to be approximated. The success and efficiency an ROR- approximatio
Jan 1, 1999
-
A Review Of Some Of The Developments In The Gold Recovery Processes Used In South AfricaBy G. J. C. Young
In 1986 the city of Johannesburg celebrates its first century of existence. The fact that the city was founded to exploit the gold deposits which underlaid it, prompts this review of the gold process
Jan 1, 1985
-
Leaching Of Gold And Silver From A Kupol Composite Sample: Assessment Of The CANMET Enhanced Leaching Process (CELP)By G. Deschênes
In an earlier study (Deschênes et al., 2009), gold and silver were shown to be efficiently extracted from samples taken from the Kupol Mine in Russia using lead nitrate in a cyanide leach system. In t
Jan 1, 2010
-
A Stability Classification System for the Dragline Dump Slope "Mining, Metallurgy & Exploration (2021)"By Ashutosh Kumar Bharati, Rajesh Rai, B. K. Shrivastva, Arunava Ray
Opencast mining method is one of the most productive mining methods available at present, which is generally associated with the removal and handling of a huge amount of overburden material. Hence it
Feb 15, 2021
-
Testing Of Lining Materials In Barrick Goldstrike Pressure Oxidation AutoclavesBy C. E. Semler
A 5 year test program, involving on-line, in-vessel exposures at Barrick Goldstrike Mines. Inc. has provided valuable information and experience about the materials and designs for brickwork linings i
Jan 1, 1997
-
In-Situ Measurements Of Copper And Moisture In An Operating Heap Using Advanced GeophysicsBy K. Lang
A test section of the upper most lift and underlying lifts of a large scale copper heap leach operation was instrumented and monitored with advanced wireline geophysics, fiber optics and resistivity e
Feb 23, 2014
-
Removal Of Sulfur Dioxide From Flue Gases At Elevated Temperature ? SummaryBy J. H. Field
The sulfur dioxide emitted in low concentrations in flue gases from the combustion of sulfur-containing coals and fuel oils is a significant factor in contamination of the atmosphere with sulfur dioxi
Jan 1, 1959
-
Gravity Separation: A Revitalized Technology (67dbc72b-2c2a-4f70-bcf4-9e6e79c94ea5)By A. B. Holland-Batt
Following a relatively static period in the 1960s and 1970s when incremental development rather than innovation was the norm for gravity separation, the last 15 years has seen a number of new developm
Jan 1, 1998
-
Development of Low‐cost Smelting Reduction Process Using Cupola Furnace for Efcient Use of Inferior Grade Manganese Ores and RejectsBy S. N. Gurulaxmi, Veerendra Singh
The abstract discusses the increasing consumption of manganese ores and the need to utilize low-grade ores and rejects. The study focuses on developing a low-cost process using a cupola furnace to rec
Apr 1, 2022
-
Capital And Operating Costs For The Unit Processes Of Solvent Extraction And Electrowinning As Applied To Copper RecoveryBy G. A. Kordosky
Solution mining followed by solvent extraction-electrowinning (SX-EW) is one possible way to economically extract copper from ore bodies which cannot otherwise be profitably exploited. Published costs
Jan 1, 1986
-
Boom Towns: Managing GrowthSatisfactory means of managing growth in boom towns is a concern in mineral, energy and other large industrial developments. This session will include examinations of socioeconomic impacts, major issu
Jan 1, 1979
-
The Island Copper Grinding Circuit - A Progress ReviewBy C. M. Brown
The semi-autogenous grinding circuit at the Utah Mines Limited, Island Copper Operation, located on Vancouver Island, British Columbia, is described. Since start-up of the operation in 1971 grinding c
Jan 1, 1985
-
Simulation of Thermal Effects on the Flow Field in a Pilot-Scale Kiln - Mining, Metallurgy & Exploration (2021)By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG
The flow field and coal combustion process in a pilot-scale iron ore pelletizing kiln is simulated using a computational fluid dynamics (CFD) model. The objective of the work is to investigate how the
Apr 20, 2021
-
Coal Environmental Protection Mining Technology System and Engineering PracticeBy Quansheng Li
Large-scale coal mining will cause environmental problems such as aquifer damage, land excavation and occupation, soil erosion, vegetation damage, and regional landscape damage. The existing coal mine
Jun 25, 2024
-
The Next Generation of TBMs and Conveyor Systems for Mining ApplicationsBy Greg Watson, Dennis Ofiara
"TBMs have been used in mining in decades past, but their use has been limited and sporadic, due to both perceived and actual application difficulties. With new technology and mounting success stories
Jan 1, 2016
-
Structural Fire Protection to NFPA 502 - Performance-Based Design and Assessment of Passive and Active Fire Protection SystemsBy Robinson Leon-Diaz, Alberto Jaen-Toribio, Raymond Blanchard, Mike Deevy, Miguel Fuentes-Llanos
"Tunnels designed to NFPA 502 are required to withstand the RWS time-temperature curve, more specifically prevent progressive spalling and loss of strength of steel reinforcement. Fire boards or spray
Jan 1, 2016
-
In It For The Long Haul At Canadian Oil Sands; New Haul Truck Beds IntroducedBy Josh Swank
Albert Einstein once said, ?the important thing is not to stop questioning.? In the mining industry, a lack of inquisitiveness may lead to a blissful ignorance but it certainly will not increase effic
Jan 1, 2013
-
Impact of air velocity and support advance on shield-generated dustSteady increases in longwall production have required operators to apply greater quantities of ventilating air in an effort to control and dilute respirable dust. Significant increases in shearer spee
Jan 4, 2010
-
Development of a Roof Bolter Canopy Air Curtain for Respirable Dust ControlBy W. R. Reed, G. J. Joy, B. Kendall, A. Bailey
"Testing of the NIOSH-designed roof bolter canopy air curtain (CAC) has gone through many iterations demonstrating successful dust control performance under controlled conditions. J.H. Fletcher & Co.
Jan 1, 2016
-
Coal Oxidation Before Loading With Calcium -Pittsburgh #8 CoalBy E. H. Cho
Pittsburgh #8 coal cleaned by the conventional froth flotation was oxidized in a 2-liter Parr Stirred Top Bench Reactor. The oxidation time was varied up to 5 hours; the temperature, from 150 to 225°C
Jan 1, 1994