Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New improvements to MFIRE to enhance fire-modeling capabilitiesBy L. Yuan, A. C. Smith
MFIRE, the mine-fire simulation program of the U.S. National Institute for Occupational Safety and Health (NIOSH), is widely accepted as a standard for assessing and predicting the impact of a fire on
Jun 1, 2016
-
Hold The News Media Looks At Mined Land ReclamationBy Larry Cook
During the past year the news media has come in for its share of criticism. Some of it, without doubt, is justified. Much of it, like that which has been leveled against some of the rest of us, is not
Jan 1, 1970
-
CFD Modeling Of Air Flow In An Openpit MineBy W. Collingwood
As openpit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in openpit mines is o
Jan 1, 2012
-
Development and Reconciliation of a Mine Operation Value Chain Flowsheet in IES to Enable Grade Engineering and Process Mass Simulations for Scale-up and Strategic Planning Analysis "Mining, Metallurgy & Exploration (2021)"By T. BACHMANN, G. SHAPLAND, E. Amini, N. BEATON, M. BECERRA
In this study, several methodologies to manage low grade and often competent portion of the ore have been proposed and tested in lab, pilot and operational scales. Relevant to this subject, the Cooper
Sep 16, 2020
-
Crack Initiation and Damage Evolution in High Porosity Sandstone Under Cyclic Compression - RASIM2022By Kai Koosmen, Mehdi Serati, Tengzhou Wang
Spalling and rockburst are unwanted brittle failures at the boundaries of underground excavations that are commonly observed in hard rock and high-stress environments at significant depths, although,
Apr 26, 2022
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Application of Surrogate Modeling for SEM Tunneling SimulationBy Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney
This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri
Jun 13, 2021
-
Improvement On Mathematical Model For Studying Coal's Propensity Of Spontaneous Combustion (dd449287-9a34-46ab-911e-758c3fb8cfd4)By Xinyang Wang
It is believed that sulfur and volatile matter contents in coals are the main intrinsic properties to cause the self-heating of coal. Their oxidation at lower temperatures than that of fixed carbon to
Jan 1, 2013
-
Studies Of Friction Factor For Kentucky's Coal MinesBy Andrzej M. Wala
A knowledge of the friction factor (K-factor) is necessary in planning and designing mine ventilation systems for least cost and highest effectiveness. The friction factor used must be accurate and re
Jan 1, 1991
-
The Trend Toward Belt Conveying Of Ore And Haste In Arizona's Open Pit MinesBy Stephen F. Munsell
The development of transportation systems for mined materials has historically been characterized by steadily increasing sizes in basic hauling units. This is especially true for open pit mines for wh
Jan 1, 1978
-
Predicting Run-Of-Mine Ore Grades For Large-Scale Sublevel Caving At LKAB's Kiruna MineBy M. E. Kuchta
LKAB's Kiruna mine, located above the Arctic Circle in northern Sweden, is one of the world's largest underground mines, and it is one of the most modern. The Kiruna orebody is a high-grade
Jan 1, 2003
-
Semi Autogenous-Ball Mill-Crushing Circuit (SABC) At INCO'S Clarabelle MillBy T. McDonald
Test work indicated and plant operation has since confirmed that SAG milling is a viable option for INCO's Sudbury Operation milling rationalization project only if pebble crushing is included in
Jan 1, 1992
-
Assessment Of The Real Economic Feasibility Of Potential Critical Raw Materials Mining Projects In The U.s.; Implementation Of A Newly Developed Computational Tool - SME Annual Meeting 2022By M. A. Islam, H. Mischo, G. Barakos
Among the thirty-five declared critical raw materials (CRM) in the United States, there is no sustainable domestic production for the fourteen of them, while for some others domestic supply does not m
Mar 2, 2022
-
Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada
The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai
Jun 23, 2024
-
Gate Road Layout for Deep-Cover, Dipping Longwall Recovery: A Case Study in the Western United StatesBy Christopher Newman, David Newman
The ability to assess, address, and predict mining-induced stress distribution is paramount in maintaining a safe and efficient underground operation as coal mines continue to develop at deeper depths
Jul 1, 2023
-
Application of Multiple-Point Statistics (MPS) for Stochastic Gold Grade Estimation in Areas with Sparsely Spaced Drillhole DataBy Richard Minnitt, Philippe Renard, Christina Dohm, Winfred Assibey-Bonsu, Matthew Aboagye, Julien Straubhaar, Mahlomola I. Mabala
The application of multiple point statistics (MPS) in oil studies has gained traction over the years; however, the use of MPS in mineral resource estimation and classification is still limited. This i
Jun 25, 2023
-
Evaluation and Construction Effects of a 22-Story Tower on Adjacent Metro Tunnels in Los Angeles - RETC2023By Stan Tang, Yiming Sun, S. Amir Reza Beyabanaki, N. Sathi Sathialingam
The Kurve mixed-use development project including a 22-story tower at 2801 Sunset Place was constructed on a site consisting of a roughly rectangular-shaped lot at the intersection of Wilshire Bouleva
Jun 13, 2023
-
Simulation of Thermal Effects on the Flow Field in a Pilot-Scale Kiln - Mining, Metallurgy & Exploration (2021)By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG
The flow field and coal combustion process in a pilot-scale iron ore pelletizing kiln is simulated using a computational fluid dynamics (CFD) model. The objective of the work is to investigate how the
Apr 20, 2021
-
Investigation of Correlation of Excavator Operators’ Hand-Arm Vibration Exposure with Produced Rock Physical-Mechanical Properties in Natural Stone Quarries Mining, Metallurgy and ExplorationBy Ali Ekrem Aritan
Exposure to hand-arm vibration (HAV) among the labor force in the mining industry can result in permanent vibration diseases such as behavioral disorders, visual impairment, osteoporosis, pain (mostly
-
Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983By Earl M. Woodward
INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors
Jan 1, 1983