Monitoring Used as an Alarm System in TunnelingBy M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli
This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th
Jan 1, 2007
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
EPB TBM Tunnelling in Singapore Old AlluviumBy N. Loganathan, Tan Boon Tee, Joe O’Carroll, Richard Flanagan
In recent years, tunnelling activities in Singapore have increased considerably with the construction of extensions to the existing sub-surface transport system, a deep tunnel sewerage disposal system
Jan 1, 2005
-
Characterization Of Coal And Quartz Dust In Interior Basin Coal MinesBy Y. Paul Chugh
NIOSH and the Illinois Clean Coal Institute are funding studies on characterization of coal and quartz dust in Interior Basin mines since 2009. Coal dust characteristics vary significantly and, are vi
Jan 1, 2011
-
Using Principles Of Inherent Safety In Design Of Hydrometallurgical Solvent Extraction PlantsBy L. J. Moore
Introduction Hydrometallurgical solvent extraction (SX) processes – featuring large quantities of combustible or flammable organic solvents - are common in the mining industry for recovering non-fe
Jan 1, 2006
-
Increased Prodcution Planned at Anshan Iron and SteelThe Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon
Jan 3, 1980
-
Maintenance Management: Minimizing Risk to ProfitabilityBy Paul D. Tomlingson
Modern production equipment has been designed with greater productive capacity and higher reliability to meet the rigorous operating demands of the mining industry. These improvements have also made
Jan 1, 2005
-
Actualizing Sustainable Mining: “Whole Mine, Whole Community, Whole Planet” Through ‘Industrial Ecology’ And Community-Based StrategiesBy Ivan Weber
Asking the question, “What do the world’s leading corporations and cutting-edge practitioners of sustainability put forth to guide a given mine site for planning and action toward ‘sustainability’?”,
Jan 1, 2005
-
Utilizing Paste Technology For Reclamation Of The Ute-Ulay Upper Tailings Impoundments, Lake City, CO - Project BackgroundBy T. Tafi
The Ute-Ulay project area is located approximately five miles west of Lake City, in Hinsdale County, Colorado. The Ute-Ulay Mine site is approximately one mile east of the project area. The elevatio
Jan 1, 2011
-
Study on the performance of ventiflex ducting and couplingsBy L. M. Anisdahl
Ventiflex is a flexible ventilation duct system with a global market within mine and tunnel ventilation. The system is distributed in a wide range of qualities and dimensions. It is very important tha
Jan 1, 2009
-
The Effect Of Laboratory Cell Design On Flotation Machine Hydrodynamics, Solids Suspension And Particle RecoveryA large lab apparatus was designed using a scale-down methodology based on the design legacy of the current FLSmidth commercial forced air flotation machines. This new apparatus, along with a new test
Jan 1, 2012
-
A Snapshot Of Noise And Worker Exposures In Sand & Gravel OperationsBy E. R. Bauer
Previous studies and research efforts have shown that noise-induced hearing loss (NIHL) is a problem in the U.S. mining industry. This is especially true in surface and underground coal and stone min
Jan 1, 2008
-
Innovative features of the Bridger Coal Company supply air fans and systemBy G. S. Takenaka
When Bridger Coal Company transformed their operations from surface mining to an underground longwall operation their plans included not only the addition of new mining equipment but also surface fans
Jan 1, 2009
-
Dust control in room-and pillar coal mining using continuous miners: Additional field evaluationsBy Y. P. Chugh
Additional field evaluations of a modified continuous miner using a new spray system and modified scrubbers have been conducted by the authors. In this demonstration, a comprehensive package for dust
Jan 1, 2009
-
Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan OperationsBy A. Koski
A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U
Jan 1, 2007
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
Metals And Minerals Mining - Past And Future TrendsBy R. Mier
The metals and minerals mining industry has evolved dramatically from the earliest objects ever made out of native copper circa 9,000 BC to the modern developments we see today. To better appreciate p
Feb 27, 2013
-
Benefits Analysis Of Expert Control SystemsBy A. Broussaud, J. D. McKay
Benefits analysis of adaptive Expert control systems operating at plants in Africa and the United States are presented. Proper statistical tools and techniques are discussed. Technical and practical
Jan 1, 2001
-
Regrind Mills: Scaleup Or ScrewupAs ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind
Jan 1, 2011
-
An Analysis Of Subsidence Movements Associated With An Abandoned Shallow Room-And-Pillar Coal MineBy Yoginder P.
ACKNOWLEDGEMENTS Authors sincerely appreciate the interest, cooperation and technical support of the coal company management and staff in conducting the study. Without their assistance this study
Jan 1, 1986