    No.3 Mine Fire -A Case Study

    By C. C. Stewart

    Jim Walter Resources, Inc. operates four underground coal mines in Alabama. In 1986, during longwall recovery operations, sparks from a torch ignited methane that migrated onto the face after a roof f

    Jan 1, 1993

  • SME
    The Effect Of Coal Preparation On Power Plant Fuel Cycle Cost Measured At The Bus Bar

    By W. V. Bluck

    Higher coal quality is being recognized in potentially lowering the cost of power as measured at the bus bar. Assessment of potential coal supplies for most any given power plant is now going beyond b

    Jan 1, 1983

  • SME
    Oxidative Origin Of Sedimentary Humic Acids, Important Carriers Of Metals

    By Patrick G. Hatcher

    Studies of sedimentary humic acids by nuclear magnetic resonance (NMR), stable isotopes, and elemental analysis show they are derived by oxidative degradation of complex plant macromolecules that are

    Jan 1, 2013

  • SME
    Remote De-Tensioning of Tieback Anchors After Structural Completion - RETC2023

    By Sean Peterfreund, Grant Finn, Ty Jahn

    For urban underground development involving tieback anchors for excavation support, authorities having jurisdiction typically require tiebacks to be de-tensioned before project completion. This paper

    Jun 13, 2023

  • SME
    Techno-Economic Assessment Of Tailings Retreatment

    By D. Malhotra

    Metallurgists are continuously striving to improve recovery. But optimization of profits and/or revenue dictates that recovery can be sacrificed at the expense of throughput. However, recently there h

    Jan 1, 1994

  • SME
    Stability Analysis For The Rehabilitation Of The La Libertad, Nicaragua Tailings Dam

    By M. A. Candia

    Stability analyses were performed on the La Libertad, Nicaragua existing tailings embankment in order to determine the conditions for the minimum buttressing required for stability of the dam as a sho

    Jan 1, 1996

  • SME
    Pre-Split Blasting: Theory And Practice

    By Calvin J. Konya

    An investigation was performed to determine conditions which optimize fracture formation between blastholes used for purposes of pre-splitting. Experiments-involved high-speed photography in Plexiglas

    Jan 1, 1980

  • SME
    Prime Farmland Productivity Requirements

    By D. Spindler

    Pursuant to the Federal Surface Mining Act of 1977 and the Illinois Surface Mining Act of 1980, Illinois has adopted revegetation success standard regulations that include the Agricultural Land Produc

    Jan 1, 1986

  • SME
    Mine Shaft Conveyance Monitoring (38e20416-f230-40fa-92d7-d1e67bec18a0)

    By M. J. Beus

    Technology to enhance safety during mine hoisting has been developed by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health. Assessment of curre

    Jan 1, 1999

  • SME
    Non-Bauxite Alumina Resources

    By Haydn H. Murray

    Although alumina constitutes about ii percent of the earth's crust, it is expensive to separate and purify for the production of aluminum with the exception off the alumina in bauxite. The United

    Jan 1, 1982

  • SME
    "Air Pollution From Mining Operations" Introduction

    By James R. Jones

    The tempo of air pollution control regulations has increased dramatically in the past few years. Because coal mining operations are frequently located in remote areas away from urban developments, spe

    Jan 1, 1973

  • SME
    Development Of Continuous Rapid Curing (CORAC) Process For Cold Bonded Pellets

    By K. Yatsunami

    NKK has developed a new cold bonded pellet process. The features of this process are; 1) it is a continuous process with 10 hours curing. 2) Products can be used as materials for various metallurgical

    Jan 1, 1984

  • SME
    A Production Monitoring Scheme For Continuous Mining Sections

    By Jeffery L. Kohler

    A method of monitoring production, information, i.e., raw tonnage and machine state, from each working section has been developed. The method is based on the sensing of electrical parameters in each s

    Jan 1, 1988

  • SME
    Cutter Roof And Its Causes

    By Wen H. Su

    This paper examines the intrinsic mechanisms of cutter roof by combining field investigation, laboratory testings, underground instrumentations, and numerical modelling. Cutter roof developed during t

    Jan 1, 1985

  • SME
    Characteristics Of Column Flotation Utilizing Aspirated Aeration

    By Donald E. Zipperian

    The studies described in this paper have established that flotation conducted in a column cell provided with gas generation by aspiration into surface tension lowered water, may considerably increase

    Jan 1, 1984

  • SME
    The Acquisition, Interpretation And Storage Of Geological And Geotechnical Parameters With Reference To Design Of Coal-Mine Layouts

    By M. Karmis

    The design of coal-mine layouts is based on the knowledge of a broad range of geological and geotechnical parameters, which must be determined from a sequence of exploration programs. It follows that

    Jan 1, 1980

  • SME
    The Integrity of Samples Acquired by Deep Reverse Circulation Drilling Below the Water Table at the Chimney Creek Project, Nevada

    By A. Wright

    Gold Fields Mining Corporation is presently evaluating gold mineralization beneath thick, wet alluvium at the Chimney Creek Project, Nevada. Contamination of reverse circulation samples has been visua

    Jan 1, 1991

  • SME
    Models For Coal Blending: A Comparison

    By M. E. Gershon

    Software for coal blending has gained a lot of recent attention as micro-computer programs have come on the market. Some of this software is appropriate and some is not. This paper looks at the types

    Jan 1, 1988

  • SME
    Construction And Operation Of An Innovative Long Distance Conveying System At Twin Buttes

    By F. Brost

    In 1976, a decision was made to install a conveying system to transport ore 10.3 km (6.4 miles) from the new Eisenhower Partnership Mine to Twin Buttes. The system, supplied and installed by Cable Bel

    Jan 1, 1979

  • SME
    Blasting Practices At The Cannon Mine

    By C. J. Gilbert

    The mining method at the Cannon Mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill prior to pillar removal. The dimensions of the pillars, 24 feet w

    Jan 1, 1989