Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Correction to: The Leaching of MgCO3 and CaCO3 from Mount Isa Zinc Concentrate

    By E. Yiğit, M. N. Saridede

    Correction to: Mining, Metallurgy & Exploration. https://doi.org/10.1007/BF03402385 The original online article has been revised to correct the author names. Publisher’s Note Springer Nature remains n

    Dec 23, 2021

  • SME
    Legal and Due Diligence Requirements of Concerned Parties When Reporting Mineral Resources & Reserves

    By Steve Vaughan

    Canadian Regulation and Reporting Requirements High reporting standards are essential in developing and sustaining a strong confident capital market. As of February 1, 2001, technical reports on min

    Jan 1, 2003

  • SME
    Pragmatic Tailings Dam Design - Balancing Cost, Simplicity and Environmental Impact

    By H. N. McLeod, B. C. Butler, S. R. Rice

    Tius paper describes the key considerations for design of impoundments for gold mine tailings. Design options available for construction are presented. The key considerations for design of a safe, eco

    Jan 1, 1991

  • SME
    Gravity Concentration At Tvx Mineral Hill Mine

    By Shawn Healey

    The Mineral Hill Mine, owned and operated by TVX Gold Inc., is located in the Beartooth Mountains, 5 miles north of Gardiner Montana, U.S.A., which is the north entrance of Yellowstone National Park.

    Jan 1, 1996

  • SME
    Discussion – Large Dozer Stripping Case Studies – Mining Engineering, Vol. 45, No. 9, September 1993, pp. 1185-1189 – Hrebar, M. J.

    By B. Beatty

    This is a response to M. J. Hrebar's paper, which tracks in detail the highly productive stripping capabilities of modern large bulldozers at two separate installations. It proves the old adage "

    Jan 1, 1994

  • SME
    Heap Leaching At Borealis Gold Project

    By Rex L. Outzen

    Houston International Minerals Borealis Project is an open pit heap leach operation. The operation uses open pit mining, two stage crushing, agglomeration, heap leaching, zinc precipitation and induct

    Jan 1, 1984

  • SME
    Selection Of PCC Liner Segments And Compatible TBM For The San Antonio Tunnels

    By Dennis Ofiara, Paul Zick

    Two 8.2 m diameter flood control tunnels are being constructed in the Taylor Shale Formation beneath San Antonio, Texas. These tunnels use precast concrete segments as final lining. This paper describ

    Jan 1, 1989

  • SME
    Preliminary evaluation of bubble column flocculation

    By D. V. Ramani, M. M. Kissel, M. T. Ityokumbul

    Experiments were carried out to determine the efficacy of bubble column flocculation. An acid-base neutralization method was used to determine the mixing time in a 0.064- by 1.5-m bubble column equipp

    Jan 1, 2000

  • SME
    Small block VCR mining at Homestake

    By J. Muir

    This report focuses on minimum ore block sizes that are economically feasible to mine with the vertical crater retreat (VCR) method. In 1985, Homestake Mining Co. began a program to bring several smal

    Jan 1, 1987

  • SME
    Technical Note - Selective oil agglomeration of Agbaja iron ore

    By G. G. O. O. Uwadiale

    Starting from a crude ore assaying 45.6% Fe, a fine-grained oolitic iron ore was concentrated by the oil agglomeration technique to 90% Fe recovery and 65% Fe assay. The ore required grinding to minus

    Jan 1, 1991

  • SME
    Study on belt system bunkering

    By S. D. Thompson, J. C. Dzurino

    This investigation mainly focused on designing a bunker system for a large underground coal mine. The primary purpose of this bunker system was to keep high- and low-sulfur coal segregated on the unde

    Jan 1, 1987

  • SME
    Comparison of two simulators for belt system design

    By S. D. Thompson, G. T. Lineberry, A. J. Basu

    Conveyor belt haulage has become the preferred mainline transport method in underground coal mining, especially for multi-unit mines. Proper designs for belts (width and speed) and surge bins (placeme

    Jan 1, 1991

  • SME
    Simulation Of Flotation Bank Performances As A Function Of Fineness Of Grind

    By Sylvain Duchesne, Claude Bazin, Robert Grant

    Grinding simulators are now widely available to assist in the selection of circuit operating conditions or flowsheet designs that yield a given product size distribution. These simulators do not infor

    Jan 1, 1995

  • SME
    The Influence of Designs, Maintenance Practices, and Operating Conditions on Sag and Ag Mill Liner Performance

    By James L. Parks

    This paper describes improvements in SAG and AG mill liner designs and their cumulative effect on wear life and mill availability. Routine procedures used by many SAG and AG mill operators to improve

    Jan 1, 1998

  • SME
    Geology and Processing Problems of Primary Gold Deposits of Northeast Brazil

    By José Salim, T. V. Subrahmanyan

    The occurence of primary stratiform and vein gold deposits in the Precambrian rocks of Northeastern Brazil is discussed. The stratiform deposits are related to clastic sediments (quartzites and conglo

    Jan 1, 1988

  • SME
    The Use of Friction Connections to Transmit Heavy Loads on Conveyor Drives

    By Kurt Burg, Allen Reicks

    Tapered clamping devices have been used successfully over the years to transmit torque and bending loads from conveyor drives to conveyor belts. Proper design and application is important in the succe

    Jan 1, 2002

  • SME
    Wet Concentrating Tables

    By A. W. Deurbrouck, W. W. Agey

    Introduction The modern wet concentrating table is a rectangular or rhomboid shaped normally rimed-deck operated in essentially a horizontal plane (Fig. 23). A drive mechanism imparts a differential

    Jan 1, 1985

  • SME
    Upgrade to Profit: The Fast Track Retrofit of an Existing Coal Mine Raw Coal Conveyor System with Medium Voltage Variable Frequency Drives

    By Michael L. Nave

    An existing coal mine's raw coal 60 inch conveyor system had become productivity bound by a capacity of 3,500 tph. The existing conveyor drives were fixed speed wound rotor induction motor drives

    Jan 1, 2002

  • SME
    An Object-Oriented Expert System For Underground Mining Method Selection And Project Evaluation

    By Thomas W. Camm

    A WINDOWS-based object-oriented expert system for prefeasibility evaluation of hard rock mines is being developed at the Western Field Operations Center (WFOC) of the Bureau of Mines. Designed for use

    Jan 1, 1992

  • SME
    Flocculation Behavior Of Dolomite With Poly(Ethylene Oxide)

    By S. Behl, S. Mathur

    It was previously reported that dolomite samples from different locations showed varying flocculation behavior with poly(ethylene oxide) (PEO). In this study, a Florida dolomite sample was examined, a

    Jan 1, 1996