Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Widening Uncertainties In The Utility Fuel OutlookBy J. B. Platt
Many utility fuel choices 1990-95 defied expectations, with utility decisions and coal market developments ever more closely linked. The Central Appalachian coal boom never occurred; clean-enough coal
Jan 1, 1997
-
Modeling of natural cyanide attenuation in tailings impoundmentsBy M. M. Botz
Cyanidation tailings disposed of in a surface impoundment experience a loss of cyanide due to natural attenuation, which frequently reduces the cyanide concentration to very low levels. Quantifying cy
Jan 1, 2000
-
Smelting Of Military Electronic ScrapBy Raymond O. Dannenberg
Potential processes for the recovery of precious metals and copper from diverse types of complex electronic scrap were investigated. Leaching-type processes were not successful, and attempts to physic
Jan 1, 1970
-
Optimizing Grade Control In Open Pit Gold MiningBy Kadri Dagdelen
The classification of selective mining units (SMU) and the assignment of grades to those classified SMU are very important in open pit mining, especially for precious metal mining. When the classifica
Jan 1, 1999
-
Copper Electrolite Solution FiltrationBy Judson G. Brown
In the May, 1969 issue of Mining Engineering the Editorial Director, John V. Beall, described the Japanese Onahama Copper Smelter and Refinery as follows: "On the shore of the Pacific, 120 miles nor
Jan 1, 1970
-
Industrial Minerals In South Carolina Past, Present And FutureBy Norman K. Olson
A geologic investigation of mineral resources in South Carolina first began in 1825 when the General Assembly authorized Lardner Vanuxen to conduct a "Geological and Mineralogical Survey of South Caro
Jan 1, 1977
-
Design Of Drift Supports In Block-Caving OperationsBy W. J. Karwoski
A ground-support system for grizzly and haulage drifts was tested in Magma Copper Co.'s San Manuel mine. Eight two-piece, wide- flange steel sets were erected in a ventilation drift on the 2315 g
Jan 1, 1979
-
Automation in Detection of Recirculation in a Booster Fan Ventilation NetworkBy M. Shriwas, F. Calizaya
"Recirculation is prohibited in many coal mining countries because of the fear that the re-use of return air would allow the build-up of air contaminants at the workings. The incorrect design and loca
Jan 1, 2015
-
An Application Of Queueing Theory To Equipment Selection For A Large Open Pit Copper MineBy George Hufford
An investigation is made into the applicability of queueing theory to simulating the operation of a large open pit copper mine in the southwestern United States. Actual data from a working mine was us
Jan 1, 1981
-
A New Mathematical Programming Formulation for Production Scheduling Optimisation of Sublevel Stoping Operations in the Presence of Pre‑concentration Systems - Mining, Metallurgy & Exploration (2023)By Micah Nehring, MEHMET KIZIL, Farzad Sotoudeh, Amin Mousavi, PETER KNIGHTS
Production scheduling in underground mines is one of the most important and complex processes in maximising the economic value of an operation over the life of the mine. Due to increasing energy, tran
Nov 16, 2023
-
Mine Operations Strategy In A Fluctuating Environment ? IntroductionBy S. K. Palm
Volatility is a fact of life in the mining industry. Prices of and demand for mineral products are among the most volatile of those for any product. The volatility of these markets wreaks havoc on bot
Jan 1, 1986
-
Prediction Of Subsidence Basin By The Weibull Distribution FunctionBy R. H. Zeng
Many subsidence researchers in the U. S. have developed new empirical function methods to predict subsidence, or attempted to validate some empirical functions developed by foreign researchers for use
Jan 1, 1986
-
Vacuum Filtration: Available Equipment And Recent Innovations (1d8b2c0d-43d3-4554-8421-efd2df8d1a31)By Stanley M. Moos
In reviewing available vacuum filtration equipment in this paper, several types of filters have been included which are probably not familiar to operators in the mining industry. However, it was felt
Jan 1, 1978
-
Zeta Potential Measurements Of The Components Of Wet Flue-Gas Scrubber SludgePower plants that utilize conventional wet flue-gas desulfurization methods produce enormous amounts of flue-gas scrubber sludge. A typical 400 MW power station that burns a high sulfur coal produces
Jan 1, 1996
-
Ventilation and Safety of Long and Deep Tunnels—State of the Art and New PerspectivesBy Samuel Rigert, Marco Bettelini
"INTRODUCTION AND OBJECTIVES Long rail tunnels require in most cases powerful mechanical ventilations. Besides requirements related to normal operation and maintenance, operational safety always requi
Jan 1, 2016
-
Molybdenum Solvent Extraction Using CYANEX® 600 Extractant: Part II, Commercial PerformanceBy T. McCallum, C. Cooper, C. Lewis
"Following a successful solvent extraction (SX) pilot plant demonstration in 2016, CYANEX® 600 has been used commercially to recover molybdenum from concentrate leach liquor since March 2017. Consiste
Jan 1, 2018
-
The Feasibility Of Hybrid Network And Cfd Modeling For Mine Ventilation ApplicationsThis paper examines the feasibility of combining network modeling and computational fluid dynamics for modeling of underground mine ventilation systems. Both simulation methods have specific advantage
Feb 23, 2014
-
Hydrologic Aspects Of Strip Mining In The Subbituminous Coal Fields Of MontanaBy Wayne A. Van Voast
Many coal beds that will be mined in southeastern Montana are aquifers that provide essential local water supplies. Mine cuts along aquifer outcrops create almost imperceptible piezometric changes. Mo
Jan 1, 1978
-
The Interdependence Of Economic And Hydrologic Criteria In Planning Water Resources DevelopmentBy S. W. Mao
Hydrologic and economic criteria figure in many obvious ways in water resources development, but they are rarely linked quantitatively, and most of the applications are pertinent only to the case-in-p
Jan 1, 1967
-
Challenges in Adapting Tunnel Construction Contracts to Actual Ground ConditionsBy Lena Paar
"Underground construction poses certain challenges for all parties involved because the actual ground conditions are often unpredictable. Highly complex projects like tunnel construction are affected
Jan 1, 2016