Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Using meaningful reconciliation information to evaluate predictive models

    By M. E. Rossi, V. Camacho

    Reconciliation of production information is critical to evaluating the effectiveness of predictive models that would allow for the optimization of mining operations. Whether mining open pit or undergr

    Jan 1, 2000

  • SME
    Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System

    By Takuji Yamamoto

    High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec

  • SME
    Utilizing Composite Action to Achieve Lining Thickness Efficiency for Sprayed Concrete Lined (SCL) Tunnels

    By Jiang Su, Alan Bloodworth

    "Composite sprayed concrete lining (SCL), consisting of two layers of permanent sprayed concrete separated by a layer of spray-applied waterproofing membrane, represents the latest development in SCL

    Jan 1, 2016

  • SME
    Evaluation and Management of Acid Drainage Risk from Spent Ore, El Abra Mine, Chile

    By R. C. Ford, J. Kelsey, S. A. Pierce, M. D. Ankeny

    Evaluation of acid drainage risk from spent (leached) ore in arid climatic zones consists of two components: (1) whether residual and secondary minerals will release acid and metals when exposed to ra

    Jan 1, 2000

  • SME
    Na/Ca montmorillonite : properties and uses

    By I. E. Odom

    The physiochemical properties and industrial uses of the clay mineral montmorillonite are reviewed. Montmorillonite is the most abundant species of the smectite clay mineral group and is the predomina

    Jan 1, 1988

  • SME
    Sulfide Biooxidation: Pilot Heap at Gilt Edge

    By John W. Shield

    Oxide gold reserves are being rapidly depleted, especially in regions with long histories of gold mining, such as the Black Hills of South Dakota. However, these districts often have substantial addi

    Jan 1, 1996

  • SME
    Optimization and selection of a surface mine coal-haulage system

    By S. Yang

    Based on an analysis of the features found in Chinese surface coal-mining areas, including areas that have already been developed and areas that are in the process of being developed, this paper discu

    Jan 1, 2000

  • SME
    Removal And Stabilization Of Mercury From Gold Cyanide Solutions Using Dithiocarbamates

    By C. H. Bucknam, A. M. Raichur, M. Misra

    Simultaneous dissolution of mercury along with gold occurs during cyanidation of gold ores. A method has been found for the efficient removal of mercury from the gold cyanide solution by treating with

    Jan 1, 1997

  • SME
    Preexcavation Deep-Hole Stress Measurements For Design Of Underground Chambers--Case Histories

    By Bezalel C. Haimson

    Long before excavation begins, the in situ stresses in the horizon of planned underground chambers can be measured by employing the hydrofracturing technique in existing exploratory holes. Such measur

    Jan 1, 1976

  • SME
    Effect Of Application Frequency of Asphaltic Gear Spray Lubricant On Performance

    By H. Benedict

    For many years, asphaltic lubricants have been used on large open gears. The asphaltic's diluent is essential to thin the lubricant enough to be sprayed. Once the lubricant has been sprayed int

    Jan 1, 2003

  • SME
    Long-term subsidence associated with longwall mining - its causes, development and magnitude

    By Y. Luo, S. S. Peng

    This paper presents some results obtained from research on long-term subsidence over and near chain pillar systems - the area available to long-term subsidence in longwall operations. Although the lon

    Jan 1, 2000

  • SME
    Control of Conveyor Peak Loads by Varying Feeder Discharge Rates

    By Jon C. Yingling

    A control system for reducing peak loads on mine conveyor networks is proposed. The system involves continuous monitoring of flows into the conveyor network and section feeders with variable discharge

    Jan 1, 1992

  • SME
    An Experimental Setup For Multiple-Fan Ventilation Systems

    By N. P. Reddy

    This paper describes an experimental setup for multiple-fan ventilation systems at the ventilation laboratory of the WVU Department of Mining Engineering. Housed in a 30 ft by 70 ft room, the experime

    Jan 1, 1992

  • SME
    Three-Dimensional Computer Modeling Of Particulate Flow Around Dust Monitors

    By B. D. Nichols, W. S. Gregory

    SOLA-DM is a three-dimensional finite-difference computer code designed to model the dynamics of an incompressible fluid and the transport of discrete particulate material around obstacles impervious

    Jan 1, 1987

  • SME
    Screening Kriging

    By Rudolf Greuer, Gerald Jalkanen, Huann-Sheng Chen

    A short cut is presented where the average grade above a primary grade cutoff and its associated byproduct grade(s) are estimated by screening the primary and byproduct grades. For the primary variabl

    Jan 1, 2002

  • SME
    Microbially Induced Separation Of Quartz From Hematite Using Yeast Cells And Metabolites

    By K. A. Natarajan

    The utility of yeast, Saccharomyces cerevisiae, in the separation of quartz from hematite is demonstrated. Yeast cells, as well as their metabolites, functioned as flotation collectors, depressants or

    May 1, 2012

  • SME
    Mine Fire Control By Explosive Fragmentation

    By R. R. Rollins

    Conventional methods of controlling abandoned mine fires include: loading out, inundation, fire barriers, flushing, and surface sealing. This paper describes a proposed fire-control technique utilizin

    Jan 1, 1989

  • SME
    Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New Jersey

    By Keith Schaeffer

    This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f

    Jan 1, 2008

  • SME
    Underground Ventilation Remote Monitoring and Control System

    By Kirk H. P. E. McDaniel, Mark T. Strever, Keith G. Jr. Wallace

    This paper presents the design and installation of an underground ventilation remote monitoring and control system at the Waste Isolation Pilot Plant. This facility is designed to demonstrate safe und

    Jan 1, 1995

  • SME
    Interactive Evaluation Of Linear Octree Encoded Deposit Models

    By P. R. G. Bak

    The integration of interactive computer graphics technology with data analysis tools can assist in the evaluation of deposit models: the super- imposition of mine openings on complex geology can be qu

    Jan 1, 1992