Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Overview of the geology and production of Wyoming tronaBy Ray E. Harris
Introduction A resource of more than 122 Gt (134 billion st) of minable trona and mixed trona and halite underlies an area of about 3400 km2 (1300 sq miles) west of Green River, WY (Culbertson, in pr
Jan 10, 1985
-
Computer Simulation Of The Integrated Mining And Reclamation Operations At A Surface Coal Mine In Southern IllinoisBy S. L. Barua
An industrial engineering and computer simulation study was conducted on reclamation operations to evaluate the possibility of integrating mining and reclamation operations, and to evaluate the factor
Jan 1, 1981
-
An Update On The Development Of Doe's Micro-Mag ProcessBy M. S. Klima
This paper will detail the work that has been done in 1990 and 1991 at the Pittsburgh Energy Technology Center (PETC) on the development of the U.S. Department of Energy's (DOE) patented Micro-Ma
Jan 1, 1992
-
Congressional Makeup Could Help U.S. MiningBy Steve Kral
Improved metals and other commodity prices have caused the mining industry to open new mines, re-evaluate development opportunities at potential mines and increase production at existing ones. This s
Jan 1, 2005
-
High Speed Sheet StackingBy Fred J. Fleischauer
Industry requires higher speed sheet stacking. High speed sheet stacking requires equipment and techniques to solve several inherent difficult problems, such as the tendency for sheets to sail, and th
Jan 1, 1973
-
Characteristic Curves Revisited: A More Logical Approach To Determining Operating PointsBy L. M. English
When plotted as head vs. volume, fan curves start high and decrease in head with increasing volume while mine head curves start low and rise with increasing volume. Their intersection is the system op
Jan 1, 1997
-
Discovery And Development Of Peabody Coal Company's Black Mesa MineBy John M. Arnold
Several years ago it became apparent to some of our people that; there was developing a very definite need for largee coal reserves in the West to satisfy- the need for fuel for the furnaces of electr
Jan 1, 1969
-
Modeling Mine Water Treatment Processes and Recycle Loops Using GoldPHREEQCBy A. L. Ling, A. K. Janzen
"Design of effective mine water treatment plants depends on the ability to reliably predict treatment outcomes, but systems with multiple chemical and physical treatment processes and recycle loops ca
Jan 1, 2018
-
Guidelines given for developing and using an integrated maintenance systemBy Paul D. Tomlingson
Part one of this two-part series covers conceptualizing and developing a maintenance information system. It explains what information is necessary to manage such a system. Next month, part two will
Jan 7, 1985
-
Intelligent Prediction of Critical State Parameters for Non‑plastic Tailings and Soils Using Evolutionary Algorithms - Mining, Metallurgy & Exploration (2024)By Satyam Tiwari, Sarat Kumar Das
Tailings from mines and industries impose danger to the environment as evidenced by the recent failures of tailing storage dams. The tailings are mostly non-plastic with silt-size particles, but their
Dec 22, 2023
-
Mining Development In The Context Of Regional DevelopmentBy K. Oraee
A comprehensive, harmonic and sustainable development has always been a real concern of state policy makers. To reach such development, regional planning is an approach which is widely applied. Th
Jan 1, 2012
-
Recent Insight Into Longwall Strata Movements Deduced From Subsidence Analysis (296400d0-6045-427e-b989-3ef30ada6a94)In this paper, a number of novel hypotheses that provide a fresh perspective on the characterization of strata movements associated with longwall mining are developed by analyzing subsidence measureme
Jan 1, 1986
-
The Application Of Bulk Emulsion Explosives In Tunneling And Drift RoundsBy David A. Smith
A new generation of reliable, stable, and easy to use bulk emulsions allowing application in tunneling and drift rounds has been developed. This new product group of bulk emulsions has been especially
Jan 1, 1987
-
Environmental Regulations in the Powder River BasinBy Marion Loomis
Environmental regulation is an ever growing cost to the mining industry. Requirements for such items as air quality modeling, hazardous waste disposal, selenium concentration in water and sagebrush pl
Jan 1, 1994
-
Sensitivity Analysis Of Cash-Flow Factors To Discounted Rate Of Return -A Decision Making Tool (4e0aa8bf-dd9b-41c8-9626-85ffb72cbfdd)By Joseph M. Chelini
The report shows the sensitivity that nine different cash-flow factors have on the discounted rate of return calculated from feasibiliity- studies on potenital open-pit orebodies of silver, copper, an
Jan 1, 1971
-
Computational fluid dynamics (CFD) investigation of impacts of an obstruction on airflow in underground mines - SME Transactions 2012By L. Zhou, A. Martikainen, G. Goodman
Continuous airflow monitoring can improve the safety of the underground work force by ensuring the uninterrupted and controlled distribution of mine ventilation to all working areas. Air velocity meas
Jan 1, 2012
-
Energy Conservation In The Smelting Of AluminumBy Noel Jarrett
Energy consumption and distribution in aluminum production, conservation accomplishments, and future goals are presented. Electrolysis and electrode manufacture show the greatest promise for major imp
Jan 1, 1981
-
Tailings Dam Sealed By Slimes SlurryBy Steven L. Webb
In 1965, Monsanto started planning of a new dike (No. 15) for use in disposing of ore tailings at its Columbia, Tennessee phosphorus plant. Generally, in the phosphorus industry only clay tailings are
Jan 1, 1971
-
Hydrometallurgical Conversion Of Stibnite To Antimonous Oxide Via Antimony TrichlorideBy John L. Shafer
A process for the conversion of stibnite (Sb2Sj) concentrates, crude antimony oxide, or metal to a pure cubic antimonous oxide (senarmontite) has been developed on a laboratory scale. The conversion o
Jan 1, 1975
-
Port Inland OperationsBy J. E. Brownhill
This paper does not deal with the typical start-up issues of equipment, production capacity or work force. This is a description of the challenges faced and the changes made by the project team to bri
Jan 1, 1994