Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Equipment Task Simulator Used In Evaluation Of Operator Performance

    By M. Lotfi

    The criteria for evaluating equipment operator performance were identified as the changes in reaction time, the changes in physiological responses, and the changes in subjective reporting of stress. D

    Jan 1, 1989

  • SME
    Mill Sizing For Phosphate Grinding In Mills Of 0.2 To 5 Meters In Diameter (d139b3f1-183b-4de8-a58f-300e7f63761f)

    By Reed S. C. Rogers

    The breakage parameters of phosphate ore were determined by batch first-order grinding studies in a laboratory ball mill according to the procedures described in the text by Austin, Klimpel and Luckie

    Jan 1, 1985

  • SME
    The MX Trench Construction Project

    By G. M. Riddle

    As an important part of the concept validation phase of the MX Advanced ICBM development program, Air Force System Command's Intercontinental Ballistic Missiles (ICBM) Program Office developed an

    Jan 1, 1979

  • SME
    The Puffy Lake Gold Project

    By James R. Tompkins

    This paper details the successful progression of a promising exploration property into a producing gold mine in only 35 weeks on schedule and on budget. While under construction, an extensive explorat

    Jan 1, 1988

  • SME
    Microtunneling Challenges In Soft Ground Of Downtown Hartford, CT

    By William Bergeson

    This paper presents the challenges of the Homestead Avenue Interceptor Extension (HAIE) project in downtown Hartford, Connecticut. The new 72-inch (1,830 mm) sewer pipeline project consists of install

  • SME
    Non-Destructive Testing of in-Situ Underground Mine Seals: Preliminary GPR Assessment

    Numerous underground coal mine ventilation seals have been installed in the United States of America prior to 2006 and after implementation of the Mine Improvement and New Emergency Response (MINER) A

    Feb 23, 2014

  • SME
    Shaft Development At The Waste Isolation Pilot Plant

    By Dale A. Bivens

    INTRODUCTION The Waste Isolation Pilot Plant (WIPP) is currently being constructed for the United States Department of Energy in SE New Mexico. The purpose of the project is to store low level tran

    Jan 1, 1985

  • SME
    The Sir Adam Beck II Intake Tunnels—Homage To The Builders

    By Clair Murdock, David Heath

    The 1,280 MW Sir Adam Beck II Hydroelectric Project was constructed in the1950s, at Niagara Falls, Ontario, Canada. The twin intake tunnels total over 17 kilometers in length and pass deep below the C

    Jan 1, 2007

  • SME
    Performance Of A Pilot Refrigeration Plant For A Deep Coal Mine In Taiwan - Introduction

    By Patzen Wu

    The Hai-Shan No. 1 Coal Mine, located in northern Taiwan, is one of the typical coal mines on the island which, limited by natural condition, are mostly small in scale. With the advancing longwall met

    Jan 1, 1980

  • SME
    Typical Values Of Ventilation Parameters In Underground Coal Mines--Case Studies

    By John E. Urosek, Mark L. Mott, Gary E. Smith

    One function of Mine Safety and Health Administration (MSHA), Pittsburgh Health Technology Center's Ventilation Division is to provide assistance to MSHA enforcement and industry personnel for ma

    Jan 1, 1987

  • SME
    A Disappointing Year for Industrial Minerals Production

    A glance at the accompanying table reveals that for the first time in many years the industrial minerals field did not post significant gains in production. Gypsum, cement, sand and gravel, and cru

    Jan 5, 1980

  • SME
    Black Mountain – An Overview - The Resolution Of The Lands Unsuitable Petition From The Legal And Technical Perspectives

    By M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner

    In 1998, Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903 +/- hectares (22,000 +/- acres) o

    Jan 1, 2000

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    Underground Construction For A Combined Sewer Overflow System In Providence, Rhode Island

    By John L. Kaplin

    The underground construction for the Phase I Combined Sewer Overflow(CSO) Project is on an impressive scale by any measure, appearing more so in a midsize city like Providence, RI. The Narragansett Ba

  • SME
    Performance Of An Intelligent Proximity Detection System For Continuous Mining Machines

    By J. L. Carr

    Continuous mining machines are extensively used in the underground coal mining industry. These machines are typically remote-controlled, and severe injuries and fatalities occur every year when a mine

    Feb 27, 2013

  • SME
    Potential For High-Grade Manganese Deposits In North America

    By W. F. Cannon

    Many high-grade manganese deposits of the world occur in marine transgressive sedimentary sequences deposited on stable platforms. These include the Nikopol and related deposits in the Soviet Union an

    Jan 1, 1982

  • SME
    A Regressive Simulation Model Analysis Of Acoustic Pollution In Mining Engineering

    By C. Orf. Chukabarah

    Acoustic pollution (noise) is a significant mine environmental system problem. The U.S. Bureau of Mines (USBM), Environmental Protection Agency (EPA), Department of Labor (DOL) and other researchers h

    Jan 1, 1992

  • SME
    Stability Assessment Of A Wide Stops Excavation In A Lead-Zinc Mine

    By P. R. Sheorey, D. Barat, B. Singh

    Presented is a stability analysis for a trial stope in a lead-zinc mine. The trial scope would have an excavation width of 20 m with an initial height of 3 m. Filling would commence when the scope was

    Jan 1, 1981

  • SME
    Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons

    By J. J. Gusek

    Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without being reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land condition

    Jan 1, 1997

  • SME
    The Development Of A Mine Systems Engineering Program

    By R. V. Ramani

    This paper is based on the thesis that the demand for computer-oriented mining engineers will continue to sharply increase in coming years. It presents the philosophy behind the development of a mine

    Jan 1, 1982