Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Subsurface Investigations and Preliminary Design Considerations of the Montreal Metro Blue Line Extension ProjectBy Giovanni Osellame, Jean Habimana
"The Montreal Metro Blue Line Extension Project is part of a metropolitan Program that was launched in 2009 by the Transportation Ministry of Quebec to add additional extensions to existing metro line
Jan 1, 2016
-
Settlements Due to Blasting VibrationsBy Werner Bilfinger, Claudio Nahas, Marcelo Waimberg
"INTRODUCTION The so called Porto Maravilha Project consists of the re-urbanization of a 500 ha area in the Rio de Janeiro port region. Several changes in local infrastructure are being implemented, i
Jan 1, 2016
-
Sprayed Concrete for Frozen Ground in Hong KongBy Kenny Lo
"SummaryFor more than a century, ground freezing has been a construction technique used in stabilization of ground by means of lowering the temperature of surrounding soil strata. This technique is us
Jan 1, 2016
-
Structural Design of Composite Shell LiningsBy Johannes Jäger
"A composite shell lining typically consists of an outer permanent sprayed concrete shell, a water proofing layer and an inner sprayed or cast concrete shell. Composite shell linings become more and m
Jan 1, 2016
-
Upgrading of City of Genoa Railway Junction - Under-crossing with shallow distance of existing tunnels in urban environmentBy Nicola Beltrandi, Andrea Pigorini, Holad Mohamed Dahir, Ezio Pedone
"Genoa is a very distinctive city located between mountains and the sea and infrastructural upgrading works often have to deal with the intersection of existing infrastructures. This is the case for t
Jan 1, 2016
-
Urban Tunneling in San Francisco - A Replacement for Seismic Resiliency and RedundancyBy Art Hamid, Manfred Wong, Carlos Jaramillo, Greg Raines, John Caulfield
"The Central Bayside System Improvement Project (CBSIP) is a critical element of the Sewer System Im-provement Program (SSIP), a 20-year, $6.9-billion investment by the San Francisco Public Utilities
Jan 1, 2016
-
SFRC Segmental Lining Design for a Pressurised TunnelBy Sotiris Psomas, Colin M. Eddie
"Steel Fibre Reinforced Concrete (SFRC) Segmental Tunnel Linings have successfully been used for over 20 years in the UK and have been adopted in a number of high profile projects such as High Speed 1
Jan 1, 2016
-
Detecting Diesel Particulate Matter Using Real Time Monitoring Under the Influence of an Exhaust Fan SystemBy Y. H. Alghamdi, A. D. S. Gillies
"INTRODUCTION Background Diesel Particulate Matter (DPM) has been a critical issue during the last decade in underground mines. This problem is threatening the health of mine workers, as well as the m
Jan 1, 2016
-
The New Cable Way on the Mont Blanc in Italy: Underground Construction at High AltitudesBy Cancelli Paolo, Bragonzi Gianluca, Pelizza Sebastiano
"In May 2015 the New Monte Bianco aerial cableway, operating on the Italian side, have been completed. It connects the lower station in Pontal d’Entreves (1300 metres above sea level (m a.s.l.)) with
Jan 1, 2016
-
Pseudo Leadership and Safety CultureBy T. W. Camm
"Search Amazon.com using the keyword “leadership,” and you are rewarded with a list of over 144,000 titles. There is no shortage of books and articles, many of them well written, with excellent ideas.
Jan 1, 2016
-
Robotic Application of a 50mm Thick Sprayed Concrete Fireproofing LayerBy Eleanor Kentish, Edward Batty, Alan Skarda
"The design of the tunnels at Bond Street Station includes a final sprayed concrete fireproofing layer. The performance of this layer was verified by a program of testing to Crossrail’s KT24 specifica
Jan 1, 2016
-
Design of the Underground Structures of the Railway Link between the Town of Thumrait and the Port of Salalah: Segment 4c of the “Oman National Railway Project”By Pedone Ezio Michele, Mohamed Dahir Holad
"The 4c segment is a part of the ""Oman National Railway Project” linking the mining area in the surroundings of Thumrait and the port of Salalah. It is 90 km long and the last 40 km stretch crosses a
Jan 1, 2016
-
Sensitivity Analysis for Optimizing Co2 Injection to Improve Enhanced Coalbed Methane Recovery and Co2 Storage CapacityBy K. Louk, E. Gilliland, N. Ripepi, M. Karmis
"Carbon dioxide (CO2) injection in deep unmineable coal seams can enhance coalbed methane (CBM) recovery as well as effectively and permanently store the CO2. Enhanced coalbed methane (ECBM) recovery
Jan 1, 2016
-
Design of Inclined Braceless Excavation Support with Inclined Buttress Applicable to Deep ExcavationBy Yoichi Shimada, Katsuyuki Nishida, Shinichi Takahashi, Yasushi Okada, Yohei Nakamichi, Kazunori Oshiro, Taichi Terui, Sigehiko Sugie
"Temporary retaining walls are ordinarily used for tunnel construction work conducted using the opencut construction method. Retaining walls in such instances are typically installed vertically. Howev
Jan 1, 2016
-
Microscopic and Experimental Analysis of the Tribological System of TBM ToolsBy A. Röttger, W. Theisen, J. Küpferle, M. Alber
"Wear of TBM tools significantly affects tunneling advance rates. Wear-prediction models are based (amongst others) on the abrasivity of the present geology, which is determined via laboratory tests.
Jan 1, 2016
-
Skewed Portal Approach for Steep SlopesBy Leonardo Rosas Sánchez, Darío Ángel Bulla
"The two track road sector between Cisneros-Loboguerrero (having a length of 14 km and 11 short unidirectional tunnels) is a new highway still on construction located along the existing Highway Buga –
Jan 1, 2016
-
Predicting Anomalous Zone Ahead of TBM Tunnel Face Utilizing Electrical ResistivityBy Kang-Hyun Lee, In-Mo Lee, Byung-Kyu Kim, Parkm Jinho, Seoung-Won Lee
"In this study, the TBM Resistivity Prediction (TRP) system is developed for predicting the location, thickness, permittivity ratio and electrical conductivity of anomalous zones ahead of tunnel face
Jan 1, 2016
-
Avoiding Karst by Getting Under It - Jefferson Barracks Tunnel, St. LouisBy Patricia Pride, Kurt Bettger, Jack Raymer
"INTRODUCTION The Jefferson Barracks Tunnel is in the final stages of design and is expected to go out to bid in the summer of 2016. The project is located in south St. Louis County along the west ban
Jan 1, 2016
-
High Quality Rebuilds for Ensuring Resource and Ecological Efficiency in TunnelingBy Olivier Kraft, Olaf Kortz
"Project-specific optimized tunnel boring machines represent the spearhead of technological progress in tunneling because with their use, very long-lasting, high quality tunnel structures in almost an
Jan 1, 2016
-
Ventilation Challenges During Construction of Emergency Galleries - Austria’s Longest Road Tunnel (14km) Receives a Significant RenovationBy Rainer Antretter
"THE CHALLENGE The 14km long, Arlbergtunnel, closed for public traffic during summer 2015, receiving a comprehensive and substantial renovation from 2015 to 2017. The main works discussed here, carrie
Jan 1, 2016