Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023

    By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick

    California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i

    Jun 13, 2023

  • SME
    Metropolitan Water Tunnel Program in Massachusetts - RETC2023

    By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh

    Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o

    Jun 13, 2023

  • SME
    Los Angeles, California JWPCP Effluent Outfall Tunnel Project— Tunneling Under Extremely Challenging Conditions - RETC2023

    By R. Schuerch, C. Cimiotti, M. Piemontese, N. Karlin, P. Perazzelli, P. Halton

    The new Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to White Point Manifold. The tunnel will

    Jun 13, 2023

  • SME
    Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023

    By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines

    The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo

    Jun 13, 2023

  • SME
    Bypass Tunnel Shafts—Shotcrete Lining - RETC2023

    By Paul Madsen, Bade Sozer, Thomas Hennings, Eileen Test

    The Rondout Bypass Tunnel in New York has two access shafts. The upper sections of the shafts are lined with steel pipe to resist a substantial net internal water head . Initial design included a ¾-in

    Jun 13, 2023

  • SME
    Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023

    By Jake Coibion, Elmira Riahi, Dominic Reda, Walter Klary, Vojtech Gall

    Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowe

    Jun 13, 2023

  • SME
    Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023

    By Raphael Victor

    The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to

    Jun 13, 2023

  • SME
    Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023

    By Ross Goodman, Jean-Luc des Rivières

    The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining

    Jun 13, 2023

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • SME
    Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023

    By Karin Bäppler

    Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w

    Jun 13, 2023

  • SME
    Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023

    By Doug Harding

    The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single

    Jun 13, 2023

  • SME
    Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023

    By Stryker Magnuson

    While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl

    Jun 13, 2023

  • SME
    Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023

    By Ryan Ward

    The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans

    Jun 13, 2023

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • SME
    Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023

    By Denis Tepavac, Mark Trim

    Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design

    Jun 13, 2023

  • SME
    TBM Tunnel Offshore Connection - RETC2023

    By H. Vigil Fernandez, G. Peach

    The Musaimeer pump station and outfall project located in Doha Qatar, was designed to collect and manage ground and stormwater and then discharge the treated waters offshore. The project constructed a

    Jun 13, 2023

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • SME
    Corrosion and Leakage Remediation for WMATA Yellow Line Steel Tunnels - RETC2023

    By Tatiana Kotrikova, Steven Kolarz, Alan Kolodne, James Parkes, Matthew Goff

    The WMATA Yellow Line is the section of steel segmentally lined tunnels that have experienced leakage and significant corrosion in isolated areas. A three part rehabilitation design has been developed

    Jun 13, 2023

  • SME
    Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023

    By Enrico Pavese, Tim Kearney, Stefan Lemke

    Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag

    Jun 13, 2023

  • SME
    Cohesive Soil Conditioning Practice for Earth Pressure Balance Tunneling - RETC2023

    By Diana Diaz, Rakshith Shetty, Vitaly Proschenko, Mike Mooney

    Cohesive clay soil poses a significant risk to earth pressure balance tunnel boring machines (EPBM) due to unstable face pressure, clogging potential, high cutterhead torque, poor muck flow, low advan

    Jun 13, 2023