Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

    By Verya Nasri, Mehdi Bakhshi

    The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five

    Dec 1, 2022

  • SME
    Freight Trains in Tunnels—Operational & Safety Aspects from the Tunnel Ventilation Perspective - NAT2022

    By Bernd Hagenah, Hans-Peter Vetsch, Eric Jones, Sean Cassady, Danielle Johnson, Petr Pospisil

    There are a number of issues associated with freight trains in non-electrified tunnels that are fundamental during the planning and operation of a rail tunnel. During uphill operation, increased air t

    Dec 1, 2022

  • SME
    Design and Construction Challenges for the North Temple Tunnel - NAT2022

    By Todd Kilduff, Michael Tinney

    The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En

    Dec 1, 2022

  • SME
    Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022

    By R. Aliberti, E. Comis, M. Wone

    DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov

    Dec 1, 2022

  • SME
    Hard Rock Tunnel Boring in Challenging Conditions at the Jefferson Barracks Tunnel - NAT2022

    By Doug Harding

    The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting wastewater capacity throughout St. Louis, MO. The extensive program includes the Jefferson Barracks Tunnel, run

    Dec 1, 2022

  • SME
    Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022

    By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown

    The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res

    Dec 1, 2022

  • SME
    Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022

    By T. Murt, C. Oñate

    In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o

    Dec 1, 2022

  • SME
    Effect of Machine and Operational Parameters on Utilization Factor -NAT2022

    By Omid Frough, Hossein Changani

    Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a

    Dec 1, 2022

  • SME
    Built to Last? A UK Initiative to Manage Tunnel Infrastructure - NAT2022

    By Martin Knights

    The UK Industry is preparing a new guide on Tunnel Asset Management that reflects current industry advances, in developed technological innovation and evolving tunnel asset owner requirements. This wi

    Dec 1, 2022

  • SME
    The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022

    By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi

    Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T

    Dec 1, 2022

  • SME
    Slurry Wall Construction in Coarse-Grained Soils - NAT2022

    By J. Andrew McGlenn, Greg Emslie, Murray Gant

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon

    Dec 1, 2022

  • SME
    Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022

    By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin

    Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t

    Dec 1, 2022

  • SME
    Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022

    By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent

    The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit

    Dec 1, 2022

  • SME
    Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022

    By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert

    The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover

    Dec 1, 2022

  • SME
    Emerging Safety and Productivity Technologies for North American Tunneling - NAT2022

    By David Maust, Rob Albinger, Mike Walling, Michael Rispin

    The safeguarding of health and life is the number one priority for underground infrastructure projects. While culture and approach are critically important, the industry has also seen the development

    Dec 1, 2022

  • SME
    Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022

    By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn

    BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental

    Dec 1, 2022

  • SME
    Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022

    By Chris D. Breeds

    Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align

    Dec 1, 2022

  • SME
    Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022

    By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann

    The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside

    Dec 1, 2022

  • SME
    Courthouse Commons Tunnel: A Case Study of Modern SEM Tunneling - NAT2022

    By Yiming Sun, John Stolz, Jakob Walter, Drew Mason

    The Courthouse Commons SEM Tunnel was excavated within 6 feet of cover beneath two buildings in downtown San Diego utilizing high-precision geotechnical instrumentation. The excavated dimensions are a

    Dec 1, 2022

  • SME
    Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International Airport

    By Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson

    Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas

    Dec 1, 2022