Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022
By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to
Dec 1, 2022
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022
By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022
By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Characterizing Gassy Ground and Its Importance - NAT2022
By Barry R. Doyle, Emma C. Ross
This paper presents a 20-year global account of tunneling in gassy ground demonstrating high probability of schedule delays, cost overruns, worker injuries and fatalities. Causes of these failures are
Dec 1, 2022
-
Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022
By Justin Kolster, Donald Benjamin, Kyle White
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re
Dec 1, 2022
-
Breaking Conway’s Law: Getting the Benefits from Integrated Design Automation - NAT2022
By David Wright, Jerome Chamfray, Anthony Harding, Brian Boye
Conway’s Law states that unless we intentionally design automation tools around what we need, we will simply replicate our existing processes. While we may achieve some savings this way, there is an o
Dec 1, 2022
-
Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMs
By G. A. Rosario, G. Peach
Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn
Dec 1, 2022
-
Benefits and Challenges of Progressive Design-Build Procurement— Atlanta Plane Train Project - NAT2022
By John Murray, Daniel Ebin, Robert Gould
The Atlanta Plane Train project at Hartsfield-Jackson Atlanta International Airport employed the progressive design-build approach. This provided opportunities for collaboration between the design-bui
Dec 1, 2022
-
Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022
By Gino Vogt
In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation
Dec 1, 2022
-
Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022
By Todd Kilduff, James Grillo, Shrey Arora
In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine
Dec 1, 2022
-
Construction Challenges of the Anderson Dam Tunnel Project - NAT2022
By Ron Drake
The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An
Dec 1, 2022
-
Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022
By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick
The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept
Dec 1, 2022
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022
By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
The State of DRB’s in the Tunnel Industry - NAT2022
By David Hatem, Michael Vitale, Joseph Gildner, Michael Roach, Fred Dunham
Dispute Review/Resolution Boards (DRB’s) are a highly successful dispute avoidance and resolution tool. In a joint effort between the UCA of SME and the Dispute Resolution Board Foundation (DRBF), the
Dec 1, 2022
-
Historic Rock Tunnel Rehabilitation—Designing for the Unknown - NAT2022
By Ryan Marsters, Adam Pring, Robin Dornfest
Raw water supply in the central Rocky Mountains often relies on trans-basin conveyance. Many of these older diversions incorporate high-elevation, miles-long tunnels driven over a century ago in hard
Dec 1, 2022
-
Underpinning of an Operational Subway Aided by Mined Galleries - NAT2022
By Thomas Schwind, Elmar Feigl, Gerald Skalla, Angelos Gakis
Cedarvale station was constructed as part of the Eglinton Crosstown Light Rail Line, under the operational Yonge-University Line Subway box of Toronto Transit Commission (TTC). The station was constru
Dec 1, 2022
-
Investigation Of Explosion Hazard In Longwall Coal Mines By Combining Cfd With A 1/40th-scale Physical Model
By A. Juganda, F. WILSON, G.E. BOGIN, H. PINHEIRO, N. SANDOVAL, J.F. BRUNE
To evaluate methane explosion hazards in underground longwall coal mines, researchers at the Colorado School of Mines developed a computational fluid dynamics (CFD) model along with a 1/40th-scale, op
Dec 1, 2022
-
Analysis Of Steel Prop Supports Subjected To Vertical And Lateral Loading
By Timothy Batchler, Khaled Mohamed
Standing supports have been used in coal mines for decades to enhance roof support capability. Occasionally, standing supports are used to resist the lateral movement of spalled ribs. Researchers from
Dec 1, 2022
-
Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022
By Ali Kazmi, Wern-ping N. Chen
A load rating procedure was performed to evaluate safe load capacity of the Port of Miami Tunnel (POMT), FDOT Tunnel No. 871071 SR 887. The rating procedure performed on a total of eleven stations ben
Dec 1, 2022
-
Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022
By John Newby, Edward Kennedy, Ulf Gwildis
Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi
Dec 1, 2022